Document No: AR2-DOC-

Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00


Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

ARAYAT-MEXICO PHASE 2
SOLAR FARM PROJECT
PHILIPPINES

EARTHING DESIGN
CALCULATION (SUBSTATION)

Approved By:
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

GROUNDING SYSTEM CALCULATION


1. Purpose

Establish, as a basis for design, the safe limits of potential differences that can exist
in the Substation under fault conditions between points that can be contacted by the
human body.

Review grounding practices with special reference to safety, and develop criteria for
a safe design.

Provide a procedure for the design of practical grounding systems, based on these
criteria.

2. List of References

IEEE Std 80-2000


IEEE Guide for Safety in AC Substation Grounding

(IIEE) Institute of Integrated Electrical Engineers of the Philippines


Philippine Electrical Code (PEC)

National Fire Protection Association (NFPA)


NFPA 70 National Electrical Code (NEC)
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

3. Design Procedure Block Diagram

Fig. 33 IEEE Std. 80 - 2000


Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

4. List of Tables
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

5. Grounding System Design Calculation

Step 1: Field Data (Refer to Annex A for area assumptions)

L = 48.13 m
W= 31.44 m
A = 1,513.21 m2
ρ = 10 Ωm, 1m depth, wet organic soil (Table 8, IEEE Std.80-2000 and
Soil Data used from AR-DOC-006-004-00 EARTHING DESIGN
CALCULATION (SUBSTATION)

Step 2-A: Conductor Size (Substation)

Amm2 = If 1

TCAP•10-4 ln K0 + Tm
tc αr ρr K0 + Ta

Equation 40, IEEE Std. 80-2000

Where:
Amm2 = conductor cross section, mm2
If = rms fault current = 20.053 kA from AR-DOC-002-0009-00 & AR-
DOC-002-0010-00 Load Flow & Short Circuit Study
Tm = maximum allowable temperature = 1083° C
Ta = ambient temperature = 40°C
Tr = reference temperature for material constants, °C
αr = thermal coefficient of resistivity at reference temperature T r
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

= 0.00393 1/ °C
ρr = resistivity of ground conductor at reference temperature Tr
= 1.72 µΩcm
K0 = 1/α0 or (1/αr ) – Tr = 234°C
tc = duration of fault current = 0.5 sec
TCAP = thermal capacity per unit volume = 3.72 J/cm2 °C

For Material Constants, refer to Table 1, IEEE Std. 80-2000.


Use copper, annealed soft-drawn for grounding conductor.

Amm2 = 20.053 1

3.72 x 10-4 In 234 + 1083


(0.5)(0.00393)(1.72) 234 + 40

= 20.053 1

0.1101 x 1.5699

= 20.053
0.41569

Amm2 = 48.24 mm2

Use: 125mm2 BCW Grounding Conductor based on NGCP Requirements

Step 3: Touch and Step Criteria

Etouch70 = (1000 + 1.5 Cs ρs) (0.157 /√ ts )


Equation 33, IEEE Std. 80-2000

Estep70 = (1000 + 6 Cs ρs) (0.157 /√ ts )


Equation 30, IEEE Std. 80-2000

Where:
Etouch70 = tolerable touch voltage for human with 70kg body weight, V
Estep70 = tolerable step voltage for human with 70kg body weight, V
Cs = surface layer resistivity derating factor
Cs =1 – 0.09 (1 – ρ )
ρs
2hs + 0.09
Equation 27, IEEE Std. 80-2000
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

hs = surface layer thickness (gravel) = 0.15m


ρs = surface layer resistivity (gravel)
= 8,534.4 Ωm (Soil Data used from AR-DOC-006-004-00 EARTHING
DESIGN CALCULATION (SUBSTATION)
ts = duration of shock current = 0.5sec
ρ = resistivity of soil (wet organic soil)
= 10 Ωm, 1m depth, (Table 8, IEEE Std.80-2000 and Soil Data used
from AR-DOC-006-004-00 EARTHING DESIGN CALCULATION
(SUBSTATION)

Cs =1 – 0.09 (1 – 10 )
8534.4
2(0.15) + 0.09

= 1 – 0.09
0.39
Cs = 0.77

Etouch70 = [1000 + (1.5) (0.77) (8534.4)] ( 0.157 /√0.5 )

= 2,410.65V

Estep70 = [1000 + (6) (0.77) (8534.4)] ( 0.157 / √0.5 )

= 8,976.50V

Step 4: Initial Design

L = length of solar field = 48.13m


W = width of solar field = 31.44m
A = 1,513.21 m2 (Refer to Annex A for area assumptions)
D = maximum spacing between parallel conductors = 6m
Nr = total number of ground rods = 56 pcs
Lc = total length of ground conductor = 715m
Lt = total length of ground conductor and ground rods
= 715 + (56)(3) = 883m

