Professional Documents
Culture Documents
Assignment - Workpack On Boiler
Assignment - Workpack On Boiler
Instruction
1. Perform an inspection and repair on wall of a water tube boiler (addressing wall cracks).
[saufi + aqid]
2. Perform an inspection and repair of tubes in a water-tube boiler (addressing tube
damage). [Ummi + shazwani]
3. Perform an inspection and repair of Safety Valve, Blow Down Valve and Main Stop Valve
in water tube boiler. (addressing broken Valve) [Alicia + Widad]
4. Perform a corrosion inspection inside tube and steam drum. (addressing corroded tube
and steam drum). [Arin + Aidi]
5. Implement a cleaning procedure to remove accumulated mud, sludge, or other deposits
from the mud drum for improved water quality. (addressing cleaning activity and
internal water treatment procedure). [Aisya + Syafiqah].
2324I (BVF3184)