Title Format No.

:
Equipment ID: AHU-06
Verification of Utility AHU06-IOQ-ANEX3-00
Mansoor Daya Chemicals Limited
Objective: To verify the utilities catering (applicable) to the equipment / instrument / system

Acceptance Criteria: The provided utilities shall be adequate and fulfill manufacturer's standards/
requirements.

1) Electrical: Perform the adequacy check for electrical utilities by using clamp meter

Type Specification / Actual Checked By/Date Verified By/ Date


Recommendation
Voltage 415 V
320V
Frequency 50 Hz 50Hz

S.R. Stephen
Phase 3 Phase 3 Phase 18/11/2023

Others Not specified -

2) Non-electrical: Perform the adequacy check for non-electrical utilities by switching ON the
utility for 15 minutes and no leakages should be observed.

Chilled water: Applicable / Not applicable


Parameter Specification / Actual Checked By/Date Verified By/ Date
Recommendation
Temperature 7-14 ˚C 7 ˚C
S.R. Stephen
Pressure 1.5-3.5 kg/cm 2
2.37 kg/cm 2 18/11/2023

3.0 Any other utilities, if applicable:

None

Remarks / Deviation(s), if any:

Works within the standard

Checked By / Date: Verified By / Date:

IOQ-ANEX3 Page 1 of 1