You are on page 1of 2

ANTI-DENGUE REPORT CHECKLIST

LAMPIRAN C
[BORANG DENGGI 2/2017]

PROGRAM KAWALAN DENGGI DI TAPAK BINA 2017


(DENGUE CONTROL PROGRAM AT CONSTRUCTION SITE 2017)

MAKLUMAT PROJEK
1. Projek Package A4: Proposed Construction of Batang Saribas Bridge No. 2 At Kuala Saribas,
Betong Division
2. Daerah Betong 3. Negeri Sarawak
4. Pegawai Penguasa Superintending Officer 5. Wakil Pegawai Deputy Superintending Officer
(CSTRU), JKR HQ Penguasa (CSTRU), JKR HQ
6. Kontraktor PCSB CCEED JV S/B 7. Nilai Kontrak RM 385,000,000.00
PEMERIKSAAN TAPAK BINA TEMPOH 26 Sept 2022 hingga 25 Oct 2022
1. Tarikh & Masa 07 Oct 2022 2. Tindakkan * Sudah / Belum
Pemeriksaan Pencegahan *

Basement Bangunan √ Longkang √ Tong Drum


Saluran Lif √ Bekas Makanan √ Tanki
√ Lantai √ Blok Bata √ Kanvas
√ Balkoni / Veranda √ Pembancuh Simen √ Tong Cat / Kimia
√ Lubang Cerucuk √ Kereta Sorong √ Botol
√ Saluran Air √ Acuan (Formwork) √ Bahan Besi Terpakai
Tandakan √ jika tindakkan pemeriksaan dan pencegahan telah dibuat.

SEMBURAN KABUS (FOGGING) TEMPOH

Semburan kabus mingguan Tarikh


Semburan kabus selepas hujan Tarikh

AKTIVITI KAWALAN TEMPOH 26 Sept 2022 hingga 25 Oct 2022

√ 10 minit hapuskan tempat pembiakan Meletakkan abate dalam tanki air


Menambahbaik pengurusan sampah Sistem saliran berfungsi / mengalir

Pegawai Bertanggungjawab : Ma Fu Jian No. Tel : 013-7921314


Tandatangan :
Jawatan : Pengurus Pembinaan Tarikh : 07 Oct 2022
ANTI-DENGUE REPORT CHECKLIST
LAMPIRAN C
[BORANG DENGGI 2/2017]

PROGRAM KAWALAN DENGGI DI TAPAK BINA 2017


(DENGUE CONTROL PROGRAM AT CONSTRUCTION SITE 2017)

MAKLUMAT PROJEK
8. Projek Package A4: Proposed Construction of Batang Saribas Bridge No. 2 At Kuala Saribas,
Betong Division
9. Daerah Betong 10. Negeri Sarawak
11. Pegawai Superintending Officer 12. Wakil Deputy Superintending Officer
Penguasa (CSTRU), JKR HQ Pegawai (CSTRU), JKR HQ
Penguasa
13. Kontraktor PCSB CCEED JV S/B 14. Nilai RM 385,000,000.00
Kontrak
PEMERIKSAAN TAPAK BINA TEMPOH 26 Sept 2022 hingga 25 Oct 2022
3. Tarikh & Masa 21 Oct 2022 4. Tindakkan * Sudah / Belum
Pemeriksaan Pencegahan *

Basement Bangunan √ Longkang √ Tong Drum


Saluran Lif √ Bekas Makanan √ Tanki
√ Lantai √ Blok Bata √ Kanvas
√ Balkoni / Veranda √ Pembancuh Simen √ Tong Cat / Kimia
√ Lubang Cerucuk √ Kereta Sorong √ Botol
√ Saluran Air √ Acuan (Formwork) √ Bahan Besi Terpakai
Tandakan √ jika tindakkan pemeriksaan dan pencegahan telah dibuat.

SEMBURAN KABUS (FOGGING) TEMPOH

Semburan kabus mingguan Tarikh


Semburan kabus selepas hujan Tarikh

AKTIVITI KAWALAN TEMPOH 26 Sept 2022 hingga 25 Oct 2022

√ 10 minit hapuskan tempat pembiakan Meletakkan abate dalam tanki air


Menambahbaik pengurusan sampah Sistem saliran berfungsi / mengalir

Pegawai Bertanggungjawab : Ma Fu Jian No. Tel : 013-7921314


Tandatangan :
Jawatan : Pengurus Pembinaan Tarikh : 21 Oct 2022