1600 1600 1600

5950 5950 1600


= =

1000 1000

1.20mm gap to be filled with filler board


(styrofoam or shalitex or equivalent)
2.Horizontal reinforcement shall be cut and
maintain gap of 40mm minimum.
3.20mm Gap shall be started 500mm above from
slab TOC (Refer Section A Dwg no 141-095-CE-
GAD-0016-001_0B)

5900
5900

5900 5900

1000 1000

1600 5300 5300 5300 1600

CONTRACTION
JOINT LOCATION

TOTAL 1353.95
PA
RK
ING
AR
EA

SE
BU CURIT
ILD
ING Y

E
IN
EL
PIP
R
U
BO
M
JA
L
G
N
20mm gap shall be started
500mm above the slab TOC
POWER GENERATION AREA

THIS DRAWING