November 2016
This publication was produced for review by the United States Agency for International Development. It
was prepared by the Public Sector Systems Strengthening (PS3) Activity located in Dar es Salaam,
Tanzania, under Contract AID-621-C-15-00003 with USAID/Tanzania.
The USAID/Tanzania Public Sector Systems Strengthening Activity (PS3)
USAID/Tanzania Public Sector Systems Strengthening Activity (PS3) overarching goal is to support the
Government of Tanzania to strengthen the public system to promote the delivery, quality, and use of
services, particularly for underserved populations. Led by Abt Associates, PS3 is implemented in
partnership with Benjamin William Mkapa HIV/AIDS Foundation, Broad Branch Associates, IntraHealth
International, Local Government Training Institute, Tanzania Mentors Association, and University of Dar
es Salaam and Urban Institute.
November 2016
Contract No:AID-621-C-15-00003
DISCLAIMER
The contents of this report are the sole responsibility of PS3 Activity and do not necessarily reflect the
views of USAID or the United States Government.
CONTENTS
ACKNOWLEDGMENTS ....................................................................................... v
1. EXECUTIVE SUMMARY .......................................................................vi
2. METHODOLOGY ...................................................................................1
3. FINDINGS AND RECOMMENDATIONS ...............................................2
3.1 ICT Infrastructure and Physical Conditions .............................................2
3.1.1 Building and Power Supply..........................................................2
3.1.2 Servers ........................................................................................3
3.1.3 Internet Connectivity ....................................................................3
3.1.4 Local Area Networks ...................................................................4
3.2 Availability of Automated Systems ..........................................................6
3.3 Resources, Policy and Planning .............................................................7
3.3.1 ICT Staff ......................................................................................7
3.3.2 ICT Plan ......................................................................................8
3.3.3 ICT Inventory ...............................................................................8
3.3.4 Disaster Recovery .......................................................................9
3.3.5 System and Network Security .....................................................9
3.4 Communications ...................................................................................10
3.4.1 Website .....................................................................................10
3.4.2 Email .........................................................................................10
4. KEY FINDINGS BY REGION ............................................................... 11
4.1 Mara Region .........................................................................................11
4.2 Dodoma Region ....................................................................................11
4.3 Iringa Region ........................................................................................12
4.4 Kagera Region ......................................................................................12
4.5 Shinyanga Region ................................................................................13
4.6 Rukwa Region ......................................................................................13
4.7 Mwanza Region ....................................................................................13
4.8 Mtwara Region......................................................................................14
4.9 Morogoro Region ..................................................................................14
4.10 Mbeya Region ......................................................................................14
4.11 Njombe Region .....................................................................................15
4.12 Kigoma Region .....................................................................................15
4.13 Lindi Region ..........................................................................................15
5. ANNEX ................................................................................................. 17
i
List of Tables
Table 1. Regions and LGAs Sampled for Field Work ....................................................... vii
Table 2: Priority Offices .................................................................................................................... 6
Table 3 : Summary on the ICT assessment findings in Mara Region ....................... 11
Table 9 : Summary on the ICT assessment findings in Mwanza Region................. 12
Table 10 : Summary on the ICT assessment findings in Iringa Region .................... 12
Table 5 : Summary on the ICT assessment findings in Kagera Region ................... 12
Table 7 : Summary on the ICT assessment findings in Shinyanga Region ............ 13
Table 13 : Summary on the ICT assessment findings in Rukwa Region ................. 13
