To,
All consultants engaged for Bharatmala Pariyojana
Subject: Policy for Design of full access control Economic Corridor under Bharatmala
Pariyojana
Please find enclosed herewith policy for Design of Economic Corridor under
Bharatmala Pariyojana. It is requested to adopt the enclosed policy while designing the
Project Highway.
Yours faithfully,
~l-
(Ravinder)
General Manager (Tech)
Bharatmala Division, NHAI
Encl: As above.
Copy to:
movement in the
to minimum 4-lane standards especially
corridors needs to be developed it was
and set standards.
2. present planning of the multilane highways provide infrastructure
on high\\'ays, for segregation and circulation of slow moving and local
controlled access to the highway through Service Roads. and for mitigating the severance of
communities through liberal provision of underpasses/ manner
which these infrastructure are being operated is hardly conducive to operational
and the highway system (comprising main the ramps
Road and the NH, and the Service Roads) as a whole. The user
travellers is seriously impacted because every nmv and then in course of their travel they are
faced queues, turbulence, breakdown flow, delays and unsafe manoeuvres
smooth tlow. The operational problems manifest themselves at the
to be substantially improved to
eliminating altogether any
that the drivers make only sate manoeuvres (merge, and weave).
3. The important lesson learnt is operational is
for achieving that the main high\vay because most the problems originate on
Service Roads (capacity constraint, congestion and conflict) and impact the line
The capacity of the two-lane Service Road, therefore. has to be maximised (e.g. by promoting
unidirectional instead of bidirectional flow, reducing the number of access points,
movements). Secondly, the facilities for the three crucial manoeuvres
diverge and weave) on the main line have to be adequately provided in
length, weaving length and sound
traffic engineering 'gap acceptance·.
and for the respective demand volume (e.g. merging,
Incidentally, the distance between an Entry ramp and the f()llowing
less than the sum of the three lengths stated above because
required to be accomplished two ramps.
the highway system (main line, Service Roads, Ramps) and all merge, weave,
diverge), traffic operation should be targeted for more or less the same acceptable
that the demand generated at any point due to
the capacity at other point and force the latter to operate on a lower
planning and design of service roads in urban stretch is
road is severely hindered due to cross traffic, right turn
frequent accesses rendering chaotic and unsafe
m hour traflic.
4. scenario the road-side
business establishments abut
control along entire corridor:
made
capacity beyond 6 lane, alternative alignment is to be developed. Economic
are to be developed fully access controlled. Other roads such as Inter-corridor, -r-=.~rifW
routes, international connectivity, border roads etc. are to be proposed
access control/ no access controlled;
Conflict free movement in the entire corridor and in service roads in Urban
In urban stretches, the Corridor is proposed on till start
viaduct of 6 lane configuration is to be proposed on single pier to minimise
acquisition. Further, Entry and Exit from Main corridor to service road and
is proposed at start and end of built-up area of municipal city limit However, in
case area is more than 5 long, may be as
traffic need.
uninterrupted movement on cross on
is proposed:
a) The cross roads category NH/SH/MDR/4 lane road is proposed at one
The service road is at ground level;
For litating cross movement lower
introduce concept near the cross road.
to be met within 600m length for b,)th sides of U-turn.
may adopted around every 3 so as to minimise the detour length.
U-turn to
from 45m to 70m may be proposed keeping in
faci and entry and and vice versa:
Typical layouts and cross sections as elaborated under para 6 as
Appendix to this policy.
7.
a
, the appropriate traffic management measures to be adopted
movement and circulation, vehicular entry/exit, n"''"'"'''Trl
areas access and circulation, etc.) and
8. Implementation
these
using the state-of the-art methods
and design, construction specifications
materials, technology and management capable of
environmental safeguards, anJ operation and
traffic management and information
areas
an
refined/updated every years based on research, may be adopted.
users,
disrupting
water body contamination, degradation)
specifications besides the institutional arrangements to be put in place
Concessionaire to ensure the carrying out of various activities and compliance
personnel, resource
deployment, fund flow, progress monitoring, intervention by the management).
