You are on page 1of 2

EIA important portions module wise

Module 1

1. Need for EIA


2. Why environmental protection act 1986 is called umbrella act?
3. Environmental standards for water,air and noise
4. Evolution of EIA in India & Global
5. AirAct, water act
6. Salient features of EIA notification 2006

Module 2

1. Environmental clearance process


2. Screening and scoping of projects
3. Form 1/ TOR – basic idea
4. Initial environmental examination
5. Types of EIA
6. Rapid EIA and comprehensive EIA
7. Generic structure of EIA report

Module 3
1. EIA methodologies – concept, advantage and disadvantages
2. Air quality modelling – just study its importance
3. Air, Water , noise, quality assessment – assessment steps
4. Steps to assess the impacts on ecological and socio-economic environment

Module 4

1. Benefits of environmental Audit


2. Basic concept and Importance of Environmental management Plan
3. Content of environmental management plan
4. Basic concept and Features of environmental monitoring plan
5. Types of environmental Audit
6. Procedure for conducting an environmental Audit
7. ISO 14001 standard – concept and importance
8. Stages in ISO 14001 standard implementation

Module 5
1. Impacts of High way project on air quality
2. Environmental monitoring program for a quarry mining industry
3. Environmental clearance procedure for an airport
4. How to assess impacts of a hydro electric project
5. Detail case studies of High way project,hydro electric powerplant, airport,quarry mining
project and solid waste management project

Downloaded from Ktunotes.in


Steps to be included in case studies:
 Introduction
 Project description
 Analysis of alternative
 Description of environment
 Anticipated environmental impact and mitigationmeasures
 Environmental monitoring program
 Additional studies
 Project benefits
 Environmental cost benefit analysis
 Environmental management plan
 Summary and conclusion
 Disclosure of consultants engaged

Downloaded from Ktunotes.in

You might also like