Specific Training: Proposed Road Projects Interlock Works
Specific Training: Proposed Road Projects Interlock Works
Outcome
Foot path
2.4 NOC Document preparation and Submission Responsibilities
Draughtsman Responsibility NOC Engineer Responsibility
• Ensure Coordinates in the Drawing. • Ensure Technical clarity.
1 1
• Ensure Digital Clarity in the Drawing. • Attach Trial Pit Verification. (Wherever Applicable)
2 2
• Ensure No Congestion in the Drawings. • Assign Proper File Name and Drawing Name.
3 3
• Ensure Proper DEWA Legends. • Proper Subject in RTA portal “Work Description”.
4 4
• Ensure Readable Fonts Size. • Avoid Attaching Unnecessary Documents.
5 5
• Prepare Method statement as per site condition
• Ensure Readable Fonts Color.
6 6 and project execution.
• Avoid Duplicate Submission for same activity in
• No Text Mask.
7 7 the same location.
• No Google Map drawings. • Ensure Consultant Stamp Wherever Applicable.
8 8
• Don’t Use Low Resolution Scanners for • Company name should be same in the drawing
9 Scanning Signed Documents. 9 and in the RTA Portal.
RTA Portal
DEWA
1. Mention Type of Traffic Sign boards in the layout. 1. Kerb stone above DEWA
services/corridor.
2. Mention road furniture details.
2. Foot path with PCC.
3. Existing DEWA assets to be protected at building access.
8. Site photos.
File name Scanned document File
Name
2. Electricity Superimposed
and Trial pit