Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. PANGASINAN ist DISTRICT ENGINEERING OFFICE REGIONAL OFFICE 1 tor ‘Alaminos City, Pangasinan LHe VLU 40a. July 10, 2023 MARIA DORICA NAZ-HIPE CESE pxnHETAL SAGA ERA REO Regional Director eco Ua se DENR-Environmental Management Bureau PD E CEIVE, Region 1 f K, OT -[2 PU ‘San Fernando City, La Union tS 5 Te et” ‘Subject: Request for Extension of ECC Validity Madam: This is in connection with our on-going project, Construction/Improvement of Access Road leading to Lucap Boulevard and Mangrove Park at Brgy. Bued, Alaminos City, Pangasinan with ECC No. ECC-OL-RO1-2019-0124 that will expire on December 31, 2023. This office would like to request for an amendment and extension of its validity date. Attached herewith the copy of approved ECC and other supporting documents for your reference. Thank you for your appropriate action. Very truly yours, vals District Engineer rousifctl ph Republic ofthe Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ILE PANGASINAN ist fae DISTRICT ENGINEERING OFFICE ist REGIONAL OFFICE 1 ‘laminas City, Pangasinan July 10, 2023 MARIA DORICA NAZ-HIPE CESE Regional Director DENR-Environmental Management Bureau Region I San Fernando City, La Union Subject: Request for Extension of ECC Validity Madam: This is in connection with our on-going project, Construction/Improvement of EW 4. Access Road leading to Lucap Boulevard and Mangrove Park at Bray. Bued, Alaminos City, Pangasinan with ECC No. ECC-OL-RO1-2019-0124 that will expire on December 31, 2023. This office would like to request for an amendment and extension of its validity date. Attached herewith the copy of approved ECC and other supporting documents for your reference. Thank you for your appropriate action. Very truly yours, wana fe, District Engineer vorisifoste. (~ Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. PANGASINAN ist DISTRICT ENGINEERING OFFICE REGIONAL OFFICE 1 Alaminos Cty, Pangasinan CERTIFICATION This is to certify that the Construction/Improvement of Access Road leading to Lucap Boulevard and Mangrove Park at Brgy. Bued, Alaminos City, Pangasinan is enrolled in our Multi-Year Project Program (MYPP). This also certifies that this Agency (DPWH) is capable of completing the project without any financial constraints based on the scheduled year of completion. MAI B. OZA, District Engin roused. Republic ofthe Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. PANGASINAN ist DISTRICT ENGINEERING OFFICE REGIONAL OFFICE 1 ‘Aleminos City, Pangasinan CERTIFICATION This is to certify that the Construction/Improvement of Access Road leading to Lucap Boulevard and Mangrove Park at Bray. Bued, Alaminos City, Pangasinan is enrolled in our Multi-Year Project Program (MYPP). This also certifies that this Agency (DPWH) is capable of completing the project without any financial constraints based on the scheduled year of completion. mand tons District Engineer worse. 0 w ‘SWORN ACCOUNTABILITY STATEMENT 1, Engr. Marieta B. Mendoza, District Engineer, representing DPWH Pangasinan 1* District Engineering Office with office address located in Pandayan Street, Poblacion, Alaminos City, Pangasinan takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC) Engr Mark fenlloza Signature ee TIN Subscribed and sworn before me this _[\f ‘2023, the above-named affiant taking oath presenting , issued on at Notary Pubjic Doc. No. ee) 9 Page No. Book No, Series of 2 Environmental Compliance Certificate ‘CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan District Engineering Office SWORN ACCOUNTABILITY STATEMENT 1, Engr. Marieta B. Mendoza, District Engineer, representing DPWH Pangasinan 1* District Engineering Office with office address located in Pandayan Street, Poblacion, ‘Alaminos City, Pangasinan takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC). Notary Pui 29: ROB AAD Doc. No. arsy CIRt ACs Page No.7 AT oT any 2028 Book No. until eS 9797968 o Series of “2 punninos CNL Spst MI TIME No 088! eP WEEDING 3299 Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVEPARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan District Engineering Office << Republic of the Philippines s Department of Environment and Natural Resource ENVIRONMENTAL MANAGEMENT BUREAU — ——— Government Center, Brgy. Sevilla, San Femando City, La Union =— Telephone No4072) 607-377 Fax No (072) 700.2808 embdenri@yzhoa.com Visit us at http//satwrel.emb.goveh/ ENVIRONMENTAL COMPLIANCE CERTIFICATE (issued under Presidential Decree 1586) ECC-OL-R01-2019-0124 THIS IS TO CERTIFY THAT THE PROPONENT, DPWH Pangasinan 1* District Engineering Office, is granted this Environmental Compliance Certificate (ECC), for the proposed Construction of Access Road Leading to Lucap Boulevard and Mangrove Park project located in Brgy. Bued, Alaminos City, Pangasinan, by the Departmentof Environment and Natural Resources (DENR), through the Environmental Management Bureau (EMB). SUBJECT ONLY to the conditions and restrictions set in this ECC and in the attached document labelled as Annexes A and B. ‘This Certificate is issued with the following details: PROJECT DESCRIPTION The BCC covers the implementation of the 2 ~ Kilometer access road Project with relevant components/appurtenances consisting of embankment, slope protection, 40-linear meter Reinforced Concrete Deck Girder (RCDG) Bridge, and provision of guard rails, traffic signs, pavement markings and lightings. Certificate is issued in compliance with the requirements of Presidential Decree No. 1586, and in accordance with DENR Administrative Order (D.A.O.) No. 2003-30. Non-compliance with any of the provisions of this Certificate shall be a sufficient cause for the cancellation of this Certificate and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos (P50, 000.00) for every violation thereof without prejudice to imposition of fines and penalties under other environmental laws. The EMB, however, is not precluded from reevaluating and correcting any deficiencies or errors that may be found after issuance of this Certificate. Issued at EMB-RO1, Government Center, Brgy. Sevilla, San Fernando City this April 27, 2019. Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVEPARK Brgy. ued Alaminos, Pangasinan ‘DPWH, Pangasinan | District EngineeringOffice Recommending Approval: ENGR. NICANOR C. ESTEBAN OIC-Chief, Clearance & Permitting Division Approved: ENGR. MARIA Leda NAZ-HIPE, CESE Regional Director Environmental Compliance Certificate ‘CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan | District Engineering Office SWORN ACCOUNTABILITY STATEMENT 1, Engr. Marieta B. Mendoza, District Engineer, representing DPWH Pangasinan 1* District Engineering Office with office address located in Pandayan Street, Poblacion, Alaminos City, Pangasinan takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC). 2.9 APR tg Subscribed and sworn before me this #1, the above-named affiant taking oath presenting ued on. at : are RO WSISON blic Doc. No. __ $47 Page No. Book No, Series of _297 Environmental Compliance Certificate ‘CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVEPARK Bray. Bued Alaminos, Pangasinan oe DPWH, Pangasinan | District EngineeringOffice CanCIPag A ot I. CONDITIONS ENVIRONMENTAL MANAGEMENT All commitments, mitigating measures and monitoring requirements, contained in the Initial Environmental Examination Checklist (IEEC) Report for the proposed Road/Bridge Project, particularly in the Environmental Management Plan/ Environmental Monitoring Plan, including any modifications and/or additional information as approved by the EMB, shall be instituted to minimize any adverse impact of the project to the environment throughout its implementation, which shall include among others to wit: 1, Adequate and appropriate drainage system and soil erosion control measures including other structural measures which will conform to natural topography shall be constructed / provided to avoid erosion and flooding of the adjoining properties; 2. Any construction activities and/or changes in topography /surface landform as a result of the project implementation shall consider the recommendation of available Geological/Geo-hazard Site Assessment Report, otherwise the Proponent shall conduct its own geological assessment of the area which shall be duly reviewed by the Mines and Geosciences Bureau (MGB), and submit a report to EMB RO1 within thirty (30) days from completion of the study; 3. Strictly observe standard sanitary housekeeping practices, proper collection of solid and hazardous waste resulting from the implementation/operation of the project. The waste management plan shall include adequate facilities for disposal of wastes which shall be done from the start of the construction; 4. Implement proper management of the construction materials, debris, and excavated materials for each phase/stage of the project including appropriate stockpiling, disposal or reuse of materials. Spoils shall be brought to designated area away from drainage and runoff routes. All hauling trucks used for transporting aggregates and backfill materials should be fully covered; 5. Institute environment-friendly innovations to support wildlife conservation and protection specifically the establishment of a Conservation Program for the protection and preservation of mangroves, seagrass beds and coral reefs as part of its Corporate Social Responsibility; GENERAL CONDITIONS 6. The project proponent shall secure a valid Tree Cutting Permit issued by the DENR pursuant to the provisions of PD 705 and PD 953. In case trees will be cut during construction activities such as clearing and excavation works, the proponent shall plant appropriate tree species in accordance with the required replacement ratio and/or other forms of vegetation to compensate for the damaged vegetation per DENR Memorandum Order No. 2012-02; 7. The proponent shall undertake an effective and sustained Information, Education and Communication (IEC) Campaign to explain publicly its Environmental Compliance Certificate ‘CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVEPARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan |DistrictEngineering Office mitigating measures as well as the conditions of this ECC. It shall open ‘opportunities to educate the public especially the affected community, interested academic institutions and other parties on the environment and human health safety features of the project including mitigating measures on the effects of climate change; 8, The project operations shall comply with the provisions of RA 6969 (Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990), RA 8749 {Philippine Clean Air Act of 1999), RA 9003 (Ecological Solid Waste Management Act of 2000), and RA 9275 (Philippine Clean Water Act of 2004) and other