The weekly report summarizes work performed from July 31st to August 4th by the College of Engineering and Technology. It includes 5 days of inspections and maintenance of electrical wiring systems and air conditioners at the Tanzania Intelligence and Security Service Office and TRA office in Tanga. A total of 29 hours were spent performing tasks like inspecting wiring, writing reports, maintenance, and servicing air conditioners. The report also outlines the sequence of operations for maintaining wiring systems which involves checking for power supply, replacing faulty components, and repairing short circuits.
The weekly report summarizes work performed from July 31st to August 4th by the College of Engineering and Technology. It includes 5 days of inspections and maintenance of electrical wiring systems and air conditioners at the Tanzania Intelligence and Security Service Office and TRA office in Tanga. A total of 29 hours were spent performing tasks like inspecting wiring, writing reports, maintenance, and servicing air conditioners. The report also outlines the sequence of operations for maintaining wiring systems which involves checking for power supply, replacing faulty components, and repairing short circuits.
The weekly report summarizes work performed from July 31st to August 4th by the College of Engineering and Technology. It includes 5 days of inspections and maintenance of electrical wiring systems and air conditioners at the Tanzania Intelligence and Security Service Office and TRA office in Tanga. A total of 29 hours were spent performing tasks like inspecting wiring, writing reports, maintenance, and servicing air conditioners. The report also outlines the sequence of operations for maintaining wiring systems which involves checking for power supply, replacing faulty components, and repairing short circuits.
To inspect an electrical wiring system of Tanzania Intelligence and 5 Monday Security Service Office
To write report on the inspection of electrical wiring system of Tanzania 5
Tuesday Intelligence and Security Service Office
Maintanance of electrical wiring system of Tanzania Intelligence and 7
Wednesday Security Service office
Inspection of Air Conditioner (AC) at TRA office TANGA 6
Thursday
Maintanance and service of Air Conditioner (AC) at TRA office 6
Friday TANGA
Report Writing Saturday
Total hrs 29
Sequence of operations for main job
No Operation Tools, Machinery, Equipment On the maintenance of the wiring system:- Tester First, we check if power supply can reach the electric components such as lamps.
If the power supply reaches the component Digital Multimeter
but it does not operate then we replace it with a new one.
If not then we open the switch to check for Screw driver