PROPOSED RENEWAL DEVELOPMENT FOR MS OLAJUMOKE OLAYINKA ADETOLA


PILLING WORK N K
1.01 Allow for mobilization to site and Item 450,000 00
removing from site all necessary
plant e.t.c
1.02 Setting out of pilling point and 73 No 15,000 1,095,000 00
positioning of rig at pilling point
1.03 Drilling and installation of 73 No, 1022 M 12,000 12,264,000 00
400mm diameter bentonite bore
pile to 14.00m depth below
existing ground, including
reinforcement
1.04 Reinforcement 16mm diameter 9.68 Tn 550,000 8,167,500 00
bar
1.05 10mm ditto in link 5.17 Tn
1.06 Reinforced in situ concrete in pile 164 M3 40,500 6,642,000 00
1.07 Allow for pile load test Item 500,000 00
1.08 Allow for carrying out integrity test Item 150,000 00
on pile
N29,268,500 00

PILLING WORK
TO SUMMARY

PILE CAP N K
1.01 Reinforced concrete 1:2:4 129 M3 40,500 5,224,500 00
19mm aggregate in pile cap
1.02 Reinforcement bar 16.77 Tn 475,000 7,965,750 00
1.03 Plain concrete blinding bed 4 M3 37,000 148,000 00
1.04 Sawn form work to pile 406 M2 2,500 1,015,000 00
N14,353,250 00