Professional Documents
Culture Documents
BH2266500co CR2355-BPK-PRO-QC-004-0 0
SHEET 1 OF 8
PROCEDURE
Issue Record
0 28 Mar 2023 Issued for Approval Nibras Budi Wahyu L Fais Nurul huda
By Date
Rev
Date Reason for Issue Prepared Checked Approved
No. Client
BH2266500co Construction & Supply of Utility System at Laydown 10
Inside Cleaning Procedure
REVISION HISTORY
Amendment Revision
Amender Name Amendment
Date Number
TABLE OF CONTENTS
1. INTRODUCTION................................................................................................................................ 4
1.1. Scope.......................................................................................................................................... 4
1.2. Definition...................................................................................................................................... 4
1.3. Terminology................................................................................................................................. 4
2. REFERENCES................................................................................................................................... 4
3. EXECUTION....................................................................................................................................... 5
4. ACEPTANCE CRITERIA.................................................................................................................... 6
5. SAFETY PRECAUTION..................................................................................................................... 7
6. ATTACHMENT................................................................................................................................... 8
1. INTRODUCTION
PT. AMMAN MINERAL NUSA TENGGARA, hereinafter known as COMPANY, in this case
appoints PT Baharu Penta Kencana to carrying out the procurement and construction work for
Construction & Supply of Utility System at Laydown 10 Project, including Civil, Mechanical,
Piping, Steel Structure and Electrical Work. Project is located in West Nusa Tenggara,
Sumbawa - Indonesia.
Appendix AScope
This procedure covers the inside cleaning work from shop fabrication (pre-cleaned) for
maintain, and protect from corrosion attack during material delivered, field flushing and
cleaning requirement after installation and testing.
Appendix BDefinition
“COMPANY” means PT AMMAN MINERAL NUSA TENGGARA
“CONTRACTOR” means PT BAHARU PENTA KENCANA.
Appendix C Terminology
Cleaning: The process of removing deposits, scale, corrosion products, or other
foulants which restrict flow, impair heat transfer, or contaminate the product being
conveyed in the piping systems.
Degree of Cleaning: A detailed description of the exact extent to which contaminants
shall be removed from the piping system, and what level of remaining contamination
is acceptable.
Field Cleaning: Any cleaning procedure performed on piping systems after field
installation.
Flushing: Circulating flushing fluid at sufficient velocity to remove all foreign matter.
Pre-cleaned Products: Materials that have been chemically or mechanically cleaned,
disinfected, passivated, rinsed, pickled, or protected from corrosion, or had any paint
stripped from their surfaces by the shop fabricator or manufacturer before installation.
2. REFERENCES
Contract Document Installation & Supply of Utility System at
Laydown 10 (BH2266500co).
Project Technical Specification
SP-AMNT-5-009 Rev.2 Internal Cleaning of Piping System.
3. EXECUTION
3.1. Shop Fabrication Cleaning Procedure
a) Preparation for Cleaning
All pipe runs and joints shall be visually inspected for proper Fabrication.
b) Materials
Fresh, clean water shall be used as the flushing and cleaning agent.
c) Equipment
Not apllicable
d) Cleaning Procedure
Materials that are to be supplied pre-cleaned by the shop fabricator are shown on
the piping contract drawings.
Completely remove all weld slag, flux, debris, grease, oil, and foreign matter from
the surfaces of the material after fabrication has been completed.
All cleaned surfaces shall be protected from recontamination by using covers,
plugs, caps, wrapping or other devices suitable to the purpose.
e) Chemical Solution and Rinse Disposal
Not applicable.
f) Degree of Cleaning
Not applicable.
g) Inspection Procedure
Completely remove all weld slag, flux, debris, grease, oil, and foreign matter from the
surfaces of the material after fabrication has been completed and ready for packing.
h) Post-Cleaning Procedure
After everything is clean accordance to the provisions, packing will be done in
accordance with the previsions that apply to this project.
4. ACEPTANCE CRITERIA
Cleaning activities for this scope of this project must be full witnessed by QA/QC COMPANY by
the following approval procedure and shall be done or released by him/her approval.
5. SAFETY PRECAUTION
1. Pre-job execution:
Correct Job Safety Assessment (JSA) shall be done before executing the work and
communicating to all crew on daily basis.
Correct JEA (Job Environmental Analysis) shall be done prior to execute the work and
recorded in the JSA (Job Safety Analysis) format.
2. Equipment & Tools Inspection
All equipment shall pass pre-mobilization inspection.
All equipment shall be completed with standard operating procedure.
3. Manpower Qualification
All workers shall pass medical assessment prior to site mobilization.
All workers shall receive induction and required training for doing the job.
All workers shall be competent to perform the job properly in the safe manner.
Operation shall only be executed on the presence of proper supervision.
SHE personnel shall be assigned to monitor the compliance of all regulation.
4. Personal Protective Equipment (PPE) shall be worn as appropriate
Safety helmet (mandatory),
Safety shoes (mandatory),
Safety goggles (mandatory),
Safety gloves (mandatory),
Working clothes that cover upper arm, body and leg (to ankle),
Other personnel protective equipment as required by the job.
2. Safety program shall be implemented but not limited to the following requirement:
Emergency system to anticipate any possible emergency including first aid system and
incident reporting.
Environmental and waste management system.
3. Safety practice shall be implemented but not limited to the following requirement and toolbox
meeting shall be conducted prior to the commencement of the work.
4. All Flange connections shall be checked to avoid the lose bolt that can cause injury.
5. Where flushing and blowing is being carry out, the effective area shall be barricade and
warning sign board shall be displayed as well.
6. Only authorized person involved are allowed entering the test area. To prevent un wanted
person to entry the area, a watch man together with the safety man will guard during testing.
7. No body standing behind end of pipe the being tested.
8. Checked the thickness of temporary blind, flange and spool is as per design.
9. Chain and lock for preventing unauthorized operation of valve.
10. Personal Protective Equipment shall be worn throughout the cleaning duration.
6. ATTACHMENT
Reporting