I 0. Operational Aspects: The operation of the Projects should be exactly in the way
are planned (unidirectional movements, no right turns on service roads in urban area,
regulated merge. weave and diverge, entry/exits through ramps in one direction only). This
may not happen. basically for three reasons. to the
new system of movement (b) innocent mistakes caused of habit (e.g. taking a
right turn on a junction because turning right has been a normal driving habit), and (c) wilful
violations (e.g .• taking a short cut to avoid longer detours). A tvvo-pronged strategy
be followed for fulfilling the operational objectives, as outlined below:
70.00M
TRANSITION LENGTH 75M MINIMUM TRANSITION LENGTH 75M (MINIMUM TAPERING 1 in 15) ACCELARATION LENGTH 95M (MINIMUM TAPERING 1 in 15)
(MINIMUM TAPERING 1 in 15) DECELARATION LENGTH 80M (MINIMUM TAPERING 1 in 15)
50.00M
41.00M
60.00M
TAPERED LENGTH OF
SERVICE ROAD TAPERED LENGTH OF SERVICE ROAD
(MINIMUM TAPERING 1 in 15) STRAIGHT LENGTH (MINIMUM TAPERING 1 in 15) MINIMUM MINIMUM
TRANSITION LENGTH 100M MINIMUM TRANSITION LENGTH 100M
MINIMUM MINIMUM (MINIMUM TAPERING 1 in 15) DECELARATION LENGTH 80M (MINIMUM TAPERING 1 in 15)
TRANSITION LENGTH 75M MINIMUM TRANSITION LENGTH 75M
LEGEND:- (MINIMUM TAPERING 1 in 15) ACCELARATION LENGTH 95M (MINIMUM TAPERING 1 in 15) ZONE OF DECELERATION
MEDIAN/SEPARATOR
ZONE OF ACCCELERATION
CYCLE TRACK / UTILITY CORRIDOR IN URBAN AREA
EARTHEN SHOULDER
EARTHEN DRAIN
EMBANKMENT SLOPE
4 LANE EC
LANE MARKING
PLANTATION
4 LANE
ROW
70.00M
1.50M 7.50M 1.50M 7.50M 1.50M 4.50M 1.50M 7.00M 5.00M 7.00M 1.50M 4.50M 1.50M 7.50M 1.50M 7.50M 1.50M
SEPARATOR
SEPARATOR
SEPARATOR
SEPARATOR
MEDIAN
DRAIN CUM
DRAIN CUM
EARTHEN SHOULDER EARTHEN SHOULDER
SHOULDER
SHOULDER
LHS SERVICE ROAD LHS CARRIAGEWAY TO LHS CARRIAGEWAY RHS CARRIAGEWAY RHS CARRIAGEWAY TO RHS SERVICE ROAD
COVERED FACILITATE ENTRY TO / EXIT / RESERVE AREA 4.00M / RESERVE AREA FACILITATE ENTRY TO / EXIT
PAVED
PAVED
CONCRETE FROM ECONOMIC CORRIDOR FOR FUTURE FOR FUTURE FROM ECONOMIC CORRIDOR COVERED
CORRIDOR WIDENING TO 6 LANE WIDENING TO 6 LANE CONCRETE
FOR UTILITY WITH PROVISION TO WITH PROVISION TO CORRIDOR
SERVICES DRAIN PAVEMENT DRAIN PAVEMENT FOR UTILITY
0.50M
0.50M
RUNOFF RUNOFF SERVICES
2.5% 2.5% 2.5% 2.5% 2.5% 2.5%
.
