You are on page 1of 58

HCMC UNIVERSITY OF TECHNOLOGY AND EDUCATION

FACULTY OF ELECTRICAL AND ELECTRONIC ENGINEERING

Hệ thống sản xuất tích hợp (FMS and CIM)

Lecturer: Dr. Trần Mạnh Sơn


Department of Automatic Control
Email: sontm@hcmute.edu.vn
0919 197 139

FMCI431746 1
Rules in Class

➢ Attend at least 80% of class hours


➢ Complete all home-works, assignments (If any), and Mid-term

FMCI431746 2
Assessment

➢ Assignment (50%)
✓ Mid-term 1, Mid-term 2
➢ Final Exam (50%)
✓ Writen exam

FMCI431746 3
Textbook and References

[1] Hệ thống sản xuất tích hợp, Đặng Thiện Ngôn, Lê Chí Cương
[2] Automation Production System, and Computer Integrated Manufacturing, Mikell

P. Groover, 2015
➢ Software:
✓ Factory IO
✓ SolidWorks

FMCI431746 4
Content of this course

➢ Chapter 1: Introduction
➢ Chapter 2: Life Cycle of Product
➢ Chapter 3: Overview of Manufacturing
➢ Chapter 4: Elements of CIM
➢ Chapter 5: Automatic Identification and Data Capture
➢ Chapter 6: Quality Control Systems
➢ Chapter 7: Just-in-Time Manufacturing, Lean Manufacturing

FMCI431746 5
Overview of Manufacturing

Chapter 3: Overview of Manufacturing

FMCI431746 6
Content of Chapter 3

➢ 3.1 Concepts
➢ 3.2 Product/production relationships
➢ 3.3 Manufacturing performance

FMCI431746 7
Concepts

FMCI431746 8
Concepts

Manufacturing: the application of physical and/or chemical processes to alter the


geometry, properties, and/or appearance of a given starting material to make parts or
products

Technological process Economic process

FMCI431746 9
Concepts

✓ Manufacturing Industries: enterprises and organizations that produce, supply goods,


and service

Manufacturing Industries
Primary Industries: Cultivate/exploit
natural resources (Agriculture, Mining)

Secondary Industries: Produce


products
Tertiary industries : Services (Bank,
Education, Entertainment..)

FMCI431746 10
Concepts

FMCI431746 11
Concepts

✓ Continuous production: the output of the product is uninterrupted

Process Industry Discrete Manufacturing Industry

✓ Batch production: when the materials are processed in finite amounts or quantities

Process Industry Discrete Manufacturing Industry


FMCI431746 12
Concepts

FMCI431746 13
Concepts

➢ Manufacturing Operations: convert raw materials into finished products

Manufacturing
Operations

processing operation Assembly operation

Uses energy to alter a


work part’s shape, Two or more separate
physical properties, or parts are joined to form
appearance to add a new entity
value to the material

FMCI431746 14
Product/production relationships

➢ Production quantity: refers to the number of units of a given part or product produced
annually by the plant
➢ Product variety: refers to the different product designs or types that are produced in a
plant

FMCI431746 15
Product/production relationships

➢ Layout in manufactory:
❖Product product
remains in a single
location during its
entire fabrication.
❖Products include
ships, aircraft, railway
locomotives, and
heavy machinery.

Fixed position layout

FMCI431746 16
Product/production relationships

➢ Layout in manufactory:
❖Equipment is arranged
according to function or type
❖Ex. The lathes are in one
department, the milling
machines are in another
department
❖Material handling is required
to move parts between
departments
Process layout ❖Inventory tends to be high

FMCI431746 17
Product/production relationships

➢ Layout in manufactory:
❖Groups of similar parts or
products can be made on the
same equipment without
significant lost time for
changeovers

Cellular layout
➢ Workstations are arranged into
one long line/ into a series of
connected line segments.
➢ Assembly line: cars and
household appliances, main
boards.
Product layout
FMCI431746 18
Product/production relationships

➢ Quantity-based manufacturing classification:


✓ Low Production (Job Shop): Low quantity range of 1–100 units/ year
• Specialized and customized products
• Products are typically complex, such as experimental aircraft and special
machinery

✓ Medium Production: medium quantity range (100–10,000 units annually). Batch

production
✓ High Production: high quantity range (10,000 to millions of units per year) (Mass
Production)

FMCI431746 19
Product/production relationships

FMCI431746 20
Manufacturing Performance

➢ Cycle time analysis: The cycle time Tc is the time that one work unit1 spends being
processed or assembled

Tc = cycle time, min/pc


To = time of the actual processing or assembly operation min/pc
Th = handling time, min/pc
Tt = average tool handling time, min/pc (tool handling time consists of time spent changing
tools when they wear out, time changing from one tool to the next

FMCI431746 21
Manufacturing Performance

➢ Production rate: expressed as an hourly rate, that is, work units completed per hour

Operation Cycle time


Production rate
Type of Production
• Job shop production
• Batch Production
• Mass Production