Table 4 : Summary on the ICT assessment findings in Mwanza Region................. 13
Table 15 : Summary on the ICT assessment findings in Mtwara Region ................ 14
Table 8 : Summary on the ICT assessment findings in Morogoro Region .............. 14
Table 12 : Summary on the ICT assessment findings in Mbeya Region ................. 14
Table 11 : Summary on the ICT assessment findings in Mwanza Region .............. 15
Table 6 : Summary on the ICT assessment findings in Kigoma Region .................. 15
Table 14 : Summary on the ICT assessment findings in Lindi Region ..................... 15
Table 16: Annex 1: LGAs Included in the ICT Assessment ........................................... 17
List of Figures
Figure1: Central Systems and Respective Functions ......................................................... 5
ii
ADCL Asymmetric Digital Subscriber Line
BEMIS Basic Education Management Information System
DHIS2 District Health Information System 2
DC District Council
eGA e-Governance Agency
eLMIS Electronic Logistics Management Information Systems
GOT Government of Tanzania
HCMIS Human Capital management Information Systems
HMIS Health Management Information Systems
ICT Information and Communication Technology
ICTO Information and Communication Technology Officer
ISO International Standards Organization
IS Information Systems
LAN Local Area Network
LGAs Local Government Authorities
LGRCIS Local Government Revenue Collection Information System
LLG Lower Local Government
MC Municipal Council
PLANREP Planning and Reporting software
PORALG President’s Office, Regional Administration and Local Government
PS3 Public Sector Systems Strengthening
RAS Regional Administrative Secretary
RC Regional Commissioner
RS Regional Secretariat
SBAS Strategic Budget Allocation System
USAID United States Agency for International Development
USG United States Government
iii
ACKNOWLEDGMENTS
First and foremost, sincere gratitude is expressed to all those who have participated in the ICT
infrastructure assessment in 93 LGAs located in the 13 regions supported by the USAID-funded
PS3 Activity. Their commitment and level of effort embodies their dedication to improving
information systems and service delivery in Tanzania. The ICT Infrastructure assessment
exercise demonstrated a true PO–RALG and PS3 partnership at the highest level. It involved a
lot of hard work, while also serving to stimulate and inspire. The team approach leveraged skills,
built capacity and deepened relationships among those working together to achieve Tanzania’s
vision of public sector systems strengthening.
Special thanks go to the technical staff and ICT officers from PORALG, Regional Secretariat
(RS) and Local Government Authorities (LGAs). These teams devoted significant time and
effort, in spite of their busy schedules to make valuable contribution to the performance of this
exercise. Gratitude is also bestowed onto staff from LGA departments especially finance,
planning, education, health, human resources, agriculture, livestock, bees and forestry.
We would like to express our gratitude to other staff whose contributions were critical to the
completion of this daunting exercise including administration and finance staff who worked
behind the scenes managing all the necessary logistics for transport and meetings. Last but not
least, thanks goes to all those, not mentioned above, who have had a role in the various stages
of the performance of this collaborative exercise.
v
1. EXECUTIVE SUMMARY
The purpose of the Public Sector Systems Strengthening Activity (PS3) is to support the
Government of Tanzania in strengthening national systems to promote the delivery, quality, and
use of public services, particularly for underserved populations. In spite of a decade of
tremendous growth, 28.3% of Tanzanians live below the poverty line and lack access to basic
services.Due in large part to weak systems, critical service delivery gaps exist within and across
sectors, which impede realization of Tanzania’s Mkukuta/Mkuza and Development Vision 2025
goals. PS3 is a five-year USAID-funded activity with five components, or systems functions, that
work across multiple sectors: Governance and Citizen Engagement, Human Resources,
Finance, Information Systems, and Operations Research.
One of the objectives of PS3 is to strengthen and link, or increase interoperability of, existing
information systems, including Epicor, Planning and Reporting software (PlanRep), HR/Lawson,
the Local Government Revenue Collection Information System(LGRCIS), the District Health
Information System 2 (DHIS2), and other information systems, across and within sectors.
Linking these systems and tools will make it easier to report and share information across levels
of government and sectors. However, strengthening these systems requires a good information
and communications technology (ICT) infrastructure. The infrastructure constitutes a platform on
which software applications are run, to enable efficient and more-effective data collection and
use of data at the district level. Most of PS3’s Information Systems (IS) activities are at the local
government authority (LGA) level, although IS strengthening also requires substantial national-
level engagement to design, develop, and approve system improvements or remove barriers
that impede the efficiency and management of LGA systems.