relevant policies, rules and regulations; ° 9. An ECC Billboard (3’X 5’) shall be installed at a strategic location at the project site containing this message: “NOTICE TO THE PUBLIC, THIS [Project Name] of [Project Proponent] has been issued an Environmental Compliance Certificate [ECC Ref. No.] by the DENR-Environmental Management Bureau Region 1 on [Date of Issuance|;” 10. All works shall be implemented strictly according to schedule. Adequate signages on safety and traffic shall be installed and should be visible at all times in the Project site; 11. Parties and communities affected by the negative impacts of the project shall be appropriately compensated; 12. Proponent shall submit a Progress Report on the project implementation to this Office with proper documentation within fifteen (15) days after each quarter period; I RESTRICTIONS 13. No activities shall be undertaken other than what were stipulated in the IEEC. Any expansion of the project beyond the project description or any change in the activity or transfer of location shall be the subject of a new Environmental Impact Assessment; 14. This Certificate shalll be considered automatically revoked if the project has not commenced within five (5) years from the date of ECC issuance. The date of project implementation shall be the date of ground breaking, based on the Proponent's work plan as submitted to the EMB; and 15, This ECC shall be valid up to December 31, 2023 as per submitted IEE Checklist Report, and extension of its validity shall be secured from this office when it is necessary. Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND ‘MANGROVE PARK : Brgy. Bued Alaminos, Pangasinan X ‘DPWH, Pangasinan | District Engineering Office COREE IES A. Oi vate Annex B PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponentand the Government agencies concerned in the management of the Project and for better coordination in mitigation of the impacts of the Project on its surrounding areas and the environment, these recommendations are forwarded to the parties and authorities concerned for appropriate action. OTHER REGULATORY CONCERNED GOVERNMENT REQUIREMENTS / CONDITIONS AGENCIES /ENTITIES T. Compliance with the Sanitation | Department of Health (DOR) Code of the Philippines; 2. Compliance with the Labor Department of Labor and Code of the Philippines Employment (DOLE) - Bureau of working condition 3. Compliance with the Building | Local Government Unit (LGU) Code of the Philippines Concerned 4, Compliance with the Ecological | LGU Concerned Solid Waste Management Act 5. Secure tree cutting permit Department of Environment and Natural Resources (DENR) ENVIRONMENTAL PLANNING RECOMMENDATIONS FOR THE PROPONENT 6. Priority of employment shall be given to qualified local residents Adequate public information on jobs available to local residents in the affected areas shall be provided; N, [ t- ENGR. NICANOR C. ESTEBAN OIC-Chief, Clearance & Permitting Division ENGR. MARIA DORICA NAZ-HIPE, CESE Regional Director Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVEPARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan District Engineering Office f Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PANGASINAN 1ST DISTRICT ENGINEERING OFFICE REGIONAL OFFICE I ‘Aiaminos City, Pangasinan CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED ALAMINOS CITY, PANGASINAN STRAIGHT LINE DIAGRAM NET LENGTH: 2,150 meters Prepared by: Checked by: App . BAO-ET CONCEPCIQN A. CANULLAS OSCARS. BOTING 3R. Engiheer T Engineer IT Caretaker, Planning and Design Section ‘CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED ALAMINOS CITY, PANGASINAN Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PANGASINAN 1°" DISTRICT ENGINEERING OFFICE REGIONAL OFFICE 1 ‘Neminos City, Pangasinan Region Z BAGONG PILIPINAS. September 1, 2023 TE YAS OB 40473 MARIA DORICA NAZ-HIPE Regional Director DENR-Environmental Management Bureau Region I San Fernando City, La Union & 7023, a a BEPo % Madam: ‘Submitting herewith the additional requirements for the extension of ECC validity for the project Construction of Access Road leading to Lucap Boulevard and Mangrove Park Bray. Bued, Alaminos City which is valid until December 31, 2023. 1. Justification on the ECC extension 2. Potential Impacts to the nearest protected areas (EMMP) For your information and reference. Very truly yours, nant lyvogn District Engineer Bie Pops @ Website: www.dpwh.gov.ph & Tel. No(s).: (032) 436 2069 @ )- Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PANGASINAN 1°* DISTRICT ENGINEERING OFFICE ‘Alaminos City, Pangasinan BAGONG PILIPINAS. JUSTIFICATION ON THE ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) EXTENSION Construction of Access Road Leading to Lucap Blvd, and Mangrove Park Bray. Bued, Alaminos City, Pangasinan Based on the submitted attached original Multi-Year Project Profile (MYPP) of the said project, itwas programmed to be completed this calendar-year. But due to the limited funding releases for every programmed year, our office has to re-evaluate the targeted accomplishment of the fund that can be put in place to the project. In this way, we would be able to sum up the values needed for the programmed years until its completion. This is why, yearly we are updating our data in the MYPP. During the course of the project implementation, another problem that this office has to deal with is