19 Coal-Fired Thermal Power Plant Feed Water Heating System Feed Heater
21 Coal-Fired Thermal Power Plant Ash and Emission Control System Ash Hopper
22 Coal-Fired Thermal Power Plant Ash and Emission Control System Precipitator
23 Coal-Fired Thermal Power Plant Ash and Emission Control System Inducted Draught Fan
24 Coal-Fired Thermal Power Plant Ash and Emission Control System Chimney Stack
25 Coal-Fired Thermal Power Plant Electrical and Distribution System Electric Generator (3-phase)
26 Coal-Fired Thermal Power Plant Electrical and Distribution System Unit Transformer (3-phase)
27 Coal-Fired Thermal Power Plant Electrical and Distribution System Transmission Line (3-phase)
Reliability Data of Coal Fired Thermal Power Plant
Reliability of System
• In the already made RBD, all the assets were made series, except for one asset, that is the cooling tower, which
was made parallel. To calculate the parallel part is:
•Combined-cycle gas and steam turbine power plant reliability analysis. (n.d.).
https://www.researchgate.net/publication/278708235_Combined-
Cycle_Gas_and_Steam_Turbine_Power_Plant_Reliability_Analysis
•(2023). Reliability Block Diagrams (RBD). YouTube. Retrieved October 3, 2023, from
https://youtu.be/D4bgQln-idQ.