Step 5: Determination of Grid Resistance

Rg = ρ 1 + 1 1 + 1

LT √ 20A 1 + h √20/A
Equation 52, IEEE Std. 80-2000
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

Where:
Rg = Resistance of grounding system, Ω
Lt = Total effective length of grounding system conductor including grid &
grounds rods, m
A = total area enclosed by the ground grid, m2
h = depth of ground grid conductors, 0.5m
ρ = resistivity of soil (wet organic soil)
= 10Ωm

Rg = 10 1 + 1 1 + 1

883 √20(1513.21) 1 + 0.5√20 / 1513.21

= 10 [ 1.13x10-3 + 5.75x10-3 (1 + 0.95) ]

Rg = 0.123Ω

Step 6: Maximum Grid Current

Sf = Ig
3Io
Equation 63, IEEE Std. 80-2000
If ≈ 3Io

Sf = Ig then Ig = Sf • If
If
and
IG = Df • Ig
Equation 64, IEEE Std. 80-2000
IG = Df • Sf • If

Where:
IG = maximum grid current, A
Ig = rms symmetrical grid current, kA
Sf = fault current division factor between grounding grid & surrounding
earth = 0.5
If = rms fault current, 20.053 kA
Df = decrement factor for the entire duration of fault
for tf = 1 sec or more, Df = 1.0
IG = (1.0) (0.5) (20.053 kA)
= 10.03kA
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

Step 7: Determination of Grid Potential Rise

GPR = IG • Rg
Equation B.12, IEEE Std. 80-2000
= (10.03 kA) (0.123 Ω)
= 1,233.69 V

Etouch70 = 2,410.65V

Result:
GPR < Etouch70 Proceed to Step 12 Detailed Design
(Steps 8 to 10 are provided to show Mesh and Step Voltage Values)

Step 8:

a) Calculation of Mesh Voltage

Em = ρ • Km • Ki • IG
Lm
Equation 80, IEEE Std. 80-2000

Where:
Em = mesh voltage at the center of the corner mesh, V
ρ = soil resistivity = 10 Ωm
IG = maximum grid current = 10.03 kA
Lm = effective length of Lc + Lr for mesh voltage, m
Km = spacing factor for mesh voltage

Km = 1 In D2 + (D+2+h)2 - h + Kii • In 8
2π 16hd 8Dh 4d Kh π(2n –1)

Equation 81, IEEE Std. 80-2000

D = maximum spacing between parallel conductors = 6m


d = diameter of grid conductor (125mm2 BCW), A = π d2 /4
125mm2 = 3.14 x (d2 /4)
d = 12.62mm = 0.01262m
Kh = corrective weighting factor that emphasizes the effects of grid depth

Kh = √ 1 + (h/ ho) , ho = 1m (grid reference depth)


Equation 83, IEEE Std. 80-2000
h = depth of ground grid conductor = 0.5m
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

Kh = √ 1 + (0.5/1) = 1.225m

Kii = corrective weighting factor that adjusts for the effects of inner
conductors on the corner mesh. For grids with ground rods along the
perimeter or with ground rods in the grid corners, Kii = 1
n = geometric factor composed of factors na, nb, nc & nd
n = na • nb • nc • nd
Equation 84 IEEE Std. 80-2000

na = 2 (Lc / Lp)
Equation 85 IEEE Std. 80-2000
nb = 1 for square grids
nc = 1 for square & rectangular grids
nd = 1 for square, rectangular & L-shaped grids
Lc = total length of the conductor in the horizontal grid = 715m
Lp = peripheral length of the grid = 159.14m

na = 2 (715) = 8.99
159.14
n = 8.99(1) (1) (1) = 8.99

Km = 1 In 62 + (6 + 2 + 0.5)2 - 0.5
2π (16) (0.5) (0.01262) 8 (6) (0.5) 4 (0.01262)

+ 1 • In 8
1.225 π (2x8.99 - 1)

= 1 In 356.58 + 3.01 – 9.90 + 1 In 8


2π 1 .225 53.34

= 1 (5.86 - 1.55)

Km = 0.69

Ki = Correction factor for grid geometry


Ki = 0.644 + 0.148n
Equation 89 IEEE Std. 80-2000
= 0.644 + (0.148) (8.99)
= 1.97
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

Lm = Lc + 1.55 + 1.22 Lr LR

√ Lx2 + Ly2
Equation 91 IEEE Std. 80-2000

For grids with ground rods in the corners, as well as along the perimeter &
throughout the grid:
Lr = length of ground rod at each location = 3m
LR = total length of ground rods, = 56x3 = 168m

Lm = 715 + 1.55 + 1.22 3 168

√48.132 + 31.442

= 986.10m

Em = 10 (0.69) (1.97) (10.03x103)