the pandemic crisis (Covid-19) which made the work progress in the project to a halt. The effects of this pandemic and the unstable prices of petroleum in the world market escalates the price increases of materials and as well as the operating expenses of the project. The original targets which was stated in the original MYPP. missed its goal and again the planned targets and funding has to be re-engineered with the existing prices. Since our applied ECC for this project will be expiring soon, our office has requested for the amendment for its continuance since a new funding plan (See Attached New MYPP) has already been put in place. Hoping these explanations has rendered justifications on our request for extension. Your support and understanding on this matter are highly appreciated © Website: www.dpwh.gov.ph ‘Co sos Tel. No(s).: (032) 436 2069 | $ ‘socorec Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PANGASINAN 15° DISTRICT ENGINEERING OFFICE ‘Alaminos City, Pangasinan BAGONG PILIPINAS JUSTIFICATION ON THE ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) EXTENSION Construction of Access Road Leading to Lucap Bivd, and Mangrove Park Bray. Bued, Alaminos City, Pangasinan Based on the submitted attached original Multi-Year Project Profile (MYPP) of the said project, it was programmed to be completed this calendar-year. But due to the limited funding releases for every programmed year, our office has to re-evaluate the targeted accomplishment of the fund that can be put in place to the project. In this way, we would be able to sum up the values needed for the programmed years until its completion. This is why, yearly we are updating our data in the MYPP. During the course of the project implementation, another problem that this office has to deal with is the pandemic crisis (Covid-19) which made the ‘work progress in the project to a halt. The effects of this pandemic and the unstable prices of petroleum in the world market escalates the price increases of materials and as well as the ‘operating expenses of the project. The original targets which was stated in the original MYPP missed its goal and again the planned targets and funding has to be re-engineered with the existing prices. Since our applied ECC for this project will be expiring soon, our office has requested forthe amendment forts continuance sme a new funding an (See Atached New MYPP) has already been put in place. Hoping these explanations has rendered justifications on our request for extension. Your support and understanding on this matter are highly appreciated a Website: wwnw.dpwh.gov.ph (@ som | Tel. No(s).: (032) 436 2069 | socorec Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PANGASINAN 1°' DISTRICT ENGINEERING OFFICE ‘Alaminos City, Pangasinan Region 1 POTENTIAL IMPACTS TO THE NEAREST PROTECTED AREA ‘The project construction which is now on its fith year of implementation is strategically located more or less 2km from the nearest island and the potential impact of human activities that might cause some damages on the Hundred Island Protected Area is far from happening because of the mitigating measures that were put in place in order not to inflict damages to the ecosystem surrounding the project. Below are the potential impacts with mitigating measures that this office has set up. POTENTIAL IMPACT Hl MITIGATING MEASURES | Dust emission from embankments Maintain @ misty access road and constant water sprinkling for a least 2- time a day or whenever necessary. | Noise pollution from delivery trucks, pile | Provide silencers for construction equipment driving equipment and road spreaders and | as much as possible when the site is close to | ‘compactors residential homes, apartments, and hotels. | Whenever possible work schedules of equipment should be done at daytime except ‘on special cases where time is of the essence | for the completion of the project. | Generation of spoils and organic garbage on | Since the method of construction was to | the dumped embankments conduct pile driving up to 50-100 m before any dumping of embankment takes place, the accumulation of inorganic and organic spoils on the water surface is contained and a crew of workers is designated to collect and properly dispose all of the collected | materials Potential siltation due to dumped|As mentioned in the construction embankments procedures, the construction of sheets piles ‘on both sides of the proposed road | alignment serves as the containment area of the embankment and the potential siltation | of the surrounding area of the project is very minimal compared to open dumping. | | © Website: wamw.dpwh.gov.ph (<) 83 Tel. No(s).: (032) 436 2069 socoree Republic of the Philippines DEPARTMENT OF PUBLIC PANGASINAN 1° DISTRICT ENGINEERING OFFICE ‘Alarinos City, Pangasinan Region 1 WORKS AND HIGHWAYS. POTENTIAL IMPACTS TO THE NEAREST PROTECTED AREA The project construction which is now on its fifth year of implementation is strategically located more or less 2km from the nearest island and the potential impact of human activities that might cause some damages on the Hundred Island Protected Area is far from happening because of the mitigating measures that were put in place in order not to inflict damages to the ecosystem surrounding the project. Below are the potential impacts with mitigating measures that this office has set up. POTENTIAL IMPACT MITIGATING MEASURES