PRICE COST (P) I. CONCRETE A. CEMENT 183 bag 255 46665 B. SAND 13.54 cu.m 2800 37912 C. GRAVEL 8 cu.m 3900 31200 II. MASONRY A. 15X20X40 CHB 1792 pcs 12 21504 III. REINFORCING BARS A. 6M-12MM REBAR 246 pcs 193 47478 B. 6M-10MM REBAR 31 pcs 135 4185 C. TIE WIRE 7 kg 75 525 IV. ROOFING A. GA #24 G.I. ROOFING 52 pcs 285 14820 B. PRE-FABRICATED GA #24 G.I GUTTER 7 pcs 450 3150 C. PRE-FABRICATED GA #24 G.I FLUSHING 4 pcs 235 940 D. GA #24 G.I. PLAIN SHEET FOR RIDGE ROLL 4 pcs 235 940 209319