Matrik 2a.

Rencana dan Realisasi Kemajuan Tambang Terbuka

Deskripsi
Rencana dan
Lokasi/Blok/Pit Tambang Aktif Tambang Selesai
Realisasi
(Ha) (Ha)
Pit 2A 0.00 33.42
BLOK A
Rencana Tahun PIT A1 5.21 0
2022 BLOK B PIT B1, PIT B3, PIT B2 19.87 0
Total 25.08 33.42
Pit 2A 0.00 0
BLOK A
PIT A1 0.00 0
PIT B5 2.26 0
Realisasi PIT B1 3.48 0
Triwulan I
Tahun 2022 BLOK B PIT B2 0.00 0
PIT B3 5.48 0
PIT B4 2.88 0
Total 14.10 0
Pit 2A 0% 0%
BLOK A
Persentase PIT A1 0% 0%
Pencapaian (%) BLOK B PIT B5, 3A, B3, 3B, 3D 55% 0%
Total 55% 0%
1.3025
4.9675
Matrik 2b. Rencana dan Realisasi Elevasi Kedalaman Tambang

Deskripsi
Rencana dan
Lokasi/Blok/Pit Elevasi Tambang Elevasi Tambang Sesuai
Realisasi
(m) FS (m)
BLOK A PIT A1 95 -
Rencana
Tahun 2022 BLOK B PIT B1, PIT B3, PIT B2 95 -
Total 95 -
BLOK A PIT A1 0 -
PIT B5 95 -
PIT B1 95 -
Realisasi
Triwulan I BLOK B PIT B2 0 -
Tahun 2022
PIT B3 95 -
PIT B4 95 -
Total 95 -
BLOK A Pit 2A 0% 0%
Persentase
Pencapaian BLOK B PIT B5, 3A, B3, 3B, 3D 100% 0%
(%)
Total 100% 0%
Matrik 3. Rencana dan Realisasi Penambangan Mineral Batuan Triwulan I Tahun 2022

RENCANA Bulan
DAN Lokasi/Blok/Pit
REALISASI Jan Feb Maret April Mei Juni Juli Agust Sept Okt Nov Des Total
1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 18
BLOK A PIT A1 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 60,000.00

PIT B1 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 60,000.00

RENCANA BLOK B PIT B2 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 60,000.00
TAHUN 2022 PIT B3 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 60,000.00

TOTAL 20,005.00 20,006.00 20,007.00 20,008.00 20,009.00 20,010.00 20,011.00 20,012.00 20,013.00 20,014.00 20,015.00 20,016.00 240,018.00

RECOVERY PENAMBANGAN 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%

BLOK A PIT A1 3,800.00 - - - - - - - - - - - 3,800.00

PIT B1 4,400.00 4,400.00 4,400.00 - - - - - - - - - 13,200.00


REALISASI PIT B2 4,200.00 - - - - - - - - - - - 4,200.00
TRIWULAN I
TAHUN 2022 PIT B3 4,300.00 4,300.00 4,300.00 - - - - - - - - - 12,900.00

TOTAL 16,700.00 8,700.00 8,700.00 - - - - - - - - - 34,100.00

RECOVERY PENAMBANGAN 100% 100% 100%

BLOK A PIT A1 76% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 25%

PIT B1 88% 88% 88% 0% 0% 0% 0% 0% 0% 0% 0% 0% 88%


PERSENTASE PIT B2 84% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 28%
PENCAPAIAN
(%) PIT B3 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

TOTAL 41% 15% 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 24%

RECOVERY PENAMBANGAN 90% 90% 90% 90%


Matrik 4. Peralatan Pengolahan dan Fasilitas Pemuatan dan Pengapalan yang dimiliki Perusahaan dan Kontraktor

NO JENIS PERALATAN TIPE KAPASITAS JUMLAH PERALATAN

1 2 3 4 5
1 Alat Gali-Muat Batuan Penutup PC 300 1.8 m³ 4
2 Alat Gali-Muat Komoditas PC 200 0.9 m³ 11
3 Alat Muat Batuan Penutup DT 21 TON 7
4 Alat Muat Komoditas DT 21 TON 7
5 Alat angkut batuan penutup DT 21 TON 7
6 Alat angkut komoditas DT 21 TON 9
7 Alat pembongkaran Batuan Penutup Buldozer D85S 2
(Bulldozer)
Alat Pembongkaran Batuan/Komoditas
8 Buldozer D85S 1
(Bulldozer)
9 Alat Penunjang
Matrik 5a. Rencana dan Realisasi Biaya Kegiatan Penambangan Triwulan I Tahun 2022