CARRIAGEWAY TO SERVICE ROAD AT THE START/END
OF URBAN AREA ( SECTION A-A )
ROW
70.00M
1.50M 11.00M 7.00M 4.50M 1.50M 7.00M 5.00M 7.00M 1.50M 4.50M 7.00M 11.00M 1.50M
SEPARATOR
SEPARATOR
DRAIN CUM
DRAIN CUM
EARTHEN SHOULDER EARTHEN SHOULDER
SHOULDER
SHOULDER
LHS SERVICE ROAD LHS CARRIAGEWAY MEDIAN RHS CARRIAGEWAY RHS SERVICE ROAD
COVERED / RESERVE AREA 4.00M / RESERVE AREA COVERED
PAVED
PAVED
CONCRETE FOR FUTURE FOR FUTURE CONCRETE
CORRIDOR WIDENING TO 6 LANE WIDENING TO 6 LANE CORRIDOR
FOR UTILITY WITH PROVISION TO WITH PROVISION TO FOR UTILITY
SERVICES DRAIN PAVEMENT DRAIN PAVEMENT SERVICES
0.50M
RUNOFF RUNOFF
0.50M
2.5% 2.5% 2.5% 2.5%
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS
TCS FOR ENTRY/EXIT FACILITY FROM MAIN REQUIREMENTS
.
.
CARRIAGEWAY TO SERVICE ROAD AT THE START/END
OF URBAN AREA ( SECTION B-B )
ROW
60.00M
1.50M 7.50M 1.50M 1.50M 2.00M 1.50M 7.00M 5.00M 7.00M 1.50M 2.00M 1.50M 1.50M 7.50M 1.50M
SHOULDER
SHOULDER
SHOULDER
SHOULDER
APPROX. 5M LHS CARRIAGEWAY MEDIAN RHS CARRIAGEWAY APPROX. 5M
EARTHEN
EARTHEN
KEEPING IN 4.00M KEEPING IN
PAVED
PAVED
LHS SERVICE ROAD RESERVE RESERVE RHS SERVICE ROAD
SHOULDER
SHOULDER
FOR FOR
EARTHEN
EARTHEN
FUTURE 6 FUTURE 6
DRAIN
DRAIN
LANING LANING
COVERED COVERED
2.5% 2.5%
CONCRETE CONCRETE
CORRIDOR 2 2 CORRIDOR
1 1
FOR UTILITY 2.5% 2.5% FOR UTILITY
SERVICES Fencing to Control Fencing to Control SERVICES
0.50M
Access to EC Access to EC
0.50M
1.50M 1.50M
.
ZONE OF ACCELERATION
MINIMUM STRAIGHT MINIMUM TAPERED MINIMUM STRAIGHT MINIMUM TAPERED MINIMUM STRAIGHT
ZONE OF DECELERATION LENGTH 50M LENGTH 75M LENGTH 75M LENGTH 75M LENGTH 50M
MINIMUM MINIMUM
MINIMUM MINIMUM TRANSITION LENGTH 75M TRANSITION LENGTH 75M
MINIMUM
70.00M
TRANSITION LENGTH 75M MINIMUM TRANSITION LENGTH 75M (MINIMUM TAPERING 1 in 15) (MINIMUM TAPERING 1 in 15)
(MINIMUM TAPERING 1 in 15) (MINIMUM TAPERING 1 in 15) ACCELARATION LENGTH 95M
DECELARATION LENGTH 80M
50.00M
41.00M
60.00M
TAPERED LENGTH OF
SERVICE ROAD TAPERED LENGTH OF SERVICE ROAD
(TAPERING LIMITED TO 1 in 15) STRAIGHT LENGTH (MINIMUM TAPERING 1 in 15) MINIMUM MINIMUM
TRANSITION LENGTH 75M MINIMUM TRANSITION LENGTH 75M
MINIMUM MINIMUM (MINIMUM TAPERING 1 in 15) DECELARATION LENGTH 80M (MINIMUM TAPERING 1 in 15)
TRANSITION LENGTH 75M MINIMUM TRANSITION LENGTH 75M
