You are on page 1of 3
epfjsa To: JV of YDA ingaat Sanayi ve Ticaret Anonim Sirketi & Ardem Yapi Gayrimenkul Ingaat ‘Taahbiit Akar. Mad. Tic. A.S. Attention: Mr, Volkan KARAKAS Copy: UNITED WATER SUPPLY COMPANY OF GEORGIA 5 Ana Politkovskaia St. 0189 TBILISI, Georgia Attention: Mr. Aleksandre Tevdoradze — Director Date: 24/07/2023 Ref:323/D712/B450/24-07-2023 PROJECT: Khashuri Water Supply and Sanitation Project CONSULTANT CONTRACT No: UWSCG-IPC-QCBS-CS WORKS CONTACT No: UWSCG-IPC-CW-Lot 1 for “Upgrade of Water Supply and ‘Sewerage Systems in Khashuri” SUBJECT: Method Statement for Water Network Construction Rev.01 REFERENCE: Contractor's letter 2023/KSHR/102 dated 17 June 2023 Dear Sir, With reference to the ref letter under which we received the Method Statement for Water Network Construction Rev.01, we would advise that while we have no objection to the submission in principle, we would like to draw your attention to the following points: 1,_In the Site Investigation section, although it states that "Special attention will be paid to avoid damaging existing infrastructure facilities," there is no mention of the “trial pit" method in the Technical Specification - Trench Excavation ~ Sub-Clause No: 3.1 2, In the Method Statement Sub-Clause No:5.11, it is mentioned that "the compaction level should reach 90%." It should also be clarified that this figure indicates the soil being compacted up to 90% of its ‘maximum dry density’ as determined in the standard Proctor test. 3. The MS provides information on how to cut asphalt in asphalt-paved streets but lacks sufficient details on how the restoration will be carried out after the pipe laying work is ‘completed. ‘Taking the above-mentioned points into consideration, your submittal is given the status “NO OBJECTION SUBJECT TO COMMENTS”. Please be advised that, Engineer’s “No Objection” is an indication of general compliance with Contract requirements and does not relieve the Contractor from any responsibility concerning the requirements stipulated or implied by the contract documents and the Georgian Law and / Emilio Mufioz 35-37 28037 Madrid / Spain. Tel: #34 915 949 500; Fax: #34 914 465 546 (02 Gamrekeli St - 0194 Thilisi / Georgia, Tel:+995 2313129; Fax: +995 2313128 epfjsa regulations on Health and Safety and on Environmental Protection and related policies and procedures shall be followed. cc: Mr. Guga Kakabadze - Deputy Director, UWSCG Ms. Irina Chikhladze - Head of the Project Management Department, UWSCG Ms. Tamar Chelidze - Head of Reporting Unit, UWSCG Ms. Eka Murjikneli - Design Specialist, UWSCG Ms. Maka Goderdzishvili ~ Head of Permits, Environment Protection and Social Affairs Department, UWSCG Mr. Nodar Rostomashvili - Project Manager, UWSCG Ms. Rusudan Gogia ~ Assistant Project Manager, UWSCG Mr. Konstantinos Deligiannis - Team Leader, Engineer's Representative, EPTISA s686 8 SAN (C/ Emilio Mufioz 35-37 - 28037 Madrid / Spain. Tel: #34 915 949 500; Fax: +24 914 465 546 (02 Gamrekeli St - 0194 Tbilisi / Georgia. Tel:+995 2313129; Fox: +995 2313128 Saeaan seems REVIEW OF a cctumumronmscom | CONTRACTOR'S DOCUMENTS | ©P & so THE EMPLOYER THE ENGINEER ‘THE CONTRACTOR ‘UNITED WATER SUPPLY ERTSA YDARARDEMIOINT COMPANY OF GEORGIA LL ‘VENTURE cuwsco) “This Review deals wih the following package of Contractor's documents ‘The Submission of Method Statement for Water Network Construction submitted with Contractors letter No-2023/KSHR/102 dated 17 June 2023, Result of Review: “ok Box as applicable (a) No Otjection (8) No Objection subject to comments below (© Failure to comply with Specification for reasons given below (@ Contents of package are in errr o ae insufficient to enable an adequate review ‘Comments as (5), (6 or (@) a8 applicable Engineer has reviewed the submission in question prepared in accordance with the Technical Specification Section ‘02210 Sub- Cause: 6 and FIDIC General Conditions of Contraet Sub-Clause No.1 In consequence of our review, we would advise some ‘comments a follows: ‘+ Inthe Site Investigation section, although it states that "Special attention wil be paid to avoid damaging existing ingfastructure facto.” there is no mention of the "trial pit" method in the Technical Specification - Trench Excavation ‘Sub-Clause No: 3.1 ‘© Inthe Method Statement Sub-Clause No:5.11. itis mentioned that "the compaction level should reach 909." It should alo be clarified that this figure indiates the soi! being compacted up to 50% of its maximum dry density’ as determined in the standard Proctor test. ‘+ TheMS provides information on how to cut asphalt in asphalt paved streets but lacks sulisient details on how the restoration will be carried out after the pipe laying work i completed Signed. Date 24/07/2023,

You might also like