User Requirement Specification: User Requirement Specification
Template
Company
Contents
1. Introduction 3
2. Objective 3
3. Scope 3
3.1. In-Scope 3
3.2. Out-of-Scope 3
4. Criticality & Risk Assessment 4
4.1. Criticality 4
4.2. Risk 4
4.3. Testing Requirements 4
5. Requirements 5
5.1. Compliance Requirements 5
5.2. Process & Operational Requirements 5
5.3. Constraints 8
5.4. Life-Cycle Requirements 8
6. Referenced Documents 11
7. Definitions 11
Notes
Fields marked [Company] or [Title], etc. can be updated within the document and should
change all other references to the field instantly.
All text provided is either instructional (red text) or example (black text) and should be
modified/deleted as appropriate.
Because URS can apply to very small and very large projects, it is difficult to provide examples
of requirements to cover all eventualities. The example text provided is for a small HVAC
system. It demonstrates how requirements should be written, but clearly cannot cover
requirements for all equipment types
Page 2 of 11
User Requirement Specification: User Requirement Specification
Template
Company
1. Introduction
This should be a very brief introduction how this URS has arisen and what it is for.
Company is constructing a new manufacturing facility in Company Address . As part of this
new facility, a User Requirement Specification Template is required. This User Requirements
Specification (URS) documents the user and regulatory requirements for the User
Requirement Specification Template. The URS will be used as the basis of design and
qualification for the User Requirement Specification Template.
Note: in some cases, the URS is not the basis for design, and in some other cases, ‘selection’
may be a more appropriate term where there is no design phase involved.
It is also possible that a URS has been prepared retrospective to order. In these cases, the
introduction should make this clear and justify the position.
2. Objective
The objective of this URS is to define and document the requirements of the User
Requirement Specification Template at Company Address , including:
design
construction
qualification
operation
Appropriate definition and application of these requirements will result in an operational
facility in compliance with all user requirements as well as applicable regulatory requirements.
3. Scope
What is in and out of scope may vary from one URS to another. These sections should be
edited accordingly.
3.1. In-Scope
The scope of this URS is limited to the User Requirement Specification Template at Company
Address. The plans and schedules provided in attachment 1 clearly identify the limit of supply.
The URS details the following requirement types:
compliance requirements
process and operational requirements
constraints
life cycle requirements
The URS describes all the requirements deemed relevant to the items above for the User
Requirement Specification Template. Testing for each requirement is determined through
criticality and risk assessment as described in Section 4.
3.2. Out-of-Scope
This URS does not include:
Page 3 of 11
User Requirement Specification: User Requirement Specification
Template
Company
statutory construction requirements, considered the responsibility of the builder and their
sub-contractors;
architectural or engineering functional or detailed design, considered the responsibility of
the contracted designers;
statutory requirements for occupational health, safety and environment, considered the
responsibility of the contracted designers.
The URS is not applicable to general office and other areas not directly required for the
operation of the GMP facility
4.1. Criticality
The User Requirement Specification Template has been assessed in accordance with SOP002 -
Criticality and Risk Assessment as follows:
4.2. Risk
This URS has been completed in accordance with SOP002 - Criticality and Risk Assessment.
Each listed requirement has been assessed for risk and assigned a Risk Priority (High, Medium
or Low). This risk priority should be used to make priorities for design and/or testing
requirements.
Each risk priority identifies the risk to product quality and/or other risks as deemed relevant if
the requirement is not implemented, or implemented incorrectly. The risk priority is
determined by analysis of:
the severity of the risk event
the probability of detection before occurrence
and the likelihood of its occurrence without intervention.
This risk assessment has identified:
16 requirements of High risk priority
32 requirements of Medium risk priority
19 requirements of Low risk priority
Page 4 of 11
User Requirement Specification: User Requirement Specification
Template
Company
Based on the risk and criticality categorisations above and in accordance with SOP002 -
Criticality and Risk Assessment for Validation and VMPXXX –Validation Master Plan, User
Requirement Specification Template requires Commissioning, followed by Design, Installation,
Operational and Performance Qualification as minimum testing requirements.
The level of testing conducted for each requirement shall be commensurate with the risk
priority identified in the requirements table in Section 5.
5. Requirements
U2. The User Requirement Specification Template shall comply with the relevant M
requirements for manufacture of Sterile Medicinal Products, as regulated by the
TGA in Australia (PIC/S Guide to Good Manufacturing Practice, PE009-8, Annex 1).
U3. Classification of the HVAC system shall be performed in accordance with ISO L
14644 or AS 14644.
Temperature control shall be by cooling and reheat coils in each AHU, supplied by
U5. M
chilled and heating hot water systems dedicated to the HVAC system.
The HVAC systems shall feature an energy saving mode for idle periods and shall L
U6. automatically increase the temperature set-point in all supplied rooms to 22°C for
those periods.
Page 5 of 11
User Requirement Specification: User Requirement Specification
Template
Company
U8. Terminal filters shall be provided to achieve the required degree of air quality. M
Grade C and higher classifications shall be achieved through the use of terminally H
U10. mounted HEPA filtration (H13 or above), or similar pre-approved filtration, to filter
supply air.
Return air from Manufacturing 1 shall be HEPA filtered at the face of the return air M
U11.
duct to facilitate containment of cytotoxic materials.
U12. Terminal HEPA filters shall be bottom accessed for testing and replacement. L
Separate HVAC systems shall be supplied to service the cytotoxic and non- M
U13.
cytotoxic areas of the facility.
