Professional Documents
Culture Documents
Laporan Arus Kas Wamena
Laporan Arus Kas Wamena
168 Qomar By beli Kompor, Kuali, dandang, loyang, 1 Lusin sendok mkn, 1 lusin garpu, 1 Pack Binder clip, 1 Pack Polpen,
1/2 LusinMangkok, terminal, pisau, sendok goreng, serbet, baskom, 2 ember Kantor 1,145,000.00 19,060,231.00
Pindah ke Lembar No.6 228,438,231.00 209,378,000.00 19,060,231.00
LAPORAN ARUS KAS LEMBAR NO.
PT CENDERAWASIH MAS WAMENA
6
NO TGL NAMA KETERANGAN PROJECT DEBET KREDIT SALDO
Pindahan dari Lembar No.5 228,438,231.00 209,378,000.00 19,060,231.00
169 14 Mar'14 Qomar By beli Jabar Wood Putih, 3 bh Les Pelafon@55.000,-, 30 Biji Paku Beton 5, Mata Gergaji Besi, Martellu Kantor 460,000.00 18,600,231.00
170 Qomar 3 bh Spidol WB@10.000, 3 bh Stabillo@10.000, 20 Lbr Map Diamond@4.000, 10 lbr Map biasa@1.000, 5 Bh
Map Plastik@8.000, Spidol 12W, Box File Kantor 240,000.00 18,360,231.00
171 16 Mar'14 Qomar By isi ulang 7 Galon Air Periode 10-16 Maret 2014 Kantor 105,000.00 18,255,231.00
172 Jhon FR By Bama Utk Eragayam Per 17-23 Maret 2014 Eragayam 1,500,000.00 16,755,231.00
173 Jhon FR By Bama Utk Wollo Per 17-23 Maret 2014 Wollo 2,000,000.00 14,755,231.00
174 Jhon FR By Cek Komputer utk Ford Ranger Kantor 300,000.00 14,455,231.00
175 Jhon FR By Pembelian Terpal 3x4 Kantor 150,000.00 14,305,231.00
176 Jhon FR By Pembelian Kwitansi, 2 Bh Ballpoint Balliner@18.000, 5 Lbr kertas bergaris@1.000 Kantor 51,000.00 14,254,231.00
177 Charles By Uang makan Pelaksana a/n Charles Manurung per 06-31 Mar'14 Kantor 1,300,000.00 12,954,231.00
178 Sius By Upah tenaga harian Mobilisasi alat ke Wollo (2hari) tgl 04-05 Mar'14@500.000 Wollo 1,000,000.00 11,954,231.00
179 Wariko By Upah tenaga harian Mobilisasi alat ke Wollo (2hari) tgl 04-05 Mar'14@500.000 Wollo 1,000,000.00 10,954,231.00
180 Erlos By Upah tenaga harian Mobilisasi alat ke Wollo (2hari) tgl 04-05 Mar'14@500.000 Wollo 1,000,000.00 9,954,231.00
181 Yakob By Upah tenaga harian Mobilisasi alat ke Wollo (2hari) tgl 04-05 Mar'14@500.000 Wollo 1,000,000.00 8,954,231.00
182 Tinus By Upah tenaga harian Mobilisasi alat ke Wollo (2hari) tgl 04-05 Mar'14@500.000 Wollo 1,000,000.00 7,954,231.00
183 Aritonang By Operasional a/n Dompak Aritonang Per 10-15 Mar'14 Kantor 1,200,000.00 6,754,231.00
184 Qomar By Pembelian Baut Solar utk Filter Dozer Eragayam 50,000.00 6,704,231.00
185 17 Mar'14 Jayapura Panjar RAP Eragayam Eragayam 100,000,000.00 106,704,231.00
186 Jayapura panjar RAP Wollo Wollo 100,000,000.00 206,704,231.00
186 Qomar By pembelian 20 Ltr Bensin @22.000 utk Jembatan Wollo Wollo 440,000.00 206,264,231.00
187 Qomar By Pembelian 2 Klg Cat Inalux k@25.000, 2 Kg Paku Jembatan @ 35.000, 2 bh Kuas Tangan @5.000, 1 btl mesr Wollo 185,000.00 206,079,231.00
188 Qomar By Pembelian Phylox hitam Wollo 40,000.00 206,039,231.00
189 Qomar By Pembelian 5 Ltr Oli Kotor @ 4.000 Utk Jembatan Wollo Wollo 20,000.00 206,019,231.00
