Professional Documents
Culture Documents
PREPARED BY:
FUNDED BY:
PROJECT
PREPARED BY
NOV 2019
UNITED NATIONS OFFICE FOR PROJECT SERVICES
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
DRAWING LIST:-
S2-1
S2- 2
S2- 3
S2- 4
IUS-UWS-AMR002
PROJECT NO.
PREPARED BY
JUNE 2019
FUNDED
LOT.1
BY
PROJECT
PROJECT NO.
PREPARED BY
FUNDED
MUKALLA CITY-YEMEN
BY
E
S
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
LOT.1
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
Steel handle for lifting each cover has two,
and the max.cover length shall be not more than one meter.
RCC Cover of
10x50cm,B250
450
Cables
PIPE ZONE BACKFILL AND
EMBEDMENT
(SOFT AGGREGATE BACKFILL)
PCC, B200,
100 DN
10 mm thick
BEDDING
(SOFT AGGRAVATE BACKFILL)
Compacted soil,
10 mm thick
300 DN 300
REQUIREMENTS .
To be connected with
network pipe line
Discharge pipe
trench route
RCC support
60 Cable Pump
40
240
Steel cover 50 Cm
140
Detail B
Pump power
cable trench 14.40
60 Cm
30 Cm
30 Cm
CO2
FIRE EXTINGUISHER
5 Cm
CP
Existing control
room
IUS-WS-MUK-004
S2-1 Legend :
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Rev 01 28 / 11 / 2019
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
SECTION 2. CIVIL & ELCT PLANS.
PROJECT
PROJECT NO.
PREPARED BY
FUNDED
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
(+1.5) Steel Cover (+1.5) 0,2m
0,2m
3Ø8 3Ø8
DN 100
RCC Concret
Support
0,16m 0,1m
0,16m 0,1m
5Ø10 5Ø10 DN 100 5Ø10
Section (B)
DN 250 DN 250
DN 100 DN 100
Section (C)
C
Expansion
Vessels
DN 50
DN 100 DN 100
1.20 m
DN80
2m
Section(A)
ZMP1
ZMW1
ZW6
FLW3
FLW10
MW1
MW2
THW1
THW2
THW3
IUS-WS-MUK-004
Legend :
S2-1
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Rev 01 28 / 11 / 2019
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
Existing
GENERATOR NATIONAL
G GRID
PUMP AUTO
Distribution TRANSFORMER
Panle STARTER ,
PROTECTION AND
ATS CONTROL PANLE
10
G
IN PUT OUT
2 4
8
EARTH PIT
6
5
4
11
Cast Iron COVER WITH
INSPECTION "EARTHING PIT"
/ O 450 1
65 O 320 65
90 BACKFILL SOIL
EARTHING ROD 1 - Submersible electric pump.
60 250
2 - Cable clamp.
PROTECTIVE COVER
FILLED WITH GREASE 3 - Level sensors for protection against dry
CONCRETE HOUSING
running.
100
GRAVEL FILLING
4 - Non-return valve.
5 - Support bracket.
6 - Delivery pipe.
PVC INSULATED
90 O 120 90
7 - Electrical cable for motor power
O 300
COPPER 8 - Air valve
CONDUCTOR
SOLID COPPER EARTHING ROD 9 - Pressure gauge.
16 mm DIAMETER TO 1.2m
10 Protection,distribution,Auto-Transformer
starter panle
11 - Control cable
IUS-WS-MUK-004
S2- 2 Legend :
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Rev 01 28 / 11 / 2019
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
PLAN
0-3000
ELEVATION
150
GI WIRE
750
STIFFENER
GI CHAIN LINK
MESH
2100
60 OUT.Diax4mm STEEL ELEVATION ELEVATION
POST
1050
BASE CONC.
LINING ALL
ROUND (1:3:6mix)
150
100
FINISH GRADE LINE
700
CONCRETE GRADE C30/20
350
Legend :
S2- 3
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Rev 01 28 / 11 / 2019
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000
3930
END RAIL
40 100 40
1875 1875
HOOK BOLTS
2100
LOCK EYE OD 48.26 GI PIPE , (3.68MM MIN THICK) POST
10 MM Ø CABLE TRUSSING
50
100
300
800 mm 800 mm
400
300 mm 300 mm
500 mm 500 mm
IUS-WS-MUK-004
Legend :
S2- 4
PROJECT
PROJECT NO.
PREPARED BY
Designed Scale
Rev date
Drawing
FUNDED
Rev 01 28 / 11 / 2019
Checked
Equipping and Rehabilitating Ten Wells for HWSLC
Approved
BY
UNITED NATIONS OFFICE FOR PROJECT SERVICES WORLD BANK GROUP MUKALLA CITY-YEMEN
SOFTWARE MAKE PRINT LAYOUT-SHEET
ENG:ABDULRAHMAN ALZARRAEI
MOBILE : +967 770078000