Dust Bag Cleaning Schedule

Note : The number highlighted correspond to the day of the month the Preventive Maintenance shedule will be conducted.
Preventive Maintenance will be done depending on the availability from production and/or in night shift.
Maintenance Plan / 2023 Year 2024
Machine Sections
In-charge Actual DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Sanding Machine Plan 05 10 06 05 15 06 03 08 05 02 07 11 09
OSP CYS RL/RP/TD/JP
Compact SB 75 #1 Actual
Sanding Machine Plan 06 11 07 06 16 07 04 09 06 03 08 12 10
OSP CYS RL/RP/TD/JP
Compact SB 75 #2 Actual
Sanding Machine Plan 07 12 08 07 17 08 05 10 07 04 09 13 11
OSP CYS RL/RP/TD/JP
Compact SB 75 #3 Actual
Sanding Machine Plan 08 13 09 08 18 09 06 11 08 05 10 14 12
OSP CYS RL/RP/TD/JP
Compact SB 75 #4 Actual
HARDOO Sanding Plan 09 15 10 09 19 10 07 12 09 06 11 15 13
WPB RL/RP/TD/JP
Machine 1 Actual
HARDOO Sanding Sanding Plan 11 16 12 11 20 11 08 13 10 07 12 16 14
RL/RP/TD/JP
Machine 2 Room Actual
Bottom Sanding Machine Plan 16 14
Spray Room RL/RP/TD/JP
Dust Collector Actual
OSP
OSP Sanding Machines Plan 23 21
Material RL/RP/TD/JP
Dust Collector Actual
Room
OSP
CADCAM Finishing Dust Plan 30 28
Material RL/RP/TD/JP
Collector Actual
Room
CADCAM
Plan 20 24
OSP SB 85 Dust Collector Milling RL/RP/TD/JP
Room Actual
OSP - Sprint Sanding Plan 27 31
Sprint BLdg RL/RP/TD/JP
Machine Dust Collector Actual
Prepared By: Checked & Noted By:

Jan Michael M. Lanete Ma'am Glen Claire Gabuan


Maintenance Supervisor / TS Operations Manager of CYS-PH