LEGEND:- (MINIMUM TAPERING 1 in 15) (MINIMUM TAPERING 1 in 15)
ACCELARATION LENGTH 95M
MEDIAN/SEPARATOR ZONE OF DECELERATION
ZONE OF ACCCELERATION
CYCLE TRACK / UTILITY CORRIDOR IN URBAN AREA
EARTHEN SHOULDER
EARTHEN DRAIN
EMBANKMENT SLOPE
LANE MARKING
PLANTATION
6 LANE EC
6 LANE
ROW
70.00M
1.50M 7.50M 1.50M 7.50M 1.50M 1.00M 1.50M 10.50M 5.00M 10.50M 1.50M 1.00M 1.50M 7.50M 1.50M 7.50M 1.50M
SEPARATOR
SEPARATOR
SEPARATOR
SEPARATOR
MEDIAN
DRAIN CUM
DRAIN CUM
SHOULDER
SHOULDER
SHOULDER
SHOULDER
LHS SERVICE ROAD LHS CARRIAGEWAY TO LHS CARRIAGEWAY RHS CARRIAGEWAY LHS CARRIAGEWAY TO LHS SERVICE ROAD
EARTHEN
EARTHEN
COVERED FACILITATE ENTRY TO / EXIT 4.00M FACILITATE ENTRY TO / EXIT COVERED
PAVED
PAVED
CONCRETE FROM ECONOMIC CORRIDOR FROM ECONOMIC CORRIDOR CONCRETE
CORRIDOR CORRIDOR
FOR UTILITY FOR UTILITY
SERVICES SERVICES
0.50M
0.50M
2.5% 2.5% 2.5% 2.5% 2.5% 2.5%
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
.
.
TCS FOR ENTRY/EXIT FACILITY FROM MAIN
CARRIAGEWAY TO SERVICE ROAD AT THE START/END
OF URBAN AREA ( SECTION A-A )
ROW
70.00M
1.50M 11.00M 7.00M 1.00M 1.50M 10.50M 5.00M 10.50M 1.50M 1.00M 7.00M 11.00M 1.50M
SEPARATOR
SEPARATOR
DRAIN CUM
DRAIN CUM
SHOULDER
SHOULDER
SHOULDER
SHOULDER
LHS SERVICE ROAD LHS CARRIAGEWAY MEDIAN RHS CARRIAGEWAY RHS SERVICE ROAD
EARTHEN
EARTHEN
COVERED 4.00M COVERED
PAVED
PAVED
CONCRETE CONCRETE
CORRIDOR CORRIDOR
FOR UTILITY FOR UTILITY
SERVICES SERVICES
0.50M
0.50M
2.5% 2.5% 2.5% 2.5%
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
TCS FOR ENTRY/EXIT FACILITY FROM MAIN
.
.
CARRIAGEWAY TO SERVICE ROAD AT THE START/END
OF URBAN AREA ( SECTION B-B )
ROW
60.00M
1.50M 7.50M 1.50M 1.50M 1.50M 2.00M 1.50M 10.50M 5.00M 10.50M 1.50M 2.00M 1.50M 1.50M 1.50M 7.50M 1.50M
EMABANKMENT
EMABANKMENT
SHOULDER
SHOULDER
SHOULDER
SHOULDER
LHS CARRIAGEWAY MEDIAN RHS CARRIAGEWAY
EARTHEN
EARTHEN
4.00M
PAVED
PAVED
COVERED LHS SERVICE ROAD RHS SERVICE ROAD COVERED
SHOULDER
SHOULDER
EARTHEN
EARTHEN
CONCRETE CONCRETE
CORRIDOR CORRIDOR
DRAIN
DRAIN
FOR UTILITY 2.5% 2.5% FOR UTILITY
SERVICES 2.5% 2.5% SERVICES
0.50M
0.50M
2 2
1 Fencing to Control Fencing to Control 1
Access to EC Access to EC
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
TCS 6 LANE ECONOMIC CORRIDOR WITH 2 LANE SERVICE ROAD
.