Together with PORALG, the PS3 team assessed the IT infrastructure in all 93 LGAs located in
the 13 PS3 regions. The assessment found a significant lack of ICT infrastructure—notably local
area networks (LANs)—in the LGAs, particularly in the 21 new councils. In today’s world, it is
difficult to imagine efficient management of LGA systems and business processes without a
LAN. LGA managers not only have their own general management and business process
needs, but also are expected to connect to and use national systems, but this is impossible if
there is no LGA-level LAN. A common scenario is that only one LGA-level computer is
connected to national systems. Additionally, intermittent connectivity problems severely restrict
LGA-level access to national systems.
A functioning LAN is a key precondition for good performance of all government systems.The
cost of creating a LAN and building capacity of LGA IT staff to maintain it is low.
LAN: Most LGAs (85%) do not have a LAN that connects all departments. Many LGA
buildings have semi-structured LANs spanning from two to six rooms (e.g., Epicor room), but
connections between all LGA offices and staff generally do not exist. This significantly
undermines communications, operations, and efficiency.
Network connectivity: There is poor network connectivity between the LGA offices and
vi
PORALG, thus significantly reducing access to national systems. The two are connected
mostly via slow radio and asymmetric digital subscriber line (ADCL) Tanzania
Telecommunications Company Ltd.lines.
Staff: Not all staff have received required training for the information systems.
LGRCIS: Some LGAs (especially new LGAs) have not started implementing the LGRCIS,
due to lack of ICT infrastructure. All LGAs were required to collect their revenue using an
electronic revenue system by July 2016.
ICT equipment: The ICT equipment, such as computers and printers, does not meet
requirements.
Table 1. Regions and LGAs Sampled for Field Work
Connections and LAN Number of LGAs and RSs
With Fiber Connection 46
Fully LAN 3
No LAN 1
Semi LAN 42
With No Fiber Connection 58
Fully LAN 2
No LAN 17
Semi LAN 41
Grand Total 106
This report provides a detailed analysis of common ICT challenges experienced at the regional
level.It addresses not only the challenges but also the opportunities and recommendations for
improvements.It is intended to provide an overall summary of the findings; detailed reports for
each region were also developed as part of this initiative and shared with the respective LGAs
for planning purposes.
vii
2. METHODOLOGY
One of the objectives of PS3 is to help strengthen existing information systems such as Epicor,
Lawson, PlanRep, the LGRCIS and the DHIS2.However, in order to strengthen these systems
and ultimately support LGAs in using them in routine management, Tanzania needs a strong
ICT infrastructureto serve as the platform on which software applications are run.The main goal
of the ICT assessment was to determine the available ICT infrastructure at the LGA level. The
assessment focused specifically on environmental conditions, as well as the systems,
processes and people available to support an ICT environment.
The ICT assessment exercise was conducted by the PS3 IS team in collaboration with staff
from PORALG. Teams were comprised of PS3 and PORALG staff, as well representatives from
the Regional Secretariat (RS). ICT officers (ICTO) located at the LGA level also joined the
team. The assessment was conducted in all 13 PS3 regions, comprising 93 LGAs and 13
regional offices (Annex 1).In each LGA that was visited the methodology included:
A courtesy call with the District Executive Director at the LGA, or with the regional
administrative secretary at the RS office
A visit to each office, where one-on-one interviews were conducted with the department’s
representatives, and astandardized questionnaire was filled out
Ideas, comments and suggestions regarding ICT requirements were also collected from other
stakeholders, including the eGovernment Authority (eGa). The assessment also
includedInternational Standards Organization (ISO)guidelines and best practices as evaluation
benchmarks..
17 1
3. FINDINGS AND RECOMMENDATIONS
The following section outlines key findings across all LGAs in the 13 regions.Specific regional
and LGA findings appear in Section 4.
Reliable electric power system and physical environment is key to the durability and therefore
utilization of ICT infrastructure. We therefore recommend the following:
All ICT equipment should be connected to UPS or surge suppressor and power backup.
All electrical installations undertaken should follow all local authority guidelines
All electrical equipment should be maintained regularly
Numerous offices, including those in both Mara and Kagera Regions, reported experiencing
damage to ICT equipment as a result of thunderstorms; few offices have a lightening arrestor—
a device used on electrical power systems and telecommunications systems to protect the
insulation and conductors of the system from the damaging effects of lightning. Installing a
lightening arrestor will limit the amount of damage caused to the ICT equipment during storms.
