You are on page 1of 1

SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX

OPRNS
PMT

AMIEF 2821: SAFETY INSTRUCTION SHEET - CRITICAL PLANT PIPING


1 LINE NUMBER
CERT

2 START

3 END
ENGG

4 SERVICE

5 PIPING CODE/ YEAR YEAR


6 P&ID's OR
LINE DESIGNATION TABLE

7 NOMINAL PIPE SIZE in. in. in. in.

8 PIPE O.D. in. in. #REF! in. in.


DESCRIPTION

9 NOM. WALL THK. in. in. in. in.

10 MATERIAL SPEC.
PIPE

11 MATERIAL GR.
12 ALLOWABLE STRESS PSI PSI PSI PSI

13 WELDED/ SMLS
14 WELD JOINT EFFICIENCY

15 RATING
FLANGES
JO/EWO

16 FACING
EQUIPMENT DATA

17 MATERIAL SPEC.

18 MATERIAL GR.
DATE

19 RATING
FITTINGS

20 MATERIAL SPEC.
NO.
REV

21 MATERIAL GR.

DISCIPLINE 22 REMARKS :
ENGINEER

DATE:

PROJECT
ENGINEER

DATE:

CERTIFIED

DATE: 23 DESIGN PRESSURE PSIG - KPa


CONSTRUCTION 24 DESIGN TEMPERATURE °F °C
AGENCY
25 LIMITED BY
DATE: 26 TEST PRESSURE NEW PSIG - KPa

OPERATIONS 27 LIMITED BY

28 SAFETY VALVE SET PRESSURE PSIG - KPa


DATE: 29 tm (Pressure) in. in. in. in.
OPERATING LIMITS

30 Req. Corr. Allow. in. in. in. in.


VERIFICATION

CONTROL NUMBER

31 tm (Code) in. in. in. in.


EDSD

(1)
32 tm (Structural) #REF! #REF! #REF! #REF! #REF!
(CONTACT OPERATIONS ENGINEERING BEFORE EXCEEDING THE ABOVE LIMITS)
33 REMARKS:
DATE:
BY:

(1) This is the Structural Minimum Thickness (i.e., for Mechanical Strength). This T m (Structural) is listed if GREATER
than Tm (Pressure). Refer to SAES-L-003.
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.

SIS FOR DWG TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

A
(DCC) NO.:

0
SAUDI ARABIA JO / EWO