0% found this document useful (0 votes)
242 views1 page

Work Inspection Request Guidelines

This document is a work inspection request form submitted by a contractor to have work inspected at a project site. It provides details of the project name, contractor, date and time of inspection requested, category and location of works to be inspected, drawings references, work description and quantities. Space is provided for the contractor's work check, submission details and the engineer's comments and inspection codes indicating if the work can proceed or needs revision. Attachments for method statements, quality checklists and drawings can also be included.

Uploaded by

manish260320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
242 views1 page

Work Inspection Request Guidelines

This document is a work inspection request form submitted by a contractor to have work inspected at a project site. It provides details of the project name, contractor, date and time of inspection requested, category and location of works to be inspected, drawings references, work description and quantities. Space is provided for the contractor's work check, submission details and the engineer's comments and inspection codes indicating if the work can proceed or needs revision. Attachments for method statements, quality checklists and drawings can also be included.

Uploaded by

manish260320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

IR

Work Inspection Request No.


WIR/LUT/

Project Name

Contractor Name
Date Time Category of works to be inspected
Inspection Request submitted on

Work ready for inspection at site on


Drawing
Job Description Location App. Quantity
Ref. No.

Work checked by (on part of contractor)


Submitted By Signature Date

Lodha Engineer's Comments / Consultant’s Comments


Civil Finishing HVAC Electrical Plumbing …………...

Code 1 Code 3
Work may proceed Revise & Resubmit. Work may not proceed
Code 2 Code 4
Conditionally approved. Work may proceed after rectifying the For information and records only.
observation provided above. Work may proceed
Received by (on part of contractor )
Name Signature Date
Project In-
Site Engineer QE Engineer
charge
Signature Signature Signature

Date Date Date


Attach Documents
Method Statement Drawing
QC Cards/ Checklist Other …………………
Consultant Checking Report

Code 1 – Work may proceed Code 3 – Revise & Resubmit. Work may not proceed
Code 2 – Conditionally approved. Work may proceed after rectifying the observation provided above. Code 4 – For information and records only. Work may
Important: Permission to proceed does not relieve contractor from full compliance with contractual obligations
Format No-LUT/QE/DF-001/ Rev-0 Dt: 20/12/17

You might also like