Security was also noted as a risk factor: many computers and servers were stored in areas
without appropriate grills and locks, increasing the likelihood of theft and the risk of security
breaches. It is recommended that rooms containing the servers should have standard locks
and, if possible, CCTV cameras.
17 2
3.1.2 Servers
Most of the LGAs lack computer servers. Servers are important to LGAs, as they allow
centralized backup of users’ data, sharing of information across users in the LGA, and backup
for important standalone systems like the PlanRep. It is recommended that each LGA should
maintain a server and that all LGAs isolate a secure room to house the server; the room should
have both appropriate security including burglar bars as well as appropriate ventilation including
air conditioners.
Installation of the Rack Cabin (Like Mbeya CC) for accommodation of devices like routers,
switches, Servers, UPS, PABX etc.
Purchase at least one computer server to use for various roles including user authentication
to resources, file storages and backup for necessary data and systems
The storage conditions of the ICT equipment were problematic in almost all locations. Poor
ventilation, and exposure to sun, dust, and wind, increase the likelihood of damage to the ICT
equipment.It is recommended that computer rooms, especially server rooms, be placed in well-
ventilated rooms—using air conditioning, if available; opening doors and windows; and turning
down heat.The ideal temperature of an ICT suite is between 18 and 24 degrees Celsius, with
humidity between 40 percent and 60 percent.
The availability of devices especially the person computers that facilitate access of the LGA
systems is very limited to the LGAS. Many LGAs obtained personal computers when Epicor was
rolled out to the LGAs , the package usually consisted of four to five computers per LGA. These
computers were therefore in the finance department, now the other departments have to budget
for the personal computers of which most of the times the budgets are not fulfilled. At least you
can find computers in the finance department for uses with epicor and LGRCIS. There are also
a number of computers in the departments of HR which are used to access LAWSON and
education which are used to access BEMIS and Health department which are sued for HRHIS
and in engineering department. But overall majority of the departments are lacking computers
and devices for accessing systems. The average ration of Staffs to computers in most of the
LGAs is almost one third.
All LGAs are advised to connect with high speed data communication network (fiber optic)
which will facilitate connections to PORALG centralized systems such as the LGRCIS, Epicor,
3
BEMIS and other systems that uses the PORALG infrastructure, e.g., Lawson. While there are
several possible options for providing Internet connectivity to the councils, we recommend three
options:
Option 1: Mobile modem. This is easy to deploy, it only requires buying modems and airtime.
There are two possible settings with this option.
Internet access sharing: Computer networks allow multiple users to share a single Internet
connection. Special hardware devices allow the bandwidth of the connection to be easily
allocated to various individuals as they need it, and permit a council to purchase one high-
speed connection instead of many slower ones.
Reduced operating costs: A network lets co-workers share office equipment like printers,
fax machines, and voice and storage devices. This means that one can buy just one or two
4
shared printers for an entire office to use, rather than individual printers for each employee
who might need one.
Centralized IT administration: It is much easier and more efficient to manage the many
computers that a council has from a single platform than it is to manage each of them
individually. Also, IT administrators can remotely troubleshoot problems on computers
across the network rather than doing it in person.
LANS make it easy to manage Internet costs.
It is therefore recommended that LGAs consider the following actions to establish a functioning
and effective LAN:
Install LAN and Perform structured cabling for voice and data for the whole building
One server machine and install active directory that will be used for user authentication &
authorization of resources (security) including assigning and enforcing security policies for
all computers, backup storage, pushing of antivirus & updates
Ensure printers are connected to the network
Installing PBX/intercomfor internal voice communication
Increase the ratio of number of personal computers to staffs
5
3.2 Availability of Automated Systems
The major business processes conducted at the LGA level are planning, revenue collection,
payment, and expenditure. LGAs also managetheir areas’ educational systems, human
resources, agriculture, engineering and health care. It has been proven that when these
processes are conducted using information systems they increase their efficiency and
effectiveness dramatically. For example, use of Epicor has led to improvements in financial
management. LGRCIs has provided improvements in revenue collection; the same applies to
PlanRepfor planning, and Lawson for HR and other sector systems.
