LAMPIRAN C
[BORANG DENGGI 2/2017]
MAKLUMAT PROJEK
1. Projek Package A4: Proposed Construction of Batang Saribas Bridge No. 2 At Kuala Saribas,
Betong Division
2. Daerah Betong 3. Negeri Sarawak
4. Pegawai Penguasa Superintending Officer 5. Wakil Pegawai Deputy Superintending Officer
(CSTRU), JKR HQ Penguasa (CSTRU), JKR HQ
6. Kontraktor PCSB CCEED JV S/B 7. Nilai Kontrak RM 385,000,000.00
PEMERIKSAAN TAPAK BINA TEMPOH 26 Sept 2022 hingga 25 Oct 2022
1. Tarikh & Masa 07 Oct 2022 2. Tindakkan * Sudah / Belum
Pemeriksaan Pencegahan *
MAKLUMAT PROJEK
8. Projek Package A4: Proposed Construction of Batang Saribas Bridge No. 2 At Kuala Saribas,
Betong Division
9. Daerah Betong 10. Negeri Sarawak
11. Pegawai Superintending Officer 12. Wakil Deputy Superintending Officer
Penguasa (CSTRU), JKR HQ Pegawai (CSTRU), JKR HQ
Penguasa
13. Kontraktor PCSB CCEED JV S/B 14. Nilai RM 385,000,000.00
Kontrak
PEMERIKSAAN TAPAK BINA TEMPOH 26 Sept 2022 hingga 25 Oct 2022
3. Tarikh & Masa 21 Oct 2022 4. Tindakkan * Sudah / Belum
Pemeriksaan Pencegahan *