Dust emission from embankments Maintain a misty access road and constant water sprinkling for a least 2- time a day or whenever necessary. Noise pollution from delivery trucks, pile | driving equipment and road spreaders and | compactors Provide silencers for construction equipment ‘as much as possible when the site is close to residential homes, apartments, and hotels. Whenever possible work schedules of equipment should be done at daytime except on special cases where time is of the essence for the completion of the project. Generation of spoils and organic garbage on the dumped embankments Since the method of construction was to conduct pile driving up to 50-100 m before any dumping of embankment takes place, the accumulation of inorganic and organic a crew of workers is designated to collect and properly dispose all of the collected materials spoils on the water surface is contained and | Potential siltation due embankments to dumped \As mentioned in the construction’ procedures, the construction of sheets piles [on both sides of the proposed road | alignment serves as the containment area of the embankment and the potential siltation of the surrounding area of the project is very minimal compared to open dumping. © Website: www.dpwh.gov.ph Tel. No(s).: (032) 436 2069 @ ‘aa Potential Impacts to the nearest Protected Area: ‘The possible potential impacts of the project are due to dust from site preparation, noise pollution from delivery trucks and heavy equipment, generation of solid waste and hazardous materials, water degradation due to slope protection works but we have mitigating measures for these possible impacts during construction works so as not to create negative effect to ‘environment especially to the nearest protected area. Potential Impacts to the nearest Protected Area: The possible potential impacts of the project are due to dust from site preparation, noise Pollution from delivery trucks and heavy equipment, generation of solid waste and hazardous materials, water degradation due to slope protection works but we have mitigating measures for these possible impacts during construction works so as not to create negative effect to environment especially to the nearest protected area. Lucap Boulevard MULTI-YEAR PROJECT PROFILE FORM Tlcap foueers Construcon/Improvement of Access Road Leading to Declared Tourism Destinations Access Rood Leading to Lucap Boulevard and Mangroove Park, Bray Bued Alamines Cty, Pangasinan [Consincion of Road compete with Shouders, Sdewaks, Easy Access fr to Tourist Coming from the Lucap Wharf Gong Reiings, Sone and Shore Protect, Street Ughting, Toursts through the Alaminos Mangroove Park Facies and Trafic Safety Deves JRoad: [Construction of Concrete Read lcategory: [MFOS: MAINTENANCE AND |CoNSTRUCTION SERVICES OF OTHER INFRASTRUCTURES. leraye; [Acces Roads leading to Dadared Tours oad: 19,217,000.00 fam Road Component: Bridge: 3,000,000.00 fm ‘ope Protection: 12,000,00_/ m ROW: sq, ROW Component: sam JOthers (Please Specify): [Assessment For Proposed Road Projects, costing les tan Pp 1 lion (For most econoniaorment) }2 Trafic Impact Assessment For yovers/Undepasses/Interhanges costing Iss than Pp 1 Sto 3. Peasibaity Stuay For Proposed Projects costing more than Php 1 Bion Econom Intemal Rate of Retr (EIRR) = 10% 4. rarpec For Proposed Tourism Rood Projets 5. ROWERS: For Proposed Access Roads to Indust Areas C008 ueuseBueg “A719 soujwery pong ABig ‘y1ed eAcosBueW pue prergjnog: dean7 0} Buypeo7 peoy ssaoy suoneuRse WsiNO4 pale}29q 0} BuIpeDy Peoy Ss929y Jo jUDUFACIdWIT/UoRDNASUOD Lucap Boulevard (MULTI-YEAR PROJECT PROFILE FORM FUNDING SCHEDULE MAP LUCAP BOULEVARD LEADING TO MANGROOVE PARK LENGTH = 2,027.19 m. ‘page (2 0f5) OLIVERT. CELESTE ‘OfC-Chief, Planning and Design Section (Dstt Engineering Office) STRAIGHT LINE DIAGRAM MULTI-YEAR PROJECT PROFILE FORM 2019 2020 zon 202 2023 satance Tora. —_sorasraee | 55S es000 | yea mwas | aapopamaw | 179,955 850.00 roocoriseno — oonovsczkD Ko emRyaeRHD ko seasaKD | (ooeaee james cose conse, | x0 noes vasa pue cuRw 2-310 SISTED TwaANO (io) ey sven 8199 v0 poms 9 108-04 ses Lucap Boulevard MULTI-YEAR PROJECT PROFILE FORM 1. Project Preparation 2. Feasibility Study b. Detailed Engineering Design . Others (please specify) 2. Environmental & Social Concerns ‘a, RAP/ LAPRAP (ROW Acquisition) ». Environmental Permits (ECC/CNC) c. Others (please specify) 3. Project Implementation |4. Others + OLIVER T. CELESTE OIC-Chief, Planning and Design Section age (5 of) Wore: Lucap Boulevard MULTI-YEAR PROJECT PROFILE FORM Shall include photogrophs of Airports, Seaports, Tourism, industrial Sites Include other Relevant Ptures ‘Maximum often (10) photographs pase (66) ote: Lucap Boulevard MULTI-YEAR PROJECT PROFILE FORM ‘Shall include photographs of Airports, Seaports, Tourism, Industrial Sites Include other Relevant Pictures ‘Maximum of ten (10) photographs pase (5) Lucap Boulevard MULTI-YEAR PROJECT PROFILE FORM Note: Shall include photographs of Airports, Seaports, Tourism, Industrial Sites Include other Relevant Pictures ‘Maximum often (10) photographs page (606) MULTI-YEAR PROJECT PROFILE FORM PROJECT PROFILE PROGRAM] ACTIVITY PRODECT (PAP) lPRODECT NAME : NATIONAL ROAD 3CT. (START) NATIONAL ROAD ICT. (END) IRIVER BASIN lREGION: | ENGINEERING DISTRICT: TConstrucbon/ Improvement of Access Roads leading t Dedlared Tourism Destinations Construction/improvement