You are on page 1of 1

June 23, 2023

SUMMARY OF COMPLIANCE

Condi ons Status


1. Submit Quarterly Monitoring Report Complied
2. Submit Hazardous Waste Generator ID Complied
3. The establishment of Pollu on Control Officer, Engr. Byron Complied
James G. Torio shall strictly comply with the above s pula ons
and shall be responsible for the ensuring that any emissions of
air pollutants from abnormal or unexpected events do not
cause air pollu on in the surrounding air environment or have
adverse effects on the persons in that environment.
4. Allow the entry of our duly authorized representa ve(s) to Complied
conduct inspec on within the premises.
5. The Permit To Operate shall be securely framed and posted in a Complied
conspicuous place at the establishment.
6. The Permit shall be renewed thirty (30) days prior to its Complied
expira on.

Prepared By:

Engr. Byron James G. Torio


Pollu on Control Officer

You might also like