However, many system users throughout the region reported frustration that the systems are not
connected to the central level. Notably, Epicor, BEMIS, the LGRCIS and Lawson were discussed as
they use the same channel of communication and should be connected. It is encouraged that the
common and key business processes have connections to these systems as outlined on the
priority offices below.It is recommended that each office room has a minimum of eight
connection points.
Table 2: Priority Offices
Priority Offices for ICT Investment IS Software to be Supported
Finance-Cashier Epicor, LGRCIS, PlanRep
District/Municipal/Town Treasurer Epicor, LGRCIS, PlanRep
Revenue Accountants Epicor, LGRCIS, PlanRep
Trade/Business License registration in the LGRCIS
Internal Audit Review all systems in place
Council Director Office Custodian of all systems
Human Resources Lawson
Ardhi/Land Evaluator for Property Tax-LGRCIS; Geographic Information
System (GIS)
Engineering/Ujenzi for GIS LGRCIS
Information Communication Administrator of all systems
Technology
Procurement Management Unit Epicor to create LPOs
Planning PlanRep
Health DHIS2
Education Basic Education Management Information System (BEMIS)
Agriculture Agriculture Routine Data System (ARDS)
It is important to note that staff training for the IS systems were varied and often lacking. Many staff
reported that they had not received official training of the electronic systems being used at the LGA
level. Others expressed concern that because they were not trained, they felt they were incapable
of extensive using of the functionalities available at the systems. In most of the LGAs, only few a
staff have received training on PlanRep. It therefore critical that as new systems are rolled out and
introduced at the LGA level, that a complimentary training program also be deployed. Staff training
on these systems will be central to their use at the LGA level, and will only continue to enhance the
capabilities of IS to be used for business processes.
6
3.3 Resources, Policy and Planning
As per the new LGAs Structure of Organisation, each LGA is required to have an ICT division
which employs the ICT staff. In addition, the ICT division should also have its own budget and
plans. However, the assessment found that most LGAs provide a limited budget for developing
and maintaining the ICT systems. The assessment findings found an overall lack of appreciate
and understanding for the important of ICT at the LGA level.
There should be deliberate effort in demonstrating on the importance of having a solid ICT
infrastructure to the DC to create awareness among the decision makers in the LGA’s as
currently low priority given to the ICT department.
LGA’s should increase internal own source collection which seems to directly affect budget
allocation to the ICT department.
PORALG should be responsible in providing standard technical specifications of the ICT
equipmentfor easy management and troubleshooting
There is a need of having external expertise in assisting local ICT staff in developing an ICT
plan
There is a need of developing a template/document repository that will be hosted by PO-
RALG consisting of generic documents such as an ICT plan and an inventory list for access
to all LGA’s to have uniformity among them
LGA’s should be proactive in working closely with eGA and PORALG
There must be a unified security procedure on all systems available in the DC since each
system has its own standard operating procedure on security
In order to maximize the use of ICT by the CMT team, a reliable ICT support is necessary.
ICTOs should be appropriately trained, meet minimum qualifications, and be given authority
7
to carry out the full mandate
ICTOs should be responsible and given the authority to provide training for all available ICT
systems at the LGA level
ICT division should receive the appropriate budget and funding to carry out the functions
ICT division should be the first point of contact for troubleshooting ICT related problems
within the council
ICTOs should be required to maintain technical expertise on LGA systems, and should be
supported to attend technical training provided by eGa and/or PORALG
Going forward, financial resources for basic ICT infrastructure, reoccurring costs, maintenance
and training should be in place at each LGA office. This will ensure the sustainability and
longevity of the infrastructure and systems.Budgets for ICT should be increased at least to
ensure the above basic and important infrastructures are installed because these infrastructures
will facilitate the other systems and therefore increase revenue collection, decision making,
statistical analysis and provisioning of social services.
