You are on page 1of 17

Indonesia Petroleum

Bidding Round (IPBR)


2022
NEW TERMS AND CONDITIONS

lower

10%
6 Exploration Working Areas Offered

Paus

Peri Mahakam

Jabung Tengah

Bose
Sangkar
Bunga

TENDER SCHEDULE
BIDDING MECHANISM
Government awards oil and gas Contract Area through bidding process for local and foreign
company.

Information regarding to the area released for the bidding is provided in


https://esdm.go.id/wkmigas

In accordance to the Minister of Energy and Mineral Resources Regulation No.35 of 2021,
bidding process is conducted through 2 (two) schemes, they are Regular Tender and Direct
Proposal Tender.

▪ Regular Tender tends to be a rigid process


during bidding and basically take it or leave it
in principle, Government stipulate the terms BIDDING QUALIFICATIONS
& conditions of the area for Regular Tender
(firm commitments, contract schemes etc). ▪ Domestic and overseas
companies are eligible
▪ Direct proposal schemes offers more flexible
process, local or foreign companies may ▪ Having good technical &
nominate open areas and then given such financial capability to conduct
Joint Study approval to conduct preliminary petroleum operations
study with DITJEN MIGAS 1) for 6-8 months.
The companies may propose terms & ▪ Good track record
conditions to Government. At the end, this ▪ Provide Bank Guarantee from
joint study’s area also will be announced for reputable banks operated in
bidding round, whereas the conductor of Indonesia
joint study shall have privilege to match the
higher bid, if there are competitors. ▪ Accessing Bid Document
During bidding process, Government stipulate ▪ Accessing Data Package
certain area in which PERTAMINA 2) may have
right to get a 15% participating interest offering ▪ Register to
from the awarded bidder. Implementation of https://esdm.go.id/wkmigas
this participating interest offering is in a b-to-b
basis.
Winning bidder will sign the contract with SKK MIGAS 3) or BPMA 4)
1) DITJEN MIGAS is abbreviation for Directorate General of Oil and Gas, a government unit under Ministry of Oil and Gas
which has role in regulating of oil and gas sector
2) PERTAMINA, state-owned limited liability company
3) SKK MIGAS, a task force given the task by the Government of the Republic of Indonesia c.q. the Minister of Energy and
Mineral Resources (“MEMR”) to conduct the management of upstream oil and gas business activities
4) BPMA, a Government Agency given task by the Government of Indonesia c.q. the Minister of Energy and Mineral
Resources (“MEMR”) to conduct management of upstream oil and gas business activity in the authorities of Aceh area
INDONESIA PSC
Indonesia is currently implementing two contract schemes namely Cost Recovery and Gross Split PSC,
each with its advantages, providing flexibility in contract selection.

Cost Recovery PSC

▪ Fixed profit split at the beginning of contract, the TAX FACILITIES


split normally vary for each area Related regulation for this incentives and
▪ FTP deducted after gross production, shared tax facilities for Cost Recovery PSC is
between contractor and state accordance to Government Regulation
▪ Operating cost deducted after FTP No. 79/2010, as amended by
▪ Need work program & budget authorization Government Regulation No. 27/2017 and
Minister of Finance Regulation No.
▪ Tax facilities : land & building tax reduction, VAT
exemption during exploration period, import duties 122/PMK.03/2019 (PMK 122/2019).
▪ Other incentives: investment credit, DMO fee
holiday, accelerated depreciation

Gross Split PSC

▪ Base split at the beginning of contract, Contractors TAX FACILITIES


split for oil is 43% and 48% for gas (before tax) Related regulation for this
▪ At POD, additional variable split will be given to incentives and tax facilities is
contractor based on actual condition (working area accordance to Government
status, field location, reservoir depth, supporting Regulation No. 53/2017 and
facilities availability, reservoir type, reservoir depth, Minister of Finance Regulation
CO2 & H2S content, HC API gravity, local content, No. 67/PMK.03/2020 (PMK
production phase, oil & gas price and cumulative 67/2020)
production)
▪ Operating cost included in the contractor’s split
▪ No need budgetary authorization
▪ Self procurement process
▪ Tax incentives: land & building tax reduction, vat
exemption during exploration period, import duty
▪ Other incentives: additional split based on economic
TERMS AND CONDITIONS

1) and 2) For Exploration Working Area, relinquishment and firm commitment’s during 3 contract years
Direct Proposal Direct Proposal without Joint Study Reguler Tender
JABUNG TENGAH – Direct Proposal
PETROLEUM SYSTEM
This Working Area is covering approximately 8,728.34 sq km.
The Jabung Tengah area is located in onshore & offshore Jambi, Source Rock
Riau and Riau Islands province of South Sumatera Basin.
consists of Lemat (SUN) Formation
(type I Lacustrine SR), LTAF & UTAF
Formation (type II & III Terrestrial origin
SR) and Baturaja Formation potential
(type II Marine setting).

