You are on page 1of 4
fu 08 —09 7-624) March 14, 2008 ‘MR. HERMIN C. ALUMBRO Brgy. Poblacion, Dasol Pangasinan Dear Mr. Alumbro: Enclosed herewith is your approved Environmental Compliance Certificate (ECC) for your Gasoline Station Project located at Brgy. Bobonot, Dasol, Pangasinan. Please be informed that the ECC is not a permit and the proponent is not precluded from securing such from other government agencies that have jurisdiction over the project. All damages or adverse impact to the environment resulting from non-adoption of appropriate or adequate mitigating measures during the implementation of the project shall be your sole responsibility and liability. In case of transfer of ownership of said project, a notification shall be submitted to this office within 15 days from such transfer to effect necessary amendment of your ECC. You are encouraged to submit to this Office any comment on the conditions stipulated in your ECC and non adherence on your part within thirty (30) days indicates that you CONFORME on the different conditions. For your guidance and compliance. Very truly yours, ah JOEL G, SALVADOR, CESO VI eee precy on eee PY Preserve this roceipl Tarveferenee In case of nary "08 PoswnesterTelier a ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree 1586) (ECC-R1-0805-047-6281 ) THIS 1S TO CI Compliance Certificate (1 Pangasinan by the Di Environ TIFY THAT MR. HERMIN ©. ALUMBRO, is granted this Environmental CC) for a Gasoline Station Project located at Brgy. Bobonot, Dasol, tment of Environment and Natural Resources (DENR) through the al Management Bureau, Region 1 SUBIE ONLY to the conditions and restrietions set-out in this certificate. This certificate is issued for the Gasoline Station project with the following details: PROJECT DESCRIPTION ‘The proposed Gasoline Station Project covers an area of 500 sq. meters located at Brgy. Bobonot, Dasol Pangasinan. ‘The project includes / covers the construction and operation of a gasoline station of (2) Pump Islands under one (1) canopy, tea (2) Multi-Dispensing Pumps, two Tanks with total capacity of 2000 liters and an office building. ith facilities consisting 2) Underground Storage L CONDITIONS, ENVIRONMENTAL MANAGEMENT. ‘The proponent shall strictly implement the following mitigating, enhancement, and rehabilitating measures: 1, All permits and/or clearances from concerned Offices that have administrative jurisdiction over the project shall be secured prior and during project implementation ie. HLURB, LGU, etc 2, Adequate and appropriate drainage system and soil control measures including other structural measures which will conform with natural topography shall be constructed / provided to avoid erosion and flooding of the adjoining properties; 5. Regular Sanitary Housekeeping practices, proper collection of solid and hazardous waste sulting from the implementation/operation of the project shall be strictly observed. ‘The wast management plan shall include adequate facilities for disposal of wastes which shall be done from the tart of the constrctionyg/ ey ece Neo 4. In case of vegetation loss due to construction the project proponent shall plant appropriate tree species, compensate for the damaged vegetation; tivities such as clearing and excavation works, \d/or other forms of vegetation to 5. Cutting of trees shall be covered by a valid permit from the DENR pursuant to the provisions of PD 705 and PD 953. GENERAL CONDITIONS. Further administrative conditions for the grant of this certificate shall be strictly complied 6, ‘The proponent’s operations shall conform with the provisions of RA 6969 (Toxic Substances and Hazardous and Nuclear Waste Control Act of 1990), RA 9003 (Act Providing for an Ecological Solid Waste Management Program), RA 9275 (Philippine Clean Water Act of 2004), and RA 8749 (Philippine Clean Air Act of 1999); ‘The proponent shall make available information based on the project schedules as indicated in the submitted Impact Assessment and Mitigation Summary / EMP for the implementation of the project and proposed mitigating measures in the construction and operational phase. An accomplishment report on the implemented mitigating measures and the corresponding cost of such activities shall be submitted to EMB Regional Office on a quarterly basis for monitoring; 8, The proponent shall undertake an effective and sustained Information, Education and ‘Communication (IEC) Campaign to explain publicly its mitigative measures as well as the conditions of this ECC. It shall open opportunities to educate the public especially the affected , interested academic institutions and other parties on the environment and human health safety features of the project; 9. The proponent shall set-up an Environmental Unit who shall handle the environmental aspects of the project, which shall have the following responsibilities: a. Monitoring of mitigating and enhancement measures as cited in the EIS / IEE Report / Checklist / EPRMP, as appropriate; b. Monitor actual project impact vis-a-vis predicted impacts and management measures; c. Ensure that post-assessment permits are in place, dd. Ensure that monitoring and reporting are undertaken; e. Ensure compliance to all the conditions and restrictions of the approved ECC, 10, In case of abandonment, the Proponent shall notify the EMB Regional Office within three (3) months prior to the abandonment and shall submit its abandonment mitigating plan for arty ey eck -2- eo “008 I RESTRICTIONS ‘The proponent is strictly subject to the following rest ions: 11, No other activities shall be undertaken other than what was stipulated in the ELA document. Should there be an expansion of the project beyond the project description, construction of other structures beyond those stated in the EIA document, or any change in the activity, same shall be made subject to a new Environmental Impact Assessment; 12, Land clearing shall be limited to the project description; and 13, In case of transfer of ownership of this project, the same conditions and restriction shall apply and the transferee shall be required to notify the EMB Regional Office of such transfer within fifteen (15) days. ‘This certification is issued in compliance with the requirements of Presidential Decree No. 1586 and Department Administrative Order No, 2003-30. ‘The Bureau, however, is not precluded from reevaluating, adding, removing and correcting any deficiencies or errors that may be found in this Certificate after issuance, Issued at San Fernando City, La Union this_26 MAR 2008 Recommending Approval mea le BAN o1 {Division P Approved by: Qu JOEL G, SALVADOR, CESO IT Regional Director Non-compliance with any ofthe provisions of ths certficate shall bea suficent cans forthe cancellation or suspension ofthis certificate and/or imposition of fine tx an amount net to exceed Fifty Thonsaxd Pesos (P50.000.00) for exery iolation terse ss27241 Date Processing Fee B 4,000.00 VALID ONLY IF MARKED WITH DRY SEAL ec <3 Heo

You might also like