Weekly Report No: ___3___from__7 AUGUST__2023___to__11 _AUGUST___2023__

Day Brief description of work performed Hours


Learning about outdoor unit of Air condition (AC). 5
Monday

NANENANE DAY
Tuesday

Inspection of Air conditions at Medical Store Department (MSD) Tanga 5


Wednesday

Maintenance of Air Conditions (AC) at MSD Tanga. 7


Thursday

Writing report on the inspection of air conditions (AC) at NSSF office 5


Friday in
Tanga

Report Writing
Saturday

Total hrs 22

Sequence of operations for main job


No Operation Tools, Machinery, Equipment
On the maintenance of Air Condition (AC): -  Tester
 First, we open the case of outdoor unit and  Screw driver
wash the fins of the condenser by using  Brush
water and brush vertically.

 Second, we open the case of indoor unit


and poor some water to check if there is
any blockage in the drainage system

 If there is a blockage on the drainage


system, then we blow on outward side of
the drainage pipe to remove muddy

 We remove dust on the blower by using


water and brush