Page 6 of 11
User Requirement Specification: User Requirement Specification
Template
Company
1. Room pressures are target values. Variation from the target of up to 5 Pa is permissible,
provided the intent of the pressure cascade is not compromised, and a minimum differential pressure
of 10 Pa is maintained where there is a change of grade.
2. Room Grades are defined by PIC/S Guide to Good Manufacturing Practice, Annex 1, except:
a) Airlocks designated C/B are nominally Grade C “in operation” for the entire room, while the
area immediately prior to cleanroom entry must meet Grace B in the ‘at rest’ condition.
b) Rooms designated U/C are unclassified, but controlled areas.
Personnel Airlocks for entry to Grade B areas shall be nominally Grade C, but meet H
U28.
grade B ‘at rest’ in their final stage before entry to the manufacturing suites.
The HVAC systems shall achieve (or better) the specifications detailed above and H
U29. shall be qualified to verify that the specified conditions have been achieved in the
‘at rest’ state, in accordance with PE009-8 Annex 1 and ISO 14644.
U30. The insulation inside the air handling units shall be non-shedding. L
U31. The air handling units shall be provided with adequate access for cleaning. L
Ductwork construction shall be GMP compliant, rigid sheet metal where practical L
U33.
and with external insulation where appropriate.
The location of make-up air inlets shall be carefully selected to avoid the M
U34.
opportunity for contaminated air to be introduced.
Air supply points to classified rooms shall be selected considering the following H
criteria in order of priority:
U35.
Minimise interference with laminar flow/cytotoxic safety cabinet operation
Maximise the mixing of air in order to minimise the room recovery time
Visible and calibratable room pressure indicators for all critical rooms shall be M
U36.
installed in centrally located panel(s) to simplify routine monitoring.
Electrical Requirements
Hydraulics Requirements
Chilled water and heating hot water piping shall be labelled with name of service L
U39.
as well as flow direction where appropriate
Page 7 of 11
User Requirement Specification: User Requirement Specification
Template
Company
5.3. Constraints
List all constraints that define the boundaries/limitations of the project, and which
are not inherent in the previously listed requirements. Consider space constraints,
site service availability, project time constraints, site standards and policies,
compatibility requirements with existing systems and equipment
Scheduled modification to building structure works requires completion and
U40. L
handover of the system prior to December 31, 2011.
The system shall be available 24 hours per day, 7 days per week. Routine
U41. M
maintenance events requiring system shut-down should be kept to a minimum.
U42. All componentry for the installation must comply with ENG-XXX Site Engineering L
Standards, except where written approval of the engineering department has been
obtained.
U43. The system shall be constructed in the existing space identified in the plans in L
Attachment 1.
U44. Heating Hot Water and Chilled Water Services shall be connected to existing water L
mains connections available as indicated on the plans and schedules attached in
Attachment 1.
U45. Electrical components shall be compatible with the available electrical supplies of M
240V single phase and 415V 3 phase.
U46. The system is required to interface with the site Building Management System. M
U47. The system shall be designed with an intended life of no less than 15 years. L
During the design phase, and as part of final design approval, design team meetings will be
conducted. The outcomes of these meetings will be recorded and compiled by Company as the
design review.
The design review shall demonstrate that the design meets all relevant user, H
U48.
functional, design, regulatory and compliance requirements.
Commissioning Requirements
At the completion of installation, the system shall be commissioned by the installer and/or
subcontractors to the installer, prior to handover to Company. The following are the minimum
requirements for commissioning.
Page 8 of 11
User Requirement Specification: User Requirement Specification
Template
Company
Tester shall supply documented evidence that the requirements of this URS have M
U50.
been met where appropriate.
U51. All HEPA filters shall be integrity tested in accordance with AS 1807.6 and 1807.7. M
All classified rooms shall be classified ‘at-rest’ in accordance with ISO 14644-1 and M
U52.
14644-3.
Recovery rate testing shall be performed for all Grade B rooms, in accordance with M
U53.
ISO 14644-3, B12.3.1.
The installer shall supply an operation and maintenance manual which includes as M
a minimum:
Identification of component parts and supplier literature for all components
which may require replacement
Operating instructions for the system, and for individual components where
U56. appropriate
As-built system layout drawings
As-built system specifications
Contact details for suppliers and maintenance contractor(s)
Preventative maintenance task list with recommended frequencies
The installer shall supply a commissioning record with details and results of all M
U57.
commissioning tests and testers.
Company shall ensure that the following SOPs have been created and/or updated H
for the system:
operation
U58. monitoring
calibration
maintenance
cleaning
Qualification Requirements
At the completion of commissioning, the system shall be qualified by Company and/or by consultants
to Company, The following are the minimum requirements for qualification.
Page 9 of 11
User Requirement Specification: User Requirement Specification
Template
Company
Life-cycle Testing
HEPA filter integrity testing shall be added to the site validation register and H
performed at the following frequencies:
U62.
Filters supplying Grade A zones shall be tested 6 monthly
Filters supplying Grade B and C zones shall be tested annually
All room and zone classification shall be added to the site validation register and H
U63.
conducted annually.
Maintenance
The system shall be installed with a warranty period of no less than 12 months on L
U64.
all parts and labour.
Training
Training shall be provided to all operations and maintenance personnel and cover M
U66. operation, monitoring, cleaning, safety, calibration and maintenance. Training shall
be documented and maintained.
Change Control
Changes made to the system after approval of the URS shall be subject to change M
U67.
control.
Page 10 of 11
User Requirement Specification: User Requirement Specification
Template
Company
6. Referenced Documents
The following documents may assist in the understanding of this specification
7. Definitions
Term/abbreviation Definition
DOCUMENT END
Page 11 of 11
Validation Project Plan: User Requirement Specification
Template
Company
Change History