of Access Road Leading to Deciared Tourism Destinations Access Rood Leading to |Lucap Goulevard and Mengrove Park, Bray Bued Alamines City, Pangasinan NA Na secondary n Pangasinan 1s Detrict Engineering Office [ecistarive pistRicr: Pangasinan it epidatve sti BARANGAY, Jerry munscrpatry a a rors provecr cost: 7,325 00000 InmpueMenraN orci ‘Regom ome! Hrovat vena (xt: oe NDING SOURCE: or star YEAR: 2018 END YEAR: 028 PROTECT DESCRIPTION PROVECT OBIECTIVES [Gonstracion of Read compete wth Shoulders, Sideval,Ralings, Easy Aces for to Tourist Coming fom the Lucap Wha Gong trough Siope and Shore Prtecon, Steet Lighting, Tousts Facies and’ {the Aaminos Nengrove Prk iti Safety Devices PROJECT COMPONENT SUMMARY s-Rose component | tane(n) scope of Work Output | TH! Component cast Tune cost 000) | za SILO ass [kn Tani Gg Sis 34000 90000 en Tat Wii : = atti 3 = Mik Toul co : : ce a Si = km erage : = i Sipe Pat ae TER Free IY ane component — | ages Ta) km ie on SE SESE 56655 im Bie Reena i a Ta lim mow : : im Tora] eam ‘MULTI-YEAR INVESTHENT SCHEME AND TARGETS SUMMARY ervens | oem aa ee ee ee — aa pe@| mma] —onemo| — amo] — rep] —— nea] — ee FINANCIAL AND PHYSICAL ACCOMPLISHMENT (%) eae a =a za | [ee |e | eee [ee Tt Te a ALBERTO 8. £59U830, 38 RONNEL M. TAN, #50 31 Gia Faring an Dosgr DVT Tegonal Decor 3 nowt ae exes (000) Date: (Resional OFfce) ‘Caretaker, Planning and Design Secion (Distt Engineering Office) Date: — pe ict a Date: page (10 6 MULTI-YEAR SCHEMES (MAP) MULTI-YEAR PROJECT PROFILE FORM _VICINITY/LOCATION MAP RONNEL M. TAN, CESO 111 Regional Director, obliga [Caretaker, Planning and Design Section District Engineer (District Engineering Office) Note: ___Use Qpen Street Map, Indicate Bridge Locations (2.1 of 6) MULTI-YEAR SCHEMES (MAP) MULTI-YEAR PROJECT PROFILE FORM FUNDING SCHEDULE MAP ALBERTO B. ESQUEJO, JR. RONNEL M. TAN, CESO IIT ‘Ghier, Planning and Design Division Regional Director Office BOLING IR. mardeya 5 WeghBozn Caretaker, Planning and Design Section Dire Engineer Note: ____Use Open Street: y Indicate Locations page (2.1 of 6)| ‘STRAIGHT LINE DIAGRAM MULTI-YEAR PROJECT PROFILE FORM ‘STRAIGHT LINE DIAGRAN. Leseno: ‘compute ALBERTO B. €5QUEIO,2R. (Dict Engineering Ofee) ISSUES AND CONCERNS MULTI-YEAR PROJECT PROFILE FORM ISSUES AND CONCERNS: 1. Project Preparation a. Feasibility Study b, Detailed Engineering Design c. Others (please specify) 2. Environmental & Social Concerns ‘a. RAP/ LAPRAP (ROW Acquisition) b. Environmental Permits (ECC/CNC) . Others (please specify) Project Implementation 4. Others ALBERTO B. ESQUEJO, JR. RONNEL M. TAN, CESO IIT Chief, Planning and Design Division Regional Director walt Can District Engi pave (5.06) (District Engineering Office) GEOTAGGED PHOTOS MULTI-YEAR PROJECT PROFILE FORM elfen Latitude 16.181755 16 Longitude 120.01271 (Fr) 71.30(AM Decimal Tevet eee EA Aol Longitude 120.01271 ena) Note: Shall include photographs of Airport, Seaport, Tourism, Industrial Sites Include other Relevant Pictures ‘Maximum of ten (10) photographs. pave (6 06) GEOTAGGED PHOTOS MULTI-YEAR PROJECT PROFILE FORM Dene mee MEY ET) Lee PATS eur Divs Latitude '16.18713_16°1113"N it eee ao Note: Shall include photographs of Airport, Seaport, Tourism, Industrial Sites Include other Relevant Pictures ‘Maximum of ten (10) photographs 200 (606) [op a) ated ‘SydesBovoud (0T) Wak jo uunuupen) saumaig qUenajex Ja\p0 epnpUT ‘seus /eLASNpUT ‘wusuno, “‘uodeeS “vod Jo sydex6oroyd apnou! "eUs 382,002 1 ¥6L00°021 Ea ri a ed Aol) apne) SG) jewioag ER Ath 4 ame Ve hr nm Nol@LLo9L PEC6BLOL Eyota SAG) jewioeq iow | WYOd 314OUd 193COUd BVSA-LLINW: SOLOHd G399VL045 Repu of he Pipes DEPARTMENT OF PUBLIC WORKS AND HIGHYIAYS PANGASINAN 1ST DISTRICT ENGINERRING OFFICE REGIONAL OFFICE ings Gy, Pangea PROJECT NAME: Aces Rad eang to Lup Bauevard ae Mangrove Prk, Barangay Bud, Alarinos Cty, Pangasinan PRODECT LOCATION: Barengy Bed, Alamios Cy, Pangasinan GANTT CHART. YEAR DESCRIPTION 30060. 35 6D. soeo.[ toco. | oco.] aoc. | aioce, | aocn. 2019 [painage and Sope Protection Structures zoo zon ope Bank Protection zo ope Bank Protection fexnons [sore SancPrtecton bac wd Bawcerve fateepaysen my A = 4 emt AAC INAGE TT bank end Sepa Protctn Were [stbace ane Bosecoure 2 po ACKAGE Ht [srk rd Spe Potton Works fstbae ord bascourse ERACKAGETY [srk and Spe Protecton Works er: 5 oe (camer Engoost cmeted of ” OVA CANDLLAS sutra; (SEGA BOUNGR ‘Cora, Pangan Dig Scion poet TURE YE HE eter ‘SWORN ACCOUNTABILITY STATEMENT I, Engr. Marieta B. Mendoza, District Engineer, representing Department Of Public Works And Highways - Pangasinan First District Engineering Office with office address located in Pandayan Street, Brgy. Poblacion, Alaminos City, Pangasinan takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC). ENGR. litte B. cmon Signature TIN: Subscribed and sworn before me this _i3 1 2), the above-named atffiant taking oath presenting , issued on at Notary Public Doc. No._ 292 Page No. 3. Book No. Series of 2 ey Republic of the Philippines &S Department of Environment and Natural Resource — ENVIRONMENTAL MANAGEMENT BUREAU —— Govern April 27, 2019 ECC-OL-RO1-2019-0124 Engr. MARIETA B. MENDOZA District Engineer, Department of Public Works and Highways Pangasinan 1* District Engineering Office Pandayan Street, Poblacion, Alaminos City, Pangasinan Subject: ENVIRONMENTAL COMPLIANCE CERTIFICATE Dear Engr. Mendoza: This refers to the