Equipment: 1-QQQ-03-00-B.01-TM-TRAM-TRAM-0003
Service Provider: 1068304
Service Provider Anish
Name:
Description
Cooling pump 3: Insufficient flow
COMPLETION INFORMATION
Equipment ID __________ (If Applicable)
Repair Feedback (Materials Required etc.)
Cooling pump 3 is located in boggie B axel 4 because of boggie rotation. We drained the coolant from the system
and found the filter,coolant tank, and coolant dirty and full of particles. We cleaned the coolant tank, changed the
filter, and cleaned all the hoses with compressed air. After that, we changed the coolant that had been filtered
and made sure the problem did not arise again.
Name Start (Date and Time) Finish (Date and Time) Hours Straight Hours Over Time
ANISH PS 14:00 - 13-11-2023 15:30 13-11-2023 01:30:00;00 00:00
Rahul VM 14:00 - 13-11-2023 15:30 13-11-2023 01:30:00;00 00:00