CONSTRUCTION OF BUILDING

STEPS:
1. LAY OUT OF THE PLOT (SITE FOR CONST.).
2. LAY OUT OF BASEMENT/G.F PLAN.
3. LAY OUT OF FOUNDATION/PLINTH LEVEL (P.L) PLAN.
4. EXCAVATION OF FOUNDATION/FOOTING.
5. LEAN CONC. IN EXCAVATED FOUNDATION.
6. LAYING OF R.C.C STEEL MESH (JAL).
7. POURING OF CONC. 1:2:4 OR ELSEWHERE IN FOUNDATION.
8. ERRECTION OF COLUMN UP TO P.L BEFORE POURING OF FOUNDATION.
9. ERRECTION OF STEEL COLUMN ALSO UPTO SILL LEVEL.
10. LEVELLING/ DRESSING WITH FORMWORK UP TO P.L.
11. REINFORCEMENT/ ERRECTION/ LAYOUT OF PLINTH BEAM WITH RINGS.
12. POURING OF PLINTH BEAM ALONG WITH COLUMN UP TO P.L.
13. DPC ON PLINTH BEAM WITH TERMITE PROOFING AT 3 X STAGES i.e. IN TRANCHES, ON
PLINTH BEAM LEVEL & ON SILL LEVEL.
14. BLOCK MASONRY ON PLINTH BEAM UP TO SILL LEVEL BEFORE LAYING OF SEWAGE,
WATER SUPPLY & DRAINAGE LINES.
15. COMPACTED EARTH IN PLINTH BEAM LAYOUT COMPACTED FILLING.
16. LEAN FOR FLOORING 1:4:8 AFTER LAYING OF SEWAGE / WATER SUPPLY/ ELECTRIC
CABLES/ EARTHING etc.
17. CONCRETING OF COLUMNS UPTO SILL LEVEL.
18. BLOCK MASONRY UPTO SILL LEVEL IF NOT DONE BEFORE.
19. FIXING OF DOORS/ WINDOWS BEFORE PLASTER FIXING LEVEL IF NOT INSTALLED
DOORS/ WINDOWS OTHERWISE, WOODEN DOOR FRAMES WILL BE FIXED AT MASONRY
LEVEL.
20. PREPARATION OF ROOF BEAM/ ROOF FOR REINFORCEMENT/ POURING.
21. BEAM/ ROOF/ STAIRCASE POURING ALONG WITH O.H.W.T & U.G.W.T AT DIFFERENT
PHASES.
22. FINISHING WORK, PLASTER, PAINT, CABLING etc.
23. GO FOR FINISHES ACCORDING TO DRAINING etc. WITH FACADE WORK
(ELEVATION WORK)
24. STEEL GRILLS/ GATE etc. SIDE BY SIDE WITH MASONRY/ PLASTER etc.
25. FIXING/ INSTALLATION OF ELECTRICAL/ PLUMBING/ SANITARY WITH LOCKING DOORS
ARRANGEMENT/ HARDWARE/ CABINETS/ KITCHEN CABINETS etc.
26. READY FOR HANDING OVER WITH SUPPLY OF SERVICES K.ELECTRICAL/ SUIGAS/
TELEPHONE/ INTERNET/ CCTV. ALL NECESSARY ARRANGEMENTS ACCORDING TO
DESIRE/DRAWING.