.
BOTH SIDE IN RURAL SECTION ( SECTION C-C )
CITY ROAD / ODR WITH CITY ROAD / ODR WITH CITY ROAD / ODR WITH
LESS THAN 4 LANE GIVEN PLAN FOR SUBWAY IS MINIMUM OUTER RADIUS = 18.2 M AND LESS THAN 4 LANE MINIMUM OUTER RADIUS = 18.2 M AND LESS THAN 4 LANE
CONFIGURATION TENTATIVE. WIDTH AND HEIGHT INNER RADIUS = 5 M FOR LARGEST CONFIGURATION INNER RADIUS = 5 M FOR LARGEST CONFIGURATION
FOR SUBWAY SHALL BE TRAILING PATH OF WB18 TRUCK TRAILING PATH OF WB18 TRUCK
DESIGNED BY CONSULTANT AS TRAILOR ASSEMBLY AS PER IRC:41 TRAILOR ASSEMBLY AS PER IRC:41
PER SITE REQUIREMENT.
TAPERED LENGTH OF MEDIAN TAPERED LENGTH OF MEDIAN TAPERED LENGTH OF MEDIAN TAPERED LENGTH OF MEDIAN
TILED AREA
STAIRCASE (2.50M WIDTH) UTILITY DUCT/CYCLE TRACK TILED AREA STAIRCASE UTILITY DUCT/CYCLE TRACK UTILITY DUCT/CYCLE TRACK TILED AREA STAIRCASE
UTILITY DUCT/CYCLE TRACK RAMP RAMP
51.00M
51.00M
RAMP (2.50 M WIDTH)
ECONOMIC CORRIDOR ON VIADUCT FOOTPATH CUM DRAIN FOOTPATH CUM DRAIN ECONOMIC CORRIDOR ON VIADUCT FOOTPATH CUM DRAIN ECONOMIC CORRIDOR ON VIADUCT FOOTPATH CUM DRAIN
5.50M
SUBWAY
SUBWAY
SUBWAY
41.00M
41.00M
FOOTPATH CUM DRAIN FOOTPATH CUM DRAIN FOOTPATH CUM DRAIN
STRAIGHT LENGTH TAPERED LENGTH STRAIGHT LENGTH TAPERED LENGTH STRAIGHT LENGTH TAPERED LENGTH TAPERED LENGTH STRAIGHT LENGTH TAPERED LENGTH STRAIGHT LENGTH
CITY ROAD / ODR WITH CITY ROAD / ODR WITH CITY ROAD / ODR WITH
LESS THAN 4 LANE LESS THAN 4 LANE LESS THAN 4 LANE
CONFIGURATION CONFIGURATION CONFIGURATION
LEGEND:-
MEDIAN/SEPARATOR
LANE MARKING
PLANTATION
29.50M
SHOULDER
SHOULDER
SHYNESS
SHYNESS
0.50M 0.50M
PAVED
PAVED
PARAPET 2.5% 2.5% PARAPET
SHYNESS SHYNESS
>5.50M
2.50M 1.50M 1.50M 2.50M
UTILITY DUCT/
UTILITY DUCT/
CYCLE TRACK
CYCLE TRACK
DRAIN CUM
DRAIN CUM
FOOTPATH
FOOTPATH
2.5% 2.5%
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
ROW
68 - 70M
29.50M
SHOULDER
SHOULDER
SHYNESS
SHYNESS
0.50M 0.50M
PAVED
PAVED
PARAPET PARAPET
2.5% 2.5%
SHYNESS SHYNESS
1.00M 1.00M
2.50M 1.50M 11.00M 13.00M 13.00M 11.00M 1.50M 2.50M
SERVICE ROAD FOR SERVICE ROAD FOR SERVICE ROAD FOR SERVICE ROAD FOR