In most councils, the ICT inventory included in the inventory of all assets which is maintained by
PMU unit. However, we recommend councils maintain a separate ICT inventory. The inventory
should include information about warranties and vendor contact. The lack of standardized and
updated ICT inventory was a concerning finding. Going forward, LGAs should establish a
systematic way to ensure appropriate tracking of ICT inventory, notably to track lifetime
information and depreciation period.
In order to clear the path for efficient equipment procurement, there must be a change in mind-
set as well as the procurement processes. Increased communications between procurement
departments and the IT department/ staff are essential. Therefore the procurement of IT
equipment should be done in collaboration with IT department (i.e.,IT staff). The IT department
shall be responsible for the following:
8
Providing technical specifications of the equipment
On delivery, inspection of the supplied equipment if they meet the expected specifications
A firewall to restrict unauthorized users (outside) from accessing the networked resources
Part of the security should include users accounts and passwords that will give limited
access
Define different access policies/capabilities for different users based on their role and
responsibilities
Install and regularly update anti-virus software to detect, stop and remove viruses and help
you repair the damage
Restrict email and Internet access to those who need it
Use web browser's security functions to restrict specific high-risk sites
Ask employees not to open attachments from unknown or suspicious senders
User computers should be restricted from having administrative privileges
9
3.4 Communications
3.4.1 Website
LGA websites are a significant communication tool for sharing relevant information with citizens.
The audience is broad; thegeneral public, the investors who might be interested in exploring
investment opportunities, the tax payers who might want to know various tariffs, the tourist who
might want to know about tourists attractions, the researchers and students who might need
reports and statistics. Most of the LGAs do not have websites. Only 5 out of 7 LGAs per region
had a website. While the cost of establishing websites includes domain registration, designing,
developing, training and maintaining is relatively affordable, most LGAs have not prioritized
websites in the budget. LGAs can assign communications officers who are the knowledgeable
professionals to establish websites with support from ICT officers.
3.4.2 Email
It is illegal to use a disposable email (such as a Hotmail or Gmail) for official government
communication per new national guidelines. A government mail system not only offers official
and secure communications but also facilitate easy information sharing among the LGAs
through groups email and the LGA share point. The eGahas since established a mailing system
for the government that could be easily adopted byLGAs as well.While some LGAs expressed
reluctance to register for government email due to costs, further sensitization needs to be done
with LGAs as it is relatively affordable to establish this type of email system.
10
4. KEY FINDINGS BY REGION
This section outlines the summary of specific findings in each LGA by region.
In Mara there are three new LGAs. These new LGAs have no LAN at all and no reliable connections
to the central systems including Epicor, LGRCIs, LAWSON and BEMIS and hence they were relying
on the slow ADCL connections that were terminated to a single computer that provided access to
LASWSON. The summarized findings are listed in the table below.
Table 1 : Summary on the ICT assessment findings in Mara Region
S LGA LAN CONN IMPORTANT SYSTEMS POS
N
1 Mara RS Fully Fiber Epicor, Strategic Budget Allocation System (SBAS) NA
LAN present
2 Musoma Semi Fiber Epicor, LGRCIS present 56
MC LAN POS
3 Musoma Semi No Epicor present, no LGRCIS 0 POS
DC LAN fiber
4 Butiama DC No LAN No No Epicor, no LGRCIS 0 POS
fiber
5 Serengeti No LAN No Epicor, LGRCIS present 0 POS
DC fiber
6 Tarime DC Semi Fiber Epicor, LGRCIS present 7 POS
LAN
7 Tarime TC Semi Fiber No Epicor, LGRCIS present 0 POS
LAN
8 Bunda DC Semi No Epicor present, no LGRCIS 0 POS
LAN fiber
9 Bunda TC Semi No No Epicor, no LGRCIS 0 POS
LAN fiber
10 Rorya DC No LAN No Epicor present, no LGRCIS 0 POS
fiber
11
Table 2 : Summary on the ICT assessment findings in Mwanza Region
SN LGA LAN CONN IMPORTANT SYSTEMS POS
1 Dodoma RS Semi LAN Fiber Epicor, SBAS present NA
2 Dodoma MC Semi LAN Fiber Epicor, LGRCIS present 20 POS
3 Chamwino DC Semi LAN No fiber Epicor, LGRCIS present 10 POS
4 Kondoa DC Semi LAN No fiber Epicor, LGRCIS present 15 POS
5 Chemba DC No LAN No fiber No Epicor, no LGRCIS 0 POS
6 Bahi DC No LAN No fiber Epicor, LGRCIS present 10 POS
7 Kongwa DC Semi LAN Fiber Epicor, LGRCIS present 6 POS
8 Kondoa TC No LAN No fiber No Epicor, no LGRCIS 0 POS
9 Mpwapwa DC Semi LAN Fiber Epicor, LGRCIS present 12 POS
12
4.5 Shinyanga Region
In Shinyanga Region total of seven LGAs including the RS office were assessed. These LGAs
Shinyanga RAS, Shinyanga MC, Shinyanga DC, Ushetu DC, Kishapu DC, Msalala DC and
Kahama TC. The summarized findings for LGAs in this region are indicated in the table below.