Rencana DESKRIPSI
Lokasi
dan DESKRIPSI LAND CLEARING OVERBURDEN MINERAL
Blok/Pit JUMLAH
Realisasi ( M2 ) REMOVAL (BCM) GETTING (TON)
1 2 3 4 5 6 7

BLOK A/ KUANTITAS 52,100.00 455,788.00 200,000.00 -


Rencana PIT A1
Tahun 2022 SATUAN BIAYA (Rp) 1,875,600,000 6,061,980,400 3,160,000,000 11,097,580,400
TOTAL BIAYA (Rp) 1,875,600,000 6,061,980,400 3,160,000,000 11,097,580,400

BLOK A/ KUANTITAS - - - -
Realisasi
Triwulan I PIT A1 SATUAN BIAYA (Rp) - - - -
Tahun 2022
TOTAL BIAYA (Rp) 0 0 0 0

BLOK A/ KUANTITAS 0% 0% 0% 0%
Persentase
Pencapaian PIT A1 SATUAN BIAYA (Rp) 0% 0% 0% 0%
Triwulan I
TOTAL BIAYA (Rp) 0% 0% 0% 0%
Matrik 5b. Rencana dan Realisasi Biaya Pengolahan Triwulan I Tahun 2022

Rencana Tahun 2022 Ren


No Kegiatan Sat Hasil Pengolahan dan/ Recovery Biaya Total
Minera I Minera I
atau Pemurnian (M³) (%) Satuan Biaya
1. Procesing
- Crushing M³

Jumlah
n Triwulan I Tahun 2022

Rencana Tahun 2022


Hasil Pengolahan dan/ Recovery Biaya Total
atau Pemurnian (M³) (%) Satuan Biaya
Matrik 5c. Rencana dan Realisasi Biaya Kegiatan Pemasaran Triwulan I Tahun 2022

RENCANA TAHUN 2022 REALISASI TRIWULAN I TAHUN 2022 PERSENTASE PENCAPAIAN (%)

NO KEGIATAN SAT Biaya Biaya Biaya


Jarak/ Total Biaya Jarak/ Total Biaya Jarak/ Total Biaya
Satuan Satuan Satuan
Tonase (Rp) Tonase (Rp) Tonase (Rp)
(Rp) (Rp) (Rp)

1 M³ #DIV/0! #DIV/0! #DIV/0!


2 M³ #DIV/0! #DIV/0! #DIV/0!
3 M³ #DIV/0! #DIV/0! #DIV/0!
4 M³ #DIV/0! #DIV/0! #DIV/0!
5 M³ #DIV/0! #DIV/0! #DIV/0!
JUMLAH - - - - #DIV/0! #DIV/0!
R
E
N
C
A
N
A
Jarak/ T REALISASI
Tonase A TAHUN 2019
Jarak/Tonase
H
NO BULAN SATUAN* Biaya Biaya
satuan U satuan
TOTAL N TOTAL BIAYA
BIAYA 2
0
1 Januari MT 1
9
2 Februari MT

3 Maret MT
4 April MT
5 Mei MT
6 Juni MT

7 Juli MT 20,000.00 ### ###

8 Agustus MT 30,000.00 ### ###


9 September MT 35,000.00 ### ###
10 Oktober MT 40,000.00 ### ###
11 Nopember MT 40,000.00 ### ###
12 Desember MT 35,000.00 ### ###
JUML
AH 200,000.00 ### ###
R
E
N
C
A
N
A

Jarak/ T
Tonase A
Biaya H
satuan U
TOTAL N
BIAYA
2
### 0 ### ###
2
### 0 ### ###

### ### ###


### ### ###
### ### ###
### ### ###

### ### ###

### ### ###


### ### ###
### ### ###
### ### ###
### ### ###

### ### ###


Matrik 6a. Rencana dan Realisasi Pengolahan Triwulan I Tahun 2022

RENCANA REALISASI TRIWULAN I TAHUN 2022


NO DESKRIPSI TOTAL
TAHUN 2022 BULAN 1/4/7/10 BULAN 2/5/8/11 BULAN 3/6/9/12
1 2 3 4 5 6
1 Batuan yang diolah (M³)
2 Produksi (M³)
3 Spesifikasi
- Split 1/3 (M³)
-
-
4 Recoveri (%)
Matrik 6b. Sisa Hasil Pengolahan