Reservoir
Fractured Pre-Tertiary Basement,
(Lemat/Lahat) sandstones, LTAF-UTAF
sandsrones, (BRF) carbonate, Gumai
(GUF) and Air Benakat (ABF)
sandstones. All these plays have been
proven productive in adjacent area as
well as in the South Sumatra Basin.

Seal
GUF potential as regional top seal for
older plays has been proven in Jabung
areas and most of South Sumatra Basin.
Leads, prospect and potential inventory Trap
Most of the fields in South Sumatra Basin are
structural play either as four-way or three-
way fault bounded closures.

Infra Structure Surounding


SANGKAR – Direct Proposal
PETROLEUM SYSTEM
This Working Area is covering approximately 8,122.82 sq km.
The Sangkar area is located in onshore & offshore East Java and Central Source Rock
Java province of East Java Basin. Source rock candidates in Sangkar
area are equivalent to the Lower
Ngimbang Formation, Upper
Ngimbang Formation and Kujung III
Formation.

Reservoir
Fluvial, transitional, to shallow
marine facies that were formed in
Early Oligocene to Pliocene.
Sandstone in shallow marine facies
is vary between 4% - 24%.
Carbonate reservoirs have porosity
from 3.2% - 29.3% for Early Miocene
Carbonate and 2.7% - 23% porosity
for Middle Oligocene Carbonate
reservoirs.

Seal Trap
seal in Sangkar area consists of Late Miocene Several other trap models in the North East Java
intraformation seal, Miocene intraformation seal, Basin are: three-way dip closure, four-way dip
Early Miocene intraformation seal, and Oligocene closure, fault bounded anticline, and carbonate bulid-
intraformation seal up. And there are also other trap models such as
biogenic gas.
Distribution leads and prospects in the Sangkar Area
Infra Structure Surounding
BUNGA – Direct Proposal
This Working Area is covering approximately 8,500 sq km. PETROLEUM SYSTEM
The Bunga area is located in offshore East Java province of
East Java Basin. Source Rock
Paleocene, Mid Eocene and Mesozoic
Play Concept
Reservoir
Paleocene synrift, Mid-Eocene Clastic,
Buildup Carbonate Eo-Oligocene, Pre
Tertiary Fracture and Pre-Tertiary
Calastic

Seal
Claystone from Late Eocene or Late
Miocene

Trap
Inverted Structure, Gentle anticlinal
trap, Sakala-sepandang Highs, Inverted
Southern Paleogene Graben, Mesozoic
Map of lead distribution Basement and Neogene Stratigraphic
trap.

Infrastructure Surounding
PERI MAHAKAM – Direct Proposal
PETROLEUM SYSTEM
This Working Area is covering approximately 7,415.22 sq km.
The Peri Mahakam area is located in onshore & offshore East Source Rock
Kalimantan province of Kutai Basin.
The source rock of the Peri Mahakam
Play Concept area contains type III and type II/III
kerogen which generated gas and a
mixture of oil and gas (Upper Oligocene
– Miocene)

Reservoir
Associated with fluvio-deltaic, shallow
marine to deep marine facies that were
formed in the Early Miocene to Pliocene
along the deltaic progradation system.

Seal
Seals are mostly shallow marine to deep
marine shale formed along the Early
Miocene to Late Pliocene in the delta
Distribution of Closure
progradation system.
Trap
Most of the traps began to form in the early
Middle Miocene due to tectonic gravity sliding in
the western part of the Mahakam area

Infrastructure Surounding
PAUS – Direct Proposal without Joint Study
This Working Area is covering approximately 8,214 sq km. PETROLEUM SYSTEM
The Paus area is located in offshore of East Natua Basin.
Source Rock
Play Concept Coals within the fluvial and coastal plain
deposits of the lower Arang and upper
Gabus Formations are considered to be the
primary source rock for the area.

Reservoir
The Terumbu carbonates 100 km the north
of the Paus block has high quality
reservoirs. However, sandstones within
the Muda formation are shown to have
excellent reservoir characteristics also with
porosities ranging from 25 to 35% and
permeability’s from 4 to 85mD.

