You are on page 1of 1

GENERAL NOTES: VERIFY LOCATION

VENT THRU ROOF


01 ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE PHILIPPINE PLUMBING GV GVCV
CODE, THE NATIONAL BUILDING CODE, AND THE RULES AND REGULATION OF LOCAL GOVERNMENT M FCO FD
AUTHORITIES CONCERNED. HB
TAP TO EXISTING
02 ALL WORKS SHALL BE DONE UNDER DIRECT SUPERVISION OF LICENSE AND REGISTERED MASTER PLUMBER
OR PLUMBER ENGINEER. WATER LINE WC

03 ALL PIPE SIZE ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED. STORAGE

04 ALL WORKS SHALL CONFORM TO BUILDING OWNER REQUIREMENTS OR GUIDELINES AND VISIT SITE CONDITION
AND INCLUDE ALL COST EXPENSES NECESSARY TO COMPLETE THE SYSTEMS.
D2
05 COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, THE DESIGN ENGINEER
SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN.

06 ALL PIPE SIZE SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED FOR PROPER
EXECUTIONS OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR DESIGNER. WC WC FD FD

07 PROPOSED PLUMBING/ SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT
ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. FOOD/ SNACK SHELVES FOOD/ SNACK SHELVES

VENT THRU ROOF


08 ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 2% UNLESS OTHERWISE SPECIFIED.
DRINKS DRINKS LAV LAV DRINKS DRINKS
MALE FEMALE
ALL SLOPES FOR HORIZONTAL SEWER SHALL MAINTAIN 1% UNLESS OTHERWISE SPECIFIED. TOILET TOILET

09 SIZE OF SEWER AND WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS
INSTRUCTIONS.

10 THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATES THE WORKS WITH THE
SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT.

THE CONTRACTOR SHALL BE RESPONSIBLE ON SITE COORDINATION, PREPARE CONSTRUCTION SHOP COUNTER COUNTER
11
DRAWING, FIXTURES AND EQUIPMENTS DIMENSION / VERIFICATION. INFORM OR ADVICE OWNER / STAIR STAIR
ARCHITECT / ENGINEER OR ANY TECHNICAL / MAINTENANCE PROBLEM FOUND HEREIN ON SITE.

12 THE CONTRACTOR SHALL INCLUDE ALL COST OR EXPENSES NECESSARY TO COMPLETE THE SYSTEM AND
TESTING REQUIREMENT BY BUILDING OWNER.

13 ALL GREASE TRAP INSTALLATION SHALL BE PROVIDED WITH VENT ON ITS OUTLET AND CLEAN-OUT BEFORE
TAPPING POINT FOR KITCHEN SINK.

14 CLEAN-OUT SHALL BE INSTALLED NOT TO EXCEED 15METERS ON STRAIGHT RUN AND FOR EACH AGGREGATE
CHANGE IN DIRECTION EXCEEDING 135 DEGREE.

15 CONTRACTORS SHALL BE RESPONSIBLE FOR REPAIR, DECLOGGING, RELEASING OF EXISTING SEWER, VENT AND
WATERLINES UP TO BLDG. MAIN LINE. ALL EXPENSES IN ACCOUNT OF CONTRACTOR'S.

16 ALL PLUMBING PIPES AND EQUIPMENT SHOULD BE INSTALLED IN ACCORDANCE WITH PLUMBING CODE AND HAVE
A SUFFICIENT WORKING CLEARANCE OR SPACE FOR MAINTENANCE / REPAIR WORKS.

17 USE 75mmØ PIPE FOR FLOOR DRAIN MINIMUM PIPE SIZE OR OTHERWISE SPECIFIED IN SPECIFICATIONS.

18 ALL SEWER / WASTE LINES, FCU DRAINS SHALL BE PROVIDED WITH 12mm (21") THICK CLOSE CELL
ELASTOMERIC THERMAL INSULATION (AEROFLEX) FOR FCU DRAIN PIPE INSTALLED ABOVE CEILING AND
PROVIDE P-TRAP ON DRAIN LINE FOR FCU ON APPROVE LOCATION. NO DOUBLE TRAP SHALL BE USE.

19 THE CONTRACTORS SHALL BE RESPONSIBLE FOR CHIPPING WORKS, EXCAVATION WORKS AND INSTALLATION OF
PLUMBING PIPES AND FIXTURES, UNLESS OTHERWISE SPECIFIED IN CONTRACT.

20 THE BUILDING OWNER/ CONTRACTOR SHALL MAINTAIN THE PLUMBING AND DRAINAGE SYSTEM OF HIS PREMISES
IN ACCORDANCE WITH SANITARY AND SAFE OPERATING CONDITION.

21 WATER PIPE/ LINES SHALL BE 300mm ABOVE THE TOP OF SEWER OR DRAINAGE PIPE/ LINES.
DISTANCE OF 300mm BETWEEN WATER PIPE AND SEWER OR DRAINAGE PIPE, IF PLACE WITH SAME TRENCH .

22 PLUMBING CONTRACTOR SHALL VERIFY AND INVESTIGATE THE ACTUAL EXISTING PIPE SLOPES AND DIRECTION
OF WATER/ SEWER LIQUID FLOW PRIOR TO START OF PIPE INSTALLATION. STAIR STAIR

ABBREVIATIONS VERIFY LOCATION


LAV. LAVATORY 1 GROUND FLOOR POTABLE WATER LINE LAYOUT ON SITE
W.C. WATER CLOSET P-01 SCALE: 1:100
WP WATER PUMP
UP UNION PATENTE
AV ANGLE VALVE
GV GATE VALVE
SV SHOWER VALVE
SH SHOWER HEAD
TAP TO EXISTING
F FAUCET
SANITARY LINE
GF GARDEN FAUCET
CO CLEAN OUT
FD
WH
FLOOR DRAIN
WATER HEATER
20mmØ AIR
2 GROUND FLOOR DRAINAGE & SANITARY LINE LAYOUT
SS SOIL STACK P-01 SCALE: 1:100
CAP
CB CATCH BASIN
20mmØ AIR
0.45

NO NORMALLY OPEN GATE WATER CAP


NORMALLY CLOSE VALVE WALL HUNG
0.3

NC
METER LAVATORY
0.15

0.15

UNION
32mmØ PPR PATENTE 50mmØ PVC
CWL PIPE
TO FIXTURES TO FIXTURES P-TRAP

300
FLEXIBLE HOSE

90
ANGLE
15mmØ CWL 15mmØ CWL VALVE
WALL
32mmØ CWL
(VERIFY TAPPING
POINT)
FFL

32mmØ PPR CWL


PROPOSED COLD TO SUPPLY
200 200
WATER LINE(VERIFY
6 VENT THRU ROOF DETAILS
FROM SUPPLY FROM SUPPLY
TAPPING POINT)
5 LAVATORY DETAILS
P-01
4 POTABLE WATER PIPE DETAILS
SCALE: NTS
P-01 SCALE: NTS

3 WATER METER CONNECTION DETAILS P-01 SCALE: NTS


P-01 SCALE: NTS

PRC No. - Date Registered: -


PROJECT TITLE: PROJECT OWNER: REVISIONS: SET NO. SHEET NO.

-
P-01 9
PTR No. - Date Issued: -

ELECTRICAL ENGINEER -
Place: TIN: - - 9
LOCATION: - LOCATION: - SCALE: VARIES

You might also like