UTILITY DUCT/
UTILITY DUCT/
CYCLE TRACK
CYCLE TRACK
STRAIGHT MOVING TRAFFIC U-TURN FACILITY U-TURN FACILITY STRAIGHT MOVING TRAFFIC
SEPARATOR
SEPARATOR
DRAIN CUM
DRAIN CUM
FOOTPATH
FOOTPATH
2.5% 2.5% 2.5% 2.5%
10.00M
MEDIAN CUM DRAIN
ON BASIS OF SITE CONDITION AND FUTURE ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
TCS FOR U-TURN FACILITY ON 4 LANE SERVICE ROAD
ON URBAN AREA ( SECTION Y-Y )
ROW
51 - 55M
29.50M
SHOULDER
SHYNESS
SHYNESS
0.50M 0.50M
PAVED
PAVED
PARAPET PARAPET
2.5% 2.5%
SHYNESS SHYNESS
1.00M 1.00M
2.50M 1.50M 11.00M 7.50M 7.50M 11.00M 1.50M 2.50M
>5.50M
SERVICE ROAD FOR SERVICE ROAD FOR SERVICE ROAD FOR SERVICE ROAD FOR
U-TURN FACILITY U-TURN FACILITY
SEPARATOR
UTILITY DUCT/
UTILITY DUCT/
CYCLE TRACK
CYCLE TRACK
STRAIGHT MOVING TRAFFIC STRAIGHT MOVING TRAFFIC
SEPARATOR
DRAIN CUM
DRAIN CUM
FOOTPATH
FOOTPATH
2.5% 2.5% 2.5% 2.5%
4.00M
MEDIAN CUM DRAIN
ON BASIS OF SITE CONDITION AND FUTURE TCS FOR U-TURN FACILITY ON 4 LANE SERVICE ROAD ON BASIS OF SITE CONDITION AND FUTURE
REQUIREMENTS REQUIREMENTS
ON URBAN AREA ( SECTION Z-Z )
GRADE SEPARATED INTERSECTION
OF 4 LANE SERVICE ROAD WITH
4 LANE NH / SH / MDR / CITY ROAD
ABOUT 36.00M
TURNING RADIUS
ABOUT 70M
ABOUT 70.00M
36.00M
LEGEND:-
MEDIAN/SEPARATOR
LANE MARKING
PLANTATION
29.50M
SHOULDER
SHOULDER
SHYNESS
SHYNESS
0.50M 0.50M
PAVED
PAVED
PARAPET 2.5% 2.5% PARAPET
SHYNESS SHYNESS
>5.50M
2.50M 1.50M 1.50M 2.50M
UTILITY DUCT/
UTILITY DUCT/
CYCLE TRACK
CYCLE TRACK
DRAIN CUM
DRAIN CUM
FOOTPATH
FOOTPATH
2.5% 2.5%
TCS FOR 4 LANE SERVICE ROAD AT INTERSECTION IN URBAN AREA ( SECTION 1-1 )
ABOUT 80.00M
ROW
29.50M
SHOULDER
SHOULDER
SHYNESS
SHYNESS
0.50M 0.50M
PAVED
PAVED
2.5% 2.5%
SHYNESS SHYNESS
RAILING
RAILING ABOUT 15.00M ROTORY WIDTH AROUND 50.00M ABOUT 15.00M
2.5% 2.5%
5.50M
CROSS ROAD AT MINUS ONE LEVEL
GRADIENT 1 IN 40 GRADIENT 1 IN 40
TCS FOR GRADE SEPARATED INTERSECTION AT SERVICE ROAD IN URBAN AREA (SECTION 2-2)
36.00M
ROW
SEPERATOR
LHS RAMP TWO LANE MERGING
SEPERATOR
SEPERATOR
CUM WALL
CARRIAGEWAY CARRIAGEWAY
2.5% 2.5%