Have team members all been assigned roles Documentation of Team member
within the team (including deputy leader and responsibilities on the team form and 100
board owner) ? evidence of responsibilities exercised (1)
Team
Is the historical data (timeframe and actual A chart of the specific data during a clearly
value) clearly shown and is data available so defined time frame that will be used to create
we can set a target based on best previous a reliable baseline for determining the results
performance ? of project actions(1)
Performance
indicators
On the chart with the Basline data there is a
Is the performance indicator's target forecast\target section with the $ value of the
(timeframe and value) clearly shown? targeted reduction and the time frame of the
project is defined in the horizontal axis(1)
Are the root causes clearly defined and do Countermeasures are possible for correction
they 'prompt' a countermeasure ? or improvement of the process(1)
I
Are corrective actions clearly visible with Corrective actions have been documented
target completion dates ? and time stamped for completion(1)
50
Are the majority of the actions completed on Corrective actions have been completed
target? during targetted time frame(1)
Are preventive actions clearly visible with Preventive measures have been defined and 80
target completion dates ? time stamped for completion(1)
Are the majority of the actions completed as Preventive actions have been completed
targeted? during targeted time frame(1)
40
Was the countermeasure ladder used to Training(1), OPL's used(1), Audits used(1),
Improve ensure that we have defined the best and Error proofing used(1), Automation\
most permanent countermeasures Elimination(1)
For each main action have we captured the Actions captured in OPL format(1),
Standards improvement in a OPL ? organized for retrievel(1)
A Sign-Off process utilized for 70
Is there a training matrix for the OPLs/ documentaion of training(1), Training
procedures used and is there a plan of Process documented(1), Evidence of
training affected personnel? understanding the training; associate
interviews, etc.(1)
30
Is the trend of the performance indicator Positive trend toward goal(5), improvements
positive and the link from main on chart documented in words and linked to
improvement actions implemented to results actions taken(1 point for each action taken 30
achieved clear on the KPI chart with a call showing improvement in performance up to 100
Results out ? 10)
Has the team achieved its goal or made 2 pts for each 10% improvement to goal
substantial progress toward the goal? achieved(10), Achieved Goal(5)
Available score - - - - - - - - - - - -
Have we linked the improvement to a
system that will check that ensures the new Controls have been documented in the
Standards
standard will be followed - e.g. PM system(1), Evidence of systematic checks(1)
system/layered audit
Can a group member explain the activity Each team member explains sections of the
People board? board without assistance(1 pt per member)
Involvement -
1 2 3 4 5 6 7 8
Are meetings well organized and is Agenda for meeting(1), Agenda followed 70
attendance at expected levels? and documented(1), Consistent meetings(1)
Available score 0 - - - - - - - - - - - -
Total 0 - - - - - - - - - - - -
Target 0 10 16 32 40 51 51 54 54 72 85 100 106 Check