Seal
In the Paus area the prospective sands of the
Pliocene section appear intercalated with shales
that can be very thick and provide an effective
seal

Trap
Lead Inventory Structure and stratigraphic

Infra Structure Surounding


BOSE – Reguler Tender PETROLEUM SYSTEM

This Working Area is covering approximately 8.738,83 Km2. The Source Rock
Bose area is located in Onshore & Offshore East Nusa Tenggara Those 2 source rocks are known as
Province which is an extension of basin in Northwest Shelf Australia. Mount Goodwin Formation of Early
Triassic (Tatarian-Ladinian) deposited in
Play Concept shallow-deep marine environment and
Aitutu Formation of Late Triassic-Early
Jurassic (Ladinian-Toarcian) deposited in
fluvio-marine environment.

Reservoir
Reservoir potentials in both areas are in
Mesozoic interval, divided into Triassic
and Jurassic Interval.

Seal
Early Cretaceous sediment of radiolarite
shale up to Late Cretaceous sediment
and Another interval in offshore area
considered as regional seal is Paleocene
sediment consist of marl intercalated by
Leads inventory in Bose Block shale that is equivalent to Johnson
Formation. Intraformational seal can also
be effective since shaly facies developed
inside Triassic-Jurassic interval, especially
Middle Jurassic-Late Jurassic.

Trap
Triassic Shallow Marine Sandstone and
Jurassic Fluvial Deltaic on faulted, Triassic
Shallow marginal Marine Sandstone on
Drape Horst, Jurassic Sandstone Sub-
Thrust and Mio Pliocene Carbonate
Build-Up.
Electicity Infrastructure
Accessing Bid Document shall be made during the allocated duration for each Tender Mechanism
Registering your company is mandatory in https://esdm.go.id/wkmigas

Payment
Documents
Preparation
Registration

DOCUMENTS TO BE PREPARED
▪ NPWP (domestic company) or Tax Payer ID (overseas company)
▪ Company Director’s ID
▪ Notarial Deed, Article of Incorporation
▪ Company Profile
Validation
▪ Email (will be used as user)
▪ Phone number

Sign In

Access Bid
Access Data
Document
Package

▪ One (1) Bid Document corresponds to one (1) working area, must be purchased individually
by company. Payment of the Bid Document in the amount of USD 5,000 per Bid Document
shall be made in advance.

▪ In accordance to the regulation concerning NonTax State Revenue deposit, payment of Bid
Document will be handled in SIMPONI account (Ministry of Finance’s account). Guidance
for creating Billing Code, invoice, channel of payment (ie: internet banking, bank teller,
ATM, EDC, mobile banking etc) will be detailed in the https://esdm.go.id/wkmigas.
▪ You may check if your bank is registered to our system as state revenue collector agent
service provider in https://penerimaan-negara.info (in Indonesian). Follow the instruction
to proceed payment after have the “Billing Code”. (will be vary depend on the bank’s
system).
Bidder can access data, which shall be
used for technical evaluation of the
For every bidder which has purchased exploration/exploitation work program.
the Bid Document, the Data Package is
free of charge with conditions applies Data Package consists of geological &
1. Did not win the Working Area; or geophysical data and outside which are
2. Does not continue to participate in directly related to the Working Area.
the bidding If the bidder wins the
Working Area, the bidder shall pay
the Data Package

Instead of Data Package accessing for The Data Package shall be access at:
each Working Area, company may
register for membership in MDR Pusat Data dan Teknologi Informasi ESDM
(Migas Data Repository), these (PUSDATIN ESDM)
Pertamina Upstream Data Center
registration valid for one year exclusive
(PUDC)
access to Indonesia G&G data library. Taman Tekno, BSD
Komplek Pergudangan Taman Tekno
Bidder which has registered as a MDR’s Blok G2/1, Serpong
member is not obligated to access bid Tangerang Selatan 15314
Data Package. Telp. +62-21-75882510
Fax. +62-21-75882511
Email: pudc.tamantekno@pertamina.com
With regard to the Minister of Energy
and Mineral Resources Regulation
No.1/2022, PSC’s contractors are
mandatory to register for MDR’s
membership.
FOR FURTHER INFORMATION,
PLEASE CONTACT :

DIRECTORATE GENERAL OF OIL AND GAS


MINISTRY OF ENERGY AND MINERAL RESOURCES

SECRETARIAT OF TENDER COMMITTEE/


EVALUATION COMMITTEE

IBNU SUTOWO BUILDING, 8th Floor


H.R. Rasuna Said Str, Block B-
5, Jakarta 12910, Indonesia
Phone. +62-21-5268910 ext. 132,
Fax. +62-21-5268963
Email: dmew.konvensional@esdm.go.id

www.migas.esdm.go.i Halo Migas Ditjen Halo Migas Ditjen


d Migas Migas

You might also like