190 Qomar By Pembelian Jerigen 20 Ltr Utk Jembatan Wollo Wollo 120,000.00 205,899,231.00
191 Parera Bantuan utk Pak Hans (Opname) Kantor 1,000,000.00 204,899,231.00
192 Qomar By Pembelian 1 Slop Rokok Surya utk jembatan Wollo Wollo 150,000.00 204,749,231.00
193 Qomar By Pembelian 1 Ember Gemuk Kyodogosi Wollo 1,700,000.00 203,049,231.00
194 Jhon FR By Pembelian 5 Buah Materai 6.000 @10.000,- Kantor 50,000.00 202,999,231.00
195 Warek By Harian Operator 18 hr@100.000 dan lembur 11 jam@10.000 Kantor 1,910,000.00 201,089,231.00
196 Parman By Sewa truk utk angkut BBM ke Wollo Wollo 500,000.00 200,589,231.00
197 Berto By Kas Bon Wollo 500,000.00 200,089,231.00
198 Eko By Pemasangan Patok Wollo 50,000.00 200,039,231.00
199 Jhoni s. By Lembur 65 jam@10.000,- Kantor 650,000.00 199,389,231.00
200 Sadrak By Harian Operator 9 hr@100.000 dan lembur 25 jam@10.000 Wollo 1,150,000.00 198,239,231.00
Pindah ke Lembar No.7 428,438,231.00 230,199,000.00 198,239,231.00
LAPORAN ARUS KAS LEMBAR NO.
PT CENDERAWASIH MAS WAMENA
7
NO TGL NAMA KETERANGAN PROJECT DEBET KREDIT SALDO
Pindahan dari Lembar No.6 428,438,231.00 230,199,000.00 198,239,231.00
201 18 Mar'14 Simeon By Honor bulan Februari 2014 a/n Simeon Wollo 1,500,000.00 196,739,231.00
202 Ferdy By Honor bulan Februari 2014 a/n Ferdy Wollo 1,500,000.00 195,239,231.00
203 Yohana By Honor bulan Februari 2014 a/n Yohana Wollo 1,500,000.00 193,739,231.00
204 Hotman By Pembelian 6 bh materai 6.000@7.000,- Kantor 42,000.00 193,697,231.00
205 Hotman By Transport Pembelian Materai Kantor 20,000.00 193,677,231.00
206 Qomar By Pemebelian Hekter Wollo 15,000.00 193,662,231.00
207 Emaus By Honor bulan Februari 2014 a/n Emaus Wollo 2,000,000.00 191,662,231.00
208 19 Mar'14 Takim By Honor bulan Februari 2014 a/n Takim Wollo 1,500,000.00 190,162,231.00
209 Qomar By Pembelian Map dan Fotocopy Kantor 25,000.00 190,137,231.00
210 Jhon FR By Pembelian Baut 2 Mur dan Ongkos utk Mobil Ford Ranger Kantor 100,000.00 190,037,231.00
211 Jhon FR By Cuci Mobil Kantor 85,000.00 189,952,231.00
212 Qomar By Pembelian Baut Solar utk Filter Dozer Eragayam 50,000.00 189,902,231.00
213 20 Mar'14 Qomar By Tambah Angin mobil rental Kantor 10,000.00 189,892,231.00
214 Qomar By pembelian 1 botol Betadine Kantor 15,000.00 189,877,231.00
Bukit By Panjar Pekerjaan Jembatan (Uang bensin + transport a/n Pelmanus) Wollo 500,000.00 189,377,231.00
215 21 Mar'14 Pelmanus Panjar Pekerjaan Jembatan Wollo 4,000,000.00 185,377,231.00
216 Jhon FR Tambal Ban Mobil Kantor 35,000.00 185,342,231.00
217 Qomar By Pembelian Pulsa Listrik Kantor Kantor 105,000.00 185,237,231.00
218
231
232
233
234
235 Saldo Per 21 Maret 2014 428,438,231.00 243,201,000.00 185,237,231.00
215
216
217
218
231
232
233
234
235 Saldo Per 21 Maret 2014 428,438,231.00 280,645,000.00 147,793,231.00
Wamena, 21 Maret 2014