Table 5 : Summary on the ICT assessment findings in Shinyanga Region
SN LGA LAN CONN IMPORTANT SYSTEMS POS
1 Shinyanga RAS Semi LAN Fiber Epicor present NA
2 Shinyanga MC Semi LAN Fiber Epicor present, no LGRCIS 0 POS
3 Shinyanga DC Semi LAN Fiber Epicor present, no LGRCIS 0 POS
4 Ushetu DC Semi LAN No fiber Epicor present, no LGRCIS 0 POS
5 Kishapu DC Semi LAN No fiber Epicor present, no LGRCIS 0 POS
6 Msalala DC Semi LAN Fiber No Epicor, LGRCIS present 6 POS
7 Kahama TC Semi LAN No fiber No Epicor, LGRCIS present 0 POS
13
4.8 Mtwara Region
In Mtwara Region total of eight LGAs including the RS office were assessed. These LGAs are
Mtwara RS, Mtwara MC, Mtwara DC, Nanyamba TC, Tandahimba DC, Nanyumbu DC, Masasi DC
and Masasi TC. The summarized findings for LGAs in this region are indicated in the table below.
Table 8 : Summary on the ICT assessment findings in Mtwara Region
SN LGA LAN CONN IMPORTANT SYSTEMS POS
1 Mtwara RS Semi LAN No fiber Epicor, SBAS present NA
2 Mtwara MC Semi LAN Fiber Epicor, LGRCIS present 30 POS
3 MtwaraDC Semi LAN Fiber Epicor present, no LGRCIS 0 POS
4 Nanyamba TC No LAN No fiber No Epicor, no LGRCIS 0 POS
5 Tandahimba DC Semi LAN Fiber Epicor, LGRCIS present 0 POS
6 Nanyumbu DC Semi LAN No fiber Epicor, LGRCIS present 0 POS
7 Masasi DC Fully LAN Fiber Epicor, LGRCIS present 0 POS
8 Masasi TC Semi LAN No fiber No Epicor, LGRCIS present 0 POS
14
5 Chunya DC Semi LAN Fiber Epicor, LGRCIS present 0 POS
6 Rungwe DC Semi LAN No fiber Epicor, LGRCIS present 0 POS
7 Kyela DC Semi LAN No fiber Epicor, LGRCIS present 0 POS
8 Busokelo DC No LAN No fiber No Epicor, no LGRCIS 0 POS
15
2 Lindi MC Semi LAN Fiber Epicor, LGRCIS present 7 POS
3 Lindi DC Semi LAN Fiber Epicor, LGRCIS present 0 POS
4 Liwale DC Semi LAN Fiber Epicor, LGRCIS present 5 POS
5 Nachingwea DC Semi LAN Fiber Epicor, LGRCIS present 4 POS
6 Ruangwa DC Semi LAN Fiber Epicor, LGRCIS present 0 POS
7 Kilwa DC Semi LAN Fiber Epicor, LGRCIS present 0 POS
16
5. ANNEX
17 17
COMPREHENSIVE ICT ASSESSMENT REPORT:
SITUATION ANALYSIS IN 13 REGIONS PORALG
& PS3 COLLABORATIVE ACTIVITY