Professional Documents
Culture Documents
General Notes:: Ground Floor Potable Water Line Layout 1
General Notes:: Ground Floor Potable Water Line Layout 1
03 ALL PIPE SIZE ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED. STORAGE
04 ALL WORKS SHALL CONFORM TO BUILDING OWNER REQUIREMENTS OR GUIDELINES AND VISIT SITE CONDITION
AND INCLUDE ALL COST EXPENSES NECESSARY TO COMPLETE THE SYSTEMS.
D2
05 COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, THE DESIGN ENGINEER
SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN.
06 ALL PIPE SIZE SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED FOR PROPER
EXECUTIONS OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR DESIGNER. WC WC FD FD
07 PROPOSED PLUMBING/ SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT
ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. FOOD/ SNACK SHELVES FOOD/ SNACK SHELVES
09 SIZE OF SEWER AND WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS
INSTRUCTIONS.
10 THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATES THE WORKS WITH THE
SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT.
THE CONTRACTOR SHALL BE RESPONSIBLE ON SITE COORDINATION, PREPARE CONSTRUCTION SHOP COUNTER COUNTER
11
DRAWING, FIXTURES AND EQUIPMENTS DIMENSION / VERIFICATION. INFORM OR ADVICE OWNER / STAIR STAIR
ARCHITECT / ENGINEER OR ANY TECHNICAL / MAINTENANCE PROBLEM FOUND HEREIN ON SITE.
12 THE CONTRACTOR SHALL INCLUDE ALL COST OR EXPENSES NECESSARY TO COMPLETE THE SYSTEM AND
TESTING REQUIREMENT BY BUILDING OWNER.
13 ALL GREASE TRAP INSTALLATION SHALL BE PROVIDED WITH VENT ON ITS OUTLET AND CLEAN-OUT BEFORE
TAPPING POINT FOR KITCHEN SINK.
14 CLEAN-OUT SHALL BE INSTALLED NOT TO EXCEED 15METERS ON STRAIGHT RUN AND FOR EACH AGGREGATE
CHANGE IN DIRECTION EXCEEDING 135 DEGREE.
15 CONTRACTORS SHALL BE RESPONSIBLE FOR REPAIR, DECLOGGING, RELEASING OF EXISTING SEWER, VENT AND
WATERLINES UP TO BLDG. MAIN LINE. ALL EXPENSES IN ACCOUNT OF CONTRACTOR'S.
16 ALL PLUMBING PIPES AND EQUIPMENT SHOULD BE INSTALLED IN ACCORDANCE WITH PLUMBING CODE AND HAVE
A SUFFICIENT WORKING CLEARANCE OR SPACE FOR MAINTENANCE / REPAIR WORKS.
17 USE 75mmØ PIPE FOR FLOOR DRAIN MINIMUM PIPE SIZE OR OTHERWISE SPECIFIED IN SPECIFICATIONS.
18 ALL SEWER / WASTE LINES, FCU DRAINS SHALL BE PROVIDED WITH 12mm (21") THICK CLOSE CELL
ELASTOMERIC THERMAL INSULATION (AEROFLEX) FOR FCU DRAIN PIPE INSTALLED ABOVE CEILING AND
PROVIDE P-TRAP ON DRAIN LINE FOR FCU ON APPROVE LOCATION. NO DOUBLE TRAP SHALL BE USE.
19 THE CONTRACTORS SHALL BE RESPONSIBLE FOR CHIPPING WORKS, EXCAVATION WORKS AND INSTALLATION OF
PLUMBING PIPES AND FIXTURES, UNLESS OTHERWISE SPECIFIED IN CONTRACT.
20 THE BUILDING OWNER/ CONTRACTOR SHALL MAINTAIN THE PLUMBING AND DRAINAGE SYSTEM OF HIS PREMISES
IN ACCORDANCE WITH SANITARY AND SAFE OPERATING CONDITION.
21 WATER PIPE/ LINES SHALL BE 300mm ABOVE THE TOP OF SEWER OR DRAINAGE PIPE/ LINES.
DISTANCE OF 300mm BETWEEN WATER PIPE AND SEWER OR DRAINAGE PIPE, IF PLACE WITH SAME TRENCH .
22 PLUMBING CONTRACTOR SHALL VERIFY AND INVESTIGATE THE ACTUAL EXISTING PIPE SLOPES AND DIRECTION
OF WATER/ SEWER LIQUID FLOW PRIOR TO START OF PIPE INSTALLATION. STAIR STAIR
NC
METER LAVATORY
0.15
0.15
UNION
32mmØ PPR PATENTE 50mmØ PVC
CWL PIPE
TO FIXTURES TO FIXTURES P-TRAP
300
FLEXIBLE HOSE
90
ANGLE
15mmØ CWL 15mmØ CWL VALVE
WALL
32mmØ CWL
(VERIFY TAPPING
POINT)
FFL
-
P-01 9
PTR No. - Date Issued: -
ELECTRICAL ENGINEER -
Place: TIN: - - 9
LOCATION: - LOCATION: - SCALE: VARIES