You are on page 1of 2

PAYMENT SCHEDULE

SG
PO LD
EC IAL GOLD CATEGORY
5 BED DRAWING & LOUNGE

DESCRIPTION AMOUNT

BOOKING 3 , 7 0 0 , 0 0 0 /-

CO N F I R M AT I O N 3 , 7 0 0 , 0 0 0 /-

A L LO CAT I O N 3 , 7 0 0 , 0 0 0 /-

STA RT O F WO R K 3 , 7 0 0 , 0 0 0 /-

M O N T H LY I N S T A L L M E N T S ( 4 0 X 1 6 7, 0 0 0 /- ) 6 , 6 8 0 , 0 0 0 /-

H A L F Y E A R LY I N S T A L L M E N T S ( 7 X 7 0 0 , 0 0 0 /- ) 4 , 9 0 0 , 0 0 0 /-

ON PLINTH 1 , 0 0 0 , 0 0 0 /-

ON BLOCK MASONRY 1 , 0 0 0 , 0 0 0 /-

PLASTER WORK 1 , 0 0 0 , 0 0 0 /-

ON COLORING WORK 1 , 0 0 0 , 0 0 0 /-

ON ELECTRIC WORK 1 , 0 0 0 , 0 0 0 /-

ON FLOORING 1 , 0 0 0 , 0 0 0 /-

ON FINISHING 1 , 0 0 0 , 0 0 0 /-

ON POSSESSION 3 , 6 2 0 , 0 0 0 /-

TOTAL AMOUNT 3 7, 0 0 0 , 0 0 0 /-

EXTRA CHARGES

ADDITIONAL PARKING: PKR.1, 800,000

NOTE:

1. Terms & Conditions given in application form are the essence of this payment schedule and the buyer undertake to abide by the sa
2. All installments must be paid before the 10th of every month.
3. All extra charges will be paid within 180 days after the date of booking.
4. The cost of unit does not include Sales Tax, Government levies, Ground Rent Sub-Lease/Sale Deed execution charges,
documentation charges, development charges which are inclusive of all taxes, connection and meter charges, deposit of electricit
gas, water, sewerage and loan processing charges, such charges/expenses including any miscellaneous expenses which

5. Discount given to the client shall be valid on regular payment, failing to follow payment schedule will cause a deduction
at the time of possession.
UNIT FLOOR PLAN

A
BEDROOM
SPECIAL GOLD CATEGORY B
BEDROOM
11’X17’ 11’X13’

6 ROOMS APARTMENT - 2455 SQ.F T (APPROX)

ENTRANCE

C D
BEDROOM
P J BEDROOM
11’X13’ M 11’X17’

k
L

E F
BEDROOM BATHROOM
11’X14’ 6’X6’

G H
BATHROOM BATHROOM
6’X6’ 6’X6’

N O

I J
BATHROOM BATHROOM
6’X6’ 6’X6’

P
L M N O P 2 PARKINGS
LIVING ROOM KITCHEN TERRACE TERRACE STORE 11’X16’
22’X18’ 7’X9’ 10’X6’ 10’X6’ 5’X6’ 2.5’X5’

READ & ACCEPTED BY BUYER

NAME:

CONTACT NO:
SIGNATURE

TOWER: FLOOR: UNIT NO:


FOR & ON BEHALF OF

TOTAL COST:

SIGNATURE

You might also like