REALISASI TRIWULAN I TAHUN 2022


NO DESKRIPSI TOTAL
BULAN 1/4/7/10 BULAN 2/5/8/11 BULAN 3/6/9/12
1 2 3 4 5
1 Sisa Hasil Pengolahan (M³)
2
3
Matrik 7a. Rencana dan Realisasi Pemasaran Triwulan I Tahun 2022

RENCANA TAHUN 2022 REALISASI TRIWULAN I


PENCAPAIAN (%)
(M³) TAHUN 2022 (M³)
NO Bulan BUYER/ PEMBELI
EKSPOR DOMESTIC EKSPOR DOMESTIC EKSPOR DOMESTIC

1 Jan #DIV/0!
2 Feb #DIV/0!
3 Maret #DIV/0!
4 April
5 Mei
6 Juni
7 Juli
8 Agus
9 Sep
10 Okt
11 Nov
12 Des
TOTAL 0.00 0.00
RENCANA TAHUN 2019 RENCANA TAHUN 2020 (MT)

NO Bulan

1 Januari 70,000.00

2 Perbuari 70,000.00

3 Maret 85,000.00

4 April 85,000.00

5 Mei 80,000.00

6 Juni 90,000.00

7 Juli 90,000.00

8 Agustus 90,000.00
9 September 90,000.00

10 Oktober 85,000.00

11 November ### Sulawesi Mining Investment 85,000.00

12 Desember ### Sulawesi Mining Investment 82,400.00

TOTAL ### 1,002,400.00


RENCANA TAHUN 2020 (MT)

KADAR/
KUALITAS
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment

Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Sulawesi
Ni 1,7 % < Mining
Investment
Matrik 7b. Realisasi Pemasaran Triwulan I Tahun 2022

REALISASI TrRIWULAN I TAHUN 2022

NO Keterangan
Tanggal Volume
Pembeli Spesifikasi Harga (Rp) Negara Tujuan Hubungan
Pengapalan (MT)
Afiliasi
1 1/5/2021 PT. Bukit Smelter Indonesia 10,500 483,546.00 - -
2 1/8/2021 PT. Bukit Smelter Indonesia 7,100 512,022.00 - -
3 1/8/2021 PT. Bukit Smelter Indonesia 14,500 485,007.00 - -
4 1/15/2021 PT. Bukit Smelter Indonesia 10,500 516,913.00 - -
5 1/22/2021 PT. Bukit Smelter Indonesia 7,100 517,722.00 - -
6 1/27/2021 PT. Bukit Smelter Indonesia 11,000 517,722.00 - -
7 1/29/2021 PT. Bukit Smelter Indonesia 10,500 517,942.00 - -
8 1/29/2021 PT. Bukit Smelter Indonesia 12,000 517,942.00 - -
9 2/1/2021 PT. Bukit Smelter Indonesia 7,100 517,942.00 - -
10 2/8/2021 PT. Bukit Smelter Indonesia 11,000 545,043.00 - -
11 2/9/2021 PT. Bukit Smelter Indonesia 12,000 545,043.00 - -
12 2/11/2021 PT. Bukit Smelter Indonesia 7,100 542,640.00 - -
13 2/11/2021 PT. Bukit Smelter Indonesia 10,500 542,640.00 - -
14 2/15/2021 PT. Bukit Smelter Indonesia 10,000 543,066.00 - -
15 3/29/2021 PT. Bukit Smelter Indonesia 12,000 584,774.00 - -
Total 152,900 7,889,964.00
Matrik 8a. Realisasi Inventori Hasil Penambangan (Raw Material)

Realisasi Triwulan I Tahun 2022


No Bulan Stockpile 1 Stockpile 2
Tonase Kadar Tonase Kadar
1 2 3 4 5
A Kapasitas Maksimum

B Stock Akhir Triwulan Sebelumnya

1 Januari
2 Februari
3 Maret
117,504 83,200 34,304 11,435 22,869
136,998 123,800 13,198 4,399 8,799
170,678 181,700 (11,022) (3,674) (7,348)

171,302 47,502 15,834 31,668

218,180 36,480 12,160 24,320


Matrik 8b. Realisasi Inventori Produk Hasil Pengolahan

PRODUK PENGOLAHAN
No Bulan
Produk I Priduk II Produk III DST
1 2 3 4 5

Stock Akhir Triwulan Sebelumnya

1 Januari
2 Februari
3 Maret
117,504 83,200 34,304 11,435 22,869
136,998 123,800 13,198 4,399 8,799
170,678 181,700 (11,022) (3,674) (7,348)

