You are on page 1of 1
| ~ a SS Republic of the Philippines 8 Department of Environment and Natural Resources — ENVIRONMENTAL MANAGEMENT BUREAU =— it Regional Office No. 4 = 2" Floor Lee Bldg., Lingsat, City of San Fernando, La Union SITE VERIFICATION REPORT Verification : _February 12. 2008 / 10:00 A.M. Date and Time of Si Date Application Received :_ February 01, 2008. New ECC C1 Amendment of ECC ERAL INFORMATION 1. Name of Project Proponent: | 2 Location of Project :_Caranglaan, Dagupan City, Pangasinan 3. Name and Position of Responsible Person Contracted ; _Engr. Marvin Pulido ~ Project Engineer 4. Type/Nature of Project :_ Gasoline Station Office / Business Address : Caranglaan, Dagupan City, Pangasinan | Tel. No. B,_ FINDINGS / OBSERVATION 1, Status of the Project: [] Not Existing Existing Approximate % Completion :_35.50% completed 2, Ifexisting, describe the project The proponent has started implementing the project. The gasoline station is 75% to 80% completed. Installed facilities consists of four (4) UGTs, two (2) pump islands, two (2) dispensing pumps and a canopy. Being constructed is its convenience store / office building, 3. Description of Project Area and Surrounding Environment The project site covers an area of 1,600 sq, meters, flat surface and no standing trees oF structure other than the proponent’s new facilites. It is located in a built-up area. North of the project is a residential area, on the south is National Road and business establishments on the east and west, Between the highway and the project site is underground public drainage system, Beyond its adjoining areas are either residences or commercial establishments. REMARKS: 1. The operation of the gasoline station project is fuel refilling with a total capacity of 18,000 gallons of fuel It has no wash bay or other sources of wastewater except domestic waste 2, The project site is a leased property. Its original conditions / situation has been altered since the proponent has started his project even without EMB clearance, a violation of the Phil. EIS System D, RECOMMENDATION : (J For issuance of ECC / Amendment For Issuance of Notice of Violation / Summon poy alae NICAN Executive Assistan’Yor Operations sic veresion nProtect the environment... Protect Life... Tel. Nos. (072)-242-3057 / 700-2448, Fax No. (072)-700-2449; e-mail: emb1 @emb.gov.ph / embdenrl@yahoo.com

You might also like