You are on page 1of 1

550.

00
25.00
25.00 100.00 200.00 100.00
Native Land Elv. -0.45 Gabion
High Water Level Elv. -0.70 Geotextile
50.00 50.00
Native Land Elv. -0.95
50.00 50.00150.00
200.00 205.00 98.00
Native Land Elv. -1.70
50.00 50.00
75.00
50.00
Bamboo Piling L 3.5m @7Pcs Bamboo Piling L 3.5m @5Pcs
350.00
KP 0+100
Scale 1:50
AS BUILT
AB 24/12/2023 As Built YGRP AARP AF MM
Re-Submitted Approved for
0 12/12/2022 YGRP AARP AF SS 1:50 HCML-GMS-DOC-PN-ASB-001
1. Dimention in cm
Construction
Re-Issued Approved for Sheet 6 of 32
2. See document HCML-GMS-DOC-PN-PRO-014 for detail Gabion Calculation Phase 1 D 24/10/2022 YGRP AARP AF SS
Construction
C 21/10/2022 Approved for Construction YGRP AARP AF SS Rectification of ROW Gas Metering Station
B 17/10/2022 Issued for Approval YGRP AARP AF SS
A 07/09/2022 Issued for Review YGRP AARP AF SS
App'd
PT PUTRA NEGARA
Section and Elevation 0