QUALITY REPORTING PROCEDURE
Revision History
Version Control
Version No. 00
Reviewed By
Summary of
No. Date Name Designation Signature
Changes
Concurred By
Summary of
No. Date Name Designation Signature
Changes
Approved By
Summary of
No. Date Name Designation Signature
Changes
0DMQL00-DLVR-00-SEV-QM-PRO-00007 Page | 2
QUALITY REPORTING PROCEDURE
Table of Contents
Revision History ................................................................................................................................ 2
1 Overview.................................................................................................................................... 4
0DMQL00-DLVR-00-SEV-QM-PRO-00007 Page | 3
QUALITY REPORTING PROCEDURE
1 Overview
1.1 Purpose
This procedure establishes the governance and describes the External Quality Reporting process including:
a. Procedures
b. Tools
1.2 Responsibilities
Each Contractor is ultimately responsible for establishing a quality reporting system. This quality reporting
system shall ensure collecting and submitting quality information on time as per contract documents and
requirements.
Role Responsibility
Contractor Quality • Prepare and submit Monthly Quality Reports on time in accordance with
Manager SEVEN requirements.
• Prepare and keep updated logs and information needed for Monthly
Quality Reports
SEVEN Document • Receive Monthly Quality Reports (MQR) from Contractor, update logs,
Controller and forward to SEVEN Program Delivery Team.
• Maintain and update the Monthly Quality Reports (MQR) Log Sheets.
SEVEN Project • Receive feedback from SEVEN Program Delivery Team on major quality
Executive issues/events included on DQR & MQR.
• Provide direction, advise, and/or decision for major Project quality issues.
0DMQL00-DLVR-00-SEV-QM-PRO-00007 Page | 4
QUALITY REPORTING PROCEDURE
2 REPORTING PROCEDURES
In the project’s execution phase, every Contractor is responsible for reporting on project quality
performance, SEVEN Program Delivery Team is responsible for commenting on any quality reports issued by
the Contractor and forwarding his comments or his own generated quality reports to SEVEN Project
Executive.
The Monthly Quality Report must include, but is not limited to:
d. NCR log
j. Quality personnel forecast to be mobilized or demobilized in the next sixty (60) days