986.10
Em = 138.26V

b) Calculation of Step Voltage

Es = ρ • Ks • Ki • IG
Ls
Equation 92 IEEE Std. 80-2000

Where:
Es = Step voltage between a point above the outer corner of the grid and
a point 1 m diagonally outside the grid
Ks = spacing factor for step voltage
Ls = effective length of LC & LR for step voltage

Ks = 1 1 + 1 + 1 (1 – 0.5n-2)
π 2h D+h D
Equation 94 IEEE Std. 80-2000

= 1 1 + 1 + 1 (1 – 0.58.99-2)
π 2 (0.5) 6+0.5 6
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

= 1 1 + (0.154) + (0.165)
π

Ks = 0.42

Ls = 0.75Lc + 0.85LR
Equation 93 IEEE Std. 80-2000
= 0.75 (715) + 0.85 (168)

= 679.05 m

Es = 10 (0.42) (1.97) (10.03x103)


679.05
= 122.21V

Step 9: Em Vs Etouch70

Em = 138.26 V

Etouch70 = 2,410.65V

Em < Etouch70 ok

Step 10: Es Vs Estep70

Es = 122.21V

Estep70 = 8,976.50V

Es < Estep70 ok

The conditions for Mesh & Step Voltage requirement have been satisfied.
A safe design has been obtained & final details can now be added to the design.

SUMMARY OF DESIGN PARAMETER

AC = ground conductor cross section (Substation) = 125 mm2


If = rms fault current at Substation = 20.053 kA
IG = maximum grid current = 10.03 kA
ρ = soil resistivity (wet organic soil), 1m depth = 10 Ωm
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

Rg = resistance of grounding system = 0.123 Ω


hs = surface layer thickness (dry soil) = 0.15 m
ρs = surface layer resistivity (gravel) = 8,534.4 Ωm
tc = duration of fault current = 0.5 sec
D = spacing between parallel conductors = 6m
2
d = diameter of grid conductor (38mm ) = 0.01262 m
h = depth of ground grid conductor = 0.5 m
A = total area enclosed by the ground grid = 1,513.21 m2
Etouch70 = tolerable touch voltage for human with = 2,410.65 V
70kg. body weight
Estep70 = tolerable step voltage for human with = 8,976.50 V
70kg. body weight
Em = mesh voltage at the center of the corner mesh = 138.26 V
Es = Step voltage between a point above the outer = 122.21 V
corner of the grid and a point 1 m diagonally
outside the grid
Lc = total length of the conductor in the horizontal grid = 715 m
Nr = number of ground rod (20mmdia x 3m long) = 56 pcs
LR = total length of ground rod = 168 m

.
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

ANNEX A

1. FIELD DATA USED FOR CALCULATION

Note:
Area considered for the calculation includes Phase-1 Substation area since
the grounding conductors for Phase-1 and Phase-2 Substations are
connected.
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

2. Soil Data

Reference Document:
AR-DOC-006-004-00 EARTHING DESIGN CALCULATION (SUBSTATION)

3. Fault Current

Reference Document:
AR-DOC-002-0009-00 & AR-DOC-002-0010-00 Load Flow & Short Circuit
Study
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

4. CALCULATION OF BURIED GROUND CONDUCTORS

Peripheral
Length of buried Area enclosed by
Item Length of
Location ground the grounding
No. ground
conductors, m grid, m2
conductors, m
Substation Area (48.13m x 16.94m)
1 369 82.01
(Phase-2) 815.32

Substation Area (48.13m x 14.5m)


2 346 77.13
(Phase-1) 697.89

Total 715 1,513.21 159.14

a. Estimated quantity of buried ground conductors (125mm2): 715 m


Estimated peripheral length of ground conductors: 159.14m
b. Estimated area enclosed by grounding grid:
Field Data used: L= 48.13 m
W= 31.44 m
A= 1,513.21 m2
Document No: AR2-DOC-
Arayat-Mexico Phase 2 Solar Farm Project, Philippines 006-0004-00
Revision: C

DETAILED ENGINEERING DESIGN


June 28, 2022

ANNEX B

1. BILL OF MATERIALS

Ground 125mm2
Item Ground Well
Location Rod Ground
No. Qty
Qty Conductor

Substation Area (Phase-2),


1 Existing materials from 10 1 132
Phase-1

Substation Area (Phase-2), 237


2 18 2
New materials

Substation Area (Phase-1),


Existing materials from 346
3 28 1
Phase-1

TOTAL 56 4 715

1.1 Ground Rod Copper-Clad Steel, 20mm DIA. X 3m Long: 56 pcs.


1.2 Ground well: 4 pcs.
1.3 Estimated length of Ground conductor (125mm2): 715m