Environmental Compliance Certificate (ECC) application for the proposed Construction of Access Road Leading to Lucap Boulevard and Mangrove Park project to be located at Brgy. Bued, Alaminos City, Pangasinan, ‘After satisfying the requirements of the said application, this Bureau has decided to grant an ECC for the above-mentioned project. This ECC shall be valid up to December 31, 2023 as per submitted Inia! Environmental Examination Checklist (IEEC) Report, and an extension of its validity shall be secured ffom this office when it is necessary. With the issuance of this ECC, you are expected to implement the measures presented in the IEEC, intended to protect and mitigate the project's adverse impacts on community heath, welfare and the environment. Environmental considerations shall be incorporated in all phases and aspects of the project. This Certificate does not create any right nor shall be used as an authorization to implement the project, you may proceed with the implementation only after securing all necessary permits and/or clearances required by other pertinent Government Agencies/ Offices that have administrative jurisdiction over such projects/operations (i.e. DENR, EMB, LGU, MGB, DAR, etc.). This Office shall be monitoring the project periodically to ensue strict compliance with the stipulations in the attached ECC. Please be guided accordingly. ENGR. wish MUL se. CESE Regional Director «< Republic of the Philippines & Department of Environment and Natural Resource ENVIRONMENTAL MANAGEMENT BUREAU — — San Femando City, La Union SS Fano) 70 283 Visit us at htto://wmw.rtemb.govoh/ ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree 1586) ECC-OL-RO1-2019-0124 ‘THIS IS TO CERTIFY THAT THE PROPONENT, DPWH Pangasinan 1* District Engineering Office, is granted this Environmental Compliance Certificate (ECC), for the proposed Construction of Access Road Leading to Lucap Boulevard and Mangrove Park project located in Brey. Bued, Alaminos City, Pangasinan, by the Department of Environment and Natural Resources (DENR), through the Environmental Management Bureau (EMB). SUBJECT ONLY to the conditions and restrictions set in this ECC and in the attached document labelled as Annexes A and B. ‘This Certificate is issued with the following details: PROJECT DESCRIPTION The ECC covers the implementation of the 2 - Kilometer access road Project with relevant components/appurtenances consisting of embankment, slope protection, 40-linear meter Reinforced Concrete Deck Girder (RCDG) Bridge, and provision of guard rails, traffic signs, pavement markings and lightings. is issued in compliance with the requirements of Presidential Decree \d in accordance with DENR Administrative Orde1 Non-compliance with any of the provisions of this Certificate sh: exceed Fifty Thousand Pesos (P50, 000.00) for every violation thereof without prejudice to imposition of fines and penalties under other environmental laws. The EMB, however, is not precluded from reevaluating and correcting any deficiencies or errors that may be found after issuance of this Certificate. Issued at EMB-RO1, Government Center, Brgy. Sevilla, San Fernando City this April 27, 2019. Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVE PARK Brgy. ued Alaminos, Pangasinan DPWH, Pangasinan |DistrictEngineering Office Recommending Approval: [It ENGR. NICANOR C. ESTEBAN OIC-Chief, Clearance & Permitting Division Approved: ENGR. uni Leda NAZ-HIPE, CESE Regional Director Environmental Compliance Certificate (CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos DPWH, Pangasinan asinan ictEngineeringOffice SWORN ACCOUNTABILITY STATEMENT 1, Engr. Marieta B. Mendoza, District Engineer, representing DPWH Pangasinan 1* District Engineering Office with office address located in Pandayen Street, Poblacion, Alaminos City, Pangasinan takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC). Ei jeta B.\ Mendoza = ae TIN APR Subscribed and swom before me tis @ 9 APR 2U08 , the above-named affiant taking oath presenting , issued on at : ATTY TE6BORO MESISON Poe ot HB Doc. No. _ 17 Page No. Book No. & Series of _ 207 Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVE PARK CONDITIONS ENVIRONMENTAL MANAGEMENT All commitments, mitigating measures and monitoring requirements, contained in the Initial Environmental Examination Checklist (IEC) Report for the proposed Road/Bridge Project, particularly in the Environmental Management Plan/ Environmental Monitoring Plan, including any modifications and/or additional information as approved by the EMB, shall be instituted to minimize any adverse impact of the project to the environment throughout its implementation, which shall include among others to wit: 1, Adequate and appropriate drainage system and soil erosion control measures including other structural measures which will conform to natural topography shall be constructed / provided to awid erosion and flooding of the adjoining properties; 2. Any construction activities and/or changes in topography /surface landform as a result of the project implementation shall consider the recommendation of available Geological/Geo-hazard Site Assessment Report, otherwise the Proponent shall conduct its own geological assessment of the area which shalll be duly reviewed by the Mines and Geosciences Bureau (MGB), and submit a report to EMB RO1 within thirty (30) days from completion of the study; 