171,302 47,502 15,834 31,668

218,180 36,480 12,160 24,320


Matrik 9. Kegiatan Pengelolaan dan Pemantauan Lingkungan Triwulan I Tahun 2022

Triwulan I Triwulan II Triwulan III Triwulan IV


Uraian Kegiatan
Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi
1 2 3 2 3 2 3 2 3
I Pengelolaan Lingkungan

1. Pengelolaan kualitas air


a. Pemberi kapur (kg) - - - -
b. Pemberi tawas (kg)
c. Pemberian Reagen Lainnya (jika ada) (satuan volume)
II Pemantauan (beberapa kali per triwulan)

1. Kualitas air

2. Revegetasi (tingkat pertumbuhan)

3. Dan Lain-lain (sesuai dengan Dokumen Lingkungan Hidup)


-
Realisasi Tahun 2019
Uraian Kegiatan Tri. I Tri. II
1 2 3

Pengelolaan
Lingkungan
1.
Pengelolaan
kualitas air
a. Pemberi
kapur (kg)
b. Pemberi
tawas (kg)

c. Pemberian
reagen
lainnya (jika
ada)

2.
Pengelolaan
kualitas
udara
(beberapa
kali pert
triwulan)

a.
Penyiraman
jalan
tambang
b.Penyirama
n jalan
hauling
3.Pengelolaa
n kualitas
tanah
(beberapa
I kali per
triwulan)
a.
Pemupukan
I

b. Pemberian
kapur
pertanian

4.
Pengelolaan
limbah B3
(beberapa
kali
pertriwulan)
a.
Pengumpula
n limbah
b.
Penyimpana
n

c.
Pengiriman
ke pihak
ketiga
(pengumpul
limbah B3
yang berizin)
d. Remediasi
(jika ada)
e.
Pemusnahan
di Insinerator
Pemantauan
(beberapa
kali per
triwulan)

1. Kualitas air

2. Kualitas
Udara
II 3. Kualitas
tanah
4.
Kesetabilan
lereng
5. Limbah B3
6.
Ambelesan
(jika ada)
alisasi Tahun 2019 Rencana Tahun 2020
Tri.III Tri. IV Tri. I Tri. II Tri. III Tri. IV
4 5 6 7 8 9

1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1
1 1 1 1 1

1 1 1 1 1

1 1 1 1

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1
Matrik 10. Realisasi Pembukaan Lahan Triwulan I Tahun 2022

Triwulan I Triwulan II Triwulan III Triwulan IV


Rencana Bukaan Lahan Total
Uraian Pembukaan Lahan Dalam Dokumen Rencana Realisasi
Reklamasi Tahun 2022 Renc Real Renc Real Renc Real Renc Real (Ha)

1 2 3 4 5 6 7 8 9 10 11
1. Lahan untuk Tambang (ha) -
2. Timbunan OB/batuan penutup diluar tambang (ha) -
3. Timbunan Tanah Pucuk (ha) -
4. Jalan Tambang (ha) -
5. Kolam Sedimen/Kendali Erosi (ha) -
6. Fasilitas Penunjang
a. Pabrik Pengolahan dan Pemurnian -
b. Kolam/Timbunan Hasil Pengolahan -
c. Perumahan Karyawan -
d. Jalan Non Tambang -
e. Kgudang Handak -
f. Kantor -
g. Bengkel -
h. Pelabuhan -
i. Landfill -
j. Lainnya -
Total - - - - - - - - - -
Matrik 11. Realisasi Reklamasi Triwulan I Tahun 2022

Rencana Reklamasi Dalam Triwulan I Triwulan II Triwulan III Triwulan IV


Total Realisasi Tahun
Uraian Reklamasi Dokumen Rencana Reklamasi
2022 (Ha)
Tahun 2022 Renc Real Renc Real Renc Real Renc Real
1 2 3 4 5 6 7 8 9 10 11=4+6+8+10
1. Pengisian Kembali Lahan Bekas Tambang (backfilling) (ha) -
2. Pengaturan Permukaan Lahan (ha) -
a. Timbunan Tanah/ Batuan Penutup di Bekas Tambang (inpit) -
b. Timbunan Tanah/ Batuan Penutup di Luar Tambang (outpit) -
c. Bekas Kolam Sedimen/ Sarana Pengendali Erosi
d. Bekas Jalan Tambang -
e. Bekas Jalan Non Tambang -
f. Fasilitas Penunjang Lainnya -
3. Penghijauan (Revegetasi) (ha) -
a. Lahan Bekas Tambang -
b. Timbunan Tanah/ Batuan Penutup -
c. Bekas Kolam sSedimen/ Sarana Pengendali Erosi -
d. Bekas Jalan Tambang -
e. Bekas Jalan Non Tambang -
f. Fasilitas Penunjang Lainnya -
4. Reklamasi bentuk lain (waduk, pemukiman, dll (ha)

a. Lahan Bekas Tambang -


b. Timbunan Tanah/ Batuan Penutup - -
c. Area Lainnya (infrastruktur) - -
Uraian Reklamasi

