LEGENDS: GENERAL SPECS. FOR PLUMBING WORKS APPROPRIATE USE OF 45 DEGREES WYE AND 81 BEND.

THE SAME
1. ALL PLUMBING WORKS HEREIN INCLUDED SHALL BE INSTALLED SHALL BE DONE FOR VERTICAL SOIL STACKS TEES AND CROSSES
LAV - LAVATORY ACCORDING TO THE PROVISIONS OF THE NATIONAL PLUMBING MAY BE USE ONLY VENT PIPES.
CODE AND THE RULES AND REGULATIONS OF THE CITY OF DAVAO, 10. UNLESS OTHERWISE SPECIFIED. PIPES SIZES OF FLOOR DRAINS
F.D - FLOOR DRAIN DAVAO DEL SUR. SHALL BE THE SAME AS THE CONNECTING PIPES.
2. WORKS SHALL BE EXECUTEDIN CLOSE COORDINATION WITH ALL 11. ALL GATE VALVES SHALL BE BRONZE AND RATED AT 862 KPA
C.O - CLEAN OUT
THE TRADES NOTIFY IMMEDIATELY ANY DISCREPANCY WITH OTHER (125PSI) CRANE OR APPROVED EQUAL.
CB - CATCH BASIN TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT AND 12. WATER LINE SHALL HAVE INDIVIDUAL GATE VALVE PER TOILET AND
WC - WATER CLOSET ENGINEER. THE CONTRACTOR SHALL VERIFIED ALL EXISTING WHEREVER NECESSARY FOR MAINTENANCE PURPOSES
UTILITIES AT THE EXISTING SITE AND COORDINATE THE WORKS 13. ALL PIPES PASSING THROUGH THE SEISMIC GRAPH SHALL BE
DS - DOWN SPOUT
WITH THE SEWER LINE EFFLUENT OR DISPOSAL POINT AND WATER PROVIDED WITH FLEXIBLE CONNECTORS. SIZE SHALL BE THE SAME
GV- GATE VALVE LINE SERVICE CONNECTING POINT. AS CONNECTING PIPE.
CV- CHECK VALVE 3. THE TOTAL SCOPE OF WORK SHALL INCLUDE ALL WORKS AS 14. CLEANOUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS:
F- FAUCET DESCRIBE IN THE PLANS AND LISTED IN THE PLUMBING WORKS AS A. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING 22 .5
SHO. - SHOWER A PART OF THE CONTRACT DOCUMENTS. PROPOSED SANITARY DEGREES.
UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND B. EVERY FIFTY OR FIFTEEN METERS OF CONTINUOUS HORIZONTAL
VTR - VENT THRU ROOF INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURE. RUN OF PIPE
DS - DOWNSPOUT 4. ALL SANITARY DRAINAGE LINES SHALL MAINTAIN A MINIMUM SLOPE C. AT THE END OF HORIZONTAL LINES
SANITARY LINE OF 2% UNLESS OTHERWISE NOTED. (SECTION 302) 15. PROHIBITED FITTINGS; NO DOUBLE HUBS OR DOUBLE TEE WYE
WATERLINE 5. ALL STORM DRAINAGE LINES SHALL SHALL MAINTAIN A MINIMUM BRANCH SHALL BE USE ON HORIZONTAL SOIL OR WASTE LINE.
SLOPE OF 1% UNLESS OTHERWISE NOTED.(SECTION 302) 16. ALL GATE VALVES/CLEANOUTS ON SHAFTS AND WHEREVER THEY
6. ALL WATER LINES SHALL BE HYDROSTATYCALLY TESTED AT 1034 ARE
KPA
7. THE NEW WATER DISTRIBUTION PIPING SYSTEM SHALL BE
THOROUGHLY FLUSH AND DISINFECTED WITH CHLORINE AND AT 50
PPM CONCENTRATION.
8. UNLESS OTHERWISE INDICATED, ALL FIXTURES OR TRAP MUST BE
PROVIDED WITH INDIVIDUAL VENTS. THERE SHALL BE REQUIRED
VENTILATION AND LIGHTING SYSTEM FOR TOILETS AND
BATHROOMS AND ALL WET AREAS.
9. ALL 90 CHANGES IN DIRECTION SHALL BE MADE BY THE

PROJECT ENGINEER TITLE SHEET CONTENT: SHEET NO.

PROPOSED TWO-STOREY

P
PLUMBING NOTES & STANDARDS INCLUDING
VINCE PAOLO LOUILL DAGALA RESIDENTIAL BUILDING SPECIFICATIONS, LEGENDS, & SYMBOL
P
LOCATION OWNER:
JOBELLE VIOS
FARLAND SUBDIVISION, DAVAO CITY DONA D. CARMEN
1