College of Engineering and Technology (CoET)

Weekly Report No: ___1_ _from__24_ JULY_2023_to_28_JULY_ 2023_

Day Brief description of work performed Hours


Inspection of air conditions at NSSF office TANGA 6
Monday

Inspection of air conditions at MSD Pongwe 7


Tuesday

Maintenance and repair of wiring system at District Commissioners 8


Wednesday house

Maintanance and service of air conditions at TRA office 6


Thursday

Report writing on the inspection of an Air conditioner (AC) at TRA 7


Friday Office

Report Writing
Saturday

Total hrs 34

Sequence of operations for main job


No Operation Tools, Machinery, Equipment
On the maintenance of Air Condition (AC): -  Tester
 First, we open the case of outdoor unit and
wash the fans of the condenser by using
water and brush vertically.

 Second, we open the case of indoor unit  Screw driver


and poor some water to check if there is
any blockage in the drainage system.

 If there is a blockage on the drainage  Star and Flat


system, then we blow on outward side of
the drainage pipe to remove muddy
 We remove dust on the blower by using  Brush
water and brush.

Signature Training Officer Date


Details of main job

Drawn Date Name Checked Date Name