3. Strictly observe standard sanitary housekeeping practices, proper collection of solid and hazardous waste resulting from the implementation /operation of the project. The waste management plan shall include adequate facilities for disposal of wastes which shall be done from the start of the construc 4. Implement proper management of the construction mat excavated materials for each phase/stage of t stockpiling, disposal or reuse of materials. S; be brought to designated area away from drainage and runoff routes. All hauling trucks used for transporting aggregates and backfill materials should be fully covered; als, debris, and ject including appropriate e . Institute environment-friendly innovations to support wildlife conservation and protection specifically the establishment of a Conservation Program for the protection and preservation of mangroves, seagrass beds and coral reefs as part of its Corporate Social Responsibility; GENERAL CONDITIONS 6. The project proponent shall secure a valid Tree Cutting Permit issued by the DENR pursuant to the provisions of PD 705 and PD 953. In case trees will be cut during construction activities such as clearing and excavation works, the proponent shall plant appropriate tree species in accordance with the required replacement ratio and/or other forms of vegetation to compensate for the damaged vegetation per DENR Memorandum Order No. 2012-02; 7. The proponent shall undertake an effective and sustained Information, Education and Communication (IEC) Campaign to explain publicly its Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan | District EngineeringOffice mitigating measures as well as the conditions of this ECC. It shall open opportunities to educate the public especially the affected community, interested academic institutions and other parties on the environment and human health safety features of the project including mitigating measures on the effects of climate change; 8. The project operations shall comply with the provisions of RA 6969 (Toxic ‘Substances and Hazardous and Nuclear Wastes Control Act of 1990), RA 8749 (Philippine Clean Air Act of 1999), RA 9003 (Ecological Solid Waste Management Act of 2000), and RA 9275 ¢ Clean Water Act of 2004) and other relevant policies, rules and regulat 9. An ECC Billboard (3’X 5’) shall be installed at a strategic location at the project site containing this message: “NOTICE TO THE PUBLIC, THIS [Project Name] of [Project Proponent| has been issued an Environmental Compliance Certificate [ECC Ref. No.| by the DENR-Environmental Management Bureau Region 1 on [Date of Issuance];” 10. All works shall be implemented strictly according to schedule. Adequate signages on safety and traffic shall be installed and should be visible at all times in the project site; 11. Parties and communities affected by the negative impacts of the project shalll be appropriately compensated; 12. Proponent shall submit a Progress Report on the project implementation to this Office with proper documentation within fifteen (15) days after each quarter period; Il, RESTRICTIONS 13. No activities shall be undertaken other than what were stipulated in the IEC. Any expansion of the project beyond the project description or any change in the activity or transfer of location shall be the subject of a new Environmental Impact Assessment; 14. This Certificate shall be considered automatically revoked if the project has not commenced within five (5) years from the date of ECC issuance. The date of project implementation shall be the date of ground breaking, based on the proponent's work plan as submitted to the EMB; and 15. This ECC shall be valid up to December 31, 2023 as per submitted IEE Che: Report, and extension of its validity shall be secured from this office when necessary. Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADINGTO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan IDistrictEngineeringOffice PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponent and the Government agencies concerned in the management of the Project and for better coordination in mitigation of the impacts of the Project on its surrounding areas and the environment, these recommendations are forwarded to the parties and authorities concerned for appropriate action. OTHER REGULATORY CONCERNED GOVERNMENT REQUIREMENTS / CONDITIONS AGENCIES /ENTITIES 1. Compliance with the Sanitation | Department of Health (DOH) Code of the Philippines; 2. Compliance with the Labor Department of Labor and Code of the Philippines Employment (DOLE) - Bureau of working condition 3. Compliance with the Building | Local Government Unit (LGU) Code of the Philippines Concerned 4. Compliance with the Ecological | LGU Concerned Solid Waste Management Act 5, Secure tree cutting permit Department of Environment and Natural Resources (DENR} ENVIRONMENTAL PLANNING RECOMMENDATIONS FOR THE PROPONENT 6. Priority of employment shall be given to qualified local residents. Adequate public information on jobs available to local residents in the affected areas shall be provided; Dd [ at ENGR. thcawoR C. ESTEBAN OIC-Chief, Clearance & Permitting Division ENGR. MARIA, wag NAZ-HIPE, CESE Regional Director Environmental Compliance Certificate CONSTRUCTION OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK Brgy. Bued Alaminos, Pangasinan DPWH, Pangasinan |DistrictEngineeringOtfice

You might also like