FMCI431746 22
Manufacturing Performance

✓ Job Shop Production: Quantities less than 100 pcs. If Q=1 (quantity)

Tp = average production time, min/pc


Tsu = setup time to prepare the machine to produce the part, min/pc
Tc = cycle time
 Production Rate:

 Rp = hourly production rate, pc/hr

FMCI431746 23
Manufacturing Performance

✓ Batch Production: (Sequential batch processing, Simultaneous Batch)

Sequential Batch Simultaneous Batch


Batch processing time(Tb- Batch processing time(Tb-
min/batch) min/batch)

Tsu = setup time; Q = batch Tsu = setup time; Tc = cycle time per
quantity, pc/batch; Tc = cycle time work unit, min/cycle.
per work unit, min/cycle.

FMCI431746 24
Manufacturing Performance

 Average production time per work unit Tp

 Production Rate:

FMCI431746 25
Manufacturing Performance

✓ Mass production: quantity mass production & flow-line mass production

Quantity Mass Production Flow-line Mass Production


Production rate(Rp) = cycle Production rate(Rp) =cycle rate of the
rate of the machine (Rc). machine (Rc).
Q is very large,

S
S Tc: cycle time of production line. Max To:
maximum of the operation times for all
stations on the line. Tr: time to transfer
work units between stations each cycle.

FMCI431746 26
Manufacturing Performance

A batch of parts is produced on a semi-automated production machine. Batch size


is 200 units. Setup requires 55 min. A worker loads and unloads the machine each cycle,
which takes 0.44 min. Machine processing time is 2.86 min/cycle, and tool handling time
is negligible. One part is produced each cycle.
Determine:
(a) Average cycle time,
(b) Time to complete the batch, and
(c) Average production rate
 Solution:
a) 𝑇𝑐 = 𝑇0 + 𝑇ℎ = 0.44 + 2.86 = 3.3𝑚𝑖 𝑛Τ𝑝 𝑐

b) 𝑇b = 𝑇su + Q𝑇c = 55 + 200x3.3 = 11.92hr

c) Rp=16.78pc/hr

FMCI431746 27
Manufacturing Performance

✓ Production capacity:
Maximum rate of output that a production facility (or production line, or group of
machines) is able to produce under a given set of assumed operating conditions
Determine Production Capacity

PC = Production capacity, pc/period; n = number of machines; and Hpc = the number


of hours

FMCI431746 28
Manufacturing Performance

Example: Production Capacity


The automatic lathe department has five machines, all devoted to the production of the same
product. The machines operate two 8-hr shifts, 5 days/week, 50 weeks/year. Production rate
of each machine is 15 unit/hr. Determine the weekly production capacity of the automatic
lathe department.
FMCI431746 29
Manufacturing Performance

FMCI431746 30
Manufacturing Performance

FMCI431746 31
Manufacturing Performance

FMCI431746 32
Manufacturing Performance

FMCI431746 33
Manufacturing Performance

FMCI431746 34
Manufacturing Performance

FMCI431746 35
Manufacturing Performance

FMCI431746 36
Manufacturing Performance

✓ Utilization: the proportion of time that a productive resource (e.g., a production


machine) is used relative to the time available under the definition of plant capacity

Ui = utilization of machine i
fij = the fraction of time during the available hours that machine i is processing part style j
Overall utilization for the plant:
n n
 f
i =1
ij U i
U= j
= i =1

n n

FMCI431746 37
Manufacturing Performance

FMCI431746 38
Manufacturing Performance

Workload: 72 hr
For plant capacity: maximum
number of hours (80 hr)

FMCI431746 39
Manufacturing Performance

➢ Adjusting plant Capacity:


✓ Increase or decrease the number of machines n in the plant
✓ Increase or decrease the number of shifts per week
✓ Increase or decrease the number of hours worked per shift
✓ Increase the production rate Rp by making improvements in methods and/or
processing technology

FMCI431746 40
Manufacturing Performance

✓ Manufacturing-Lead time:

FMCI431746 41
Manufacturing Performance

FMCI431746 42
Manufacturing Performance

FMCI431746 43
Manufacturing Performance

✓ Work-in-process: the quantity of parts or products currently located in the factory that
either are being processed or are between processing operations

FMCI431746 44
Manufacturing Performance

FMCI431746 45
Manufacturing Cost

FMCI431746 46
Manufacturing Cost

FMCI431746 47
Manufacturing Cost

FMCI431746 48
Manufacturing Cost

FMCI431746 49
Manufacturing Cost

FMCI431746 50
Manufacturing Cost

FMCI431746 51
Manufacturing Cost

FMCI431746 52
Manufacturing Cost

FMCI431746 53
Manufacturing Cost

FMCI431746 54
Manufacturing Cost

FMCI431746 55
Manufacturing Cost

FMCI431746 56
Manufacturing Cost

FMCI431746 57
Several Examples

Thank You For Your Listening