Pengisian
kembali
lahan
1 bekas
tambang
(backfilling
) (ha)

Pengatura
n
2
Permukaan
Lahan (ha)

a.
Timbunan
tanah/batu
an
penutup di
bekas
tambang
(inpit)

b.
Timbunan
tanah/batu
an
penutup di
luar
tambang
(outpit)
c.
Timbunan
tailing
d. Bekas
kolam
sedimen/sa
rana
pengendali
erosi
e. Bekas
jalan
tambang
f. Bekas
jalan non
tambang

g. Fasilitas
penunjang
lainnya

Penghijaua
n
3
(Revegetas
i) (ha)
a. Lahan
Bekas
Tambang
b.
Timbunan
tanah/batu
an
penutup
c.
Timbunan
tailing
d. Bekas
kolam
sedimen/sa
rana
pengendali
erosi
e. Bekas
jalan
tambang
f. Bekas
jalan non
tambang
g. Fasilitas
Penunjang
Lainnya

Reklamasi
bentuk lain
4 (waduk,
pemukima
n,dll) (ha)
a. Lahan
Bekas
Tambang
b.
Timbunan
tanah/batu
an
penutup
c. Area
lainnya
(infrastrukt
ur)
Rencana Total
Kumulatif
Reklamasi Rencana Rencana
Realisasi Rencana
dalam Reklamasi Rencana Reklamasi RKAB Tahun 2020 Reklamasi
Reklamasi Reklamasi
dokumen RKAB Tahun
s.d dalam
RR 2020 (ha)
dokumen
Realisasi rencana
Tahun Tahun Tahun reklamasi
2019 2019 2019 Tahun
2020

Tahun
Tri. 1 Tri. II Tri. III Tri. IV
2019
11=(7+8+9
2 3 4 5 6 7 8 9 10
+10)

8 5.4 1.25 1.25 1.25 1.25 10.4

5.4 5 5.5 5.5 5.45 26.85


5.4 2.5 2.5 2.5 2.5 15.4
Matrik 12. Hasil Pemantauan Lingkungan Triwulan I Tahun 2022

Pemantauan Kualitas Air (Titik Pemantauan dan Titik Penaatan)


Hasil Uji
Baku Mutu
No Parameter Satuan Lingkungan Lokasi Sampling 1 Lokasi Sampling 2 Lokasi Sampling 3
(BML)
TW. I TW. II TW. II TW. IV TW. I TW. II TW. II TW. IV TW. I TW. II TW. III TW. IV
1. Parameter 1
2. Parameter 2
3. Parameter 3
4. Parameter 5
5. Dst
Matrik 21. Realisasi Biaya Pengelolaan dan Pemantauan Lingkungan Triwulan I Tahun 2022

Rencana dan Realisasi Tahun 2022 (Rp)


Rencana Biaya Pengelolaan
Uraian Biaya Pengelolaan dan Pemantauan
dan Pemantauan Lingkungan Triwulan I Triwulan II Triwulan III Triwulan IV
Lingkungan
Tahun 2022
Renc Real Renc Real Renc Real Renc Real
1 2 3 4 5 6 7 8 9
1. Biaya Pengelolaan Lingkungan
1) Pembongkaran fasilitas tambang (jika ada)
2) Penataan lahan -
3) Penghijauan, meliputi:
4) Pekerjaan sipil seperti pembuatan dam/kolam
pengendap dan perawatan kolam pengendap -

5) Pengelolaan Kualitas Air -


2. Biaya Pemantauan Lingkungan
1) Kualitas Air -
TOTAL BIAYA PENGELOLAAN DAN PEMANTAUAN - - - - - - - -
LINGKUNGAN

0
Rencana dan Realisasi Tahun 2019 (Rp) Rencana Tahun 2020 (Rp)

Tri. I Tri. II Tri. III Tri. IV TOTAL


Tri. I Tri. II Tri. III Tri. IV TOTAL

Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

81,250,000 81,250,000 81,250,000 81,250,000 325,000,000


-
279,400,000 279,400,000 558,800,000
419,100,000 419,100,000 838,200,000

10,800,000 10,800,000 10,800,000 10,800,000 43,200,000


45,000,000 45,000,000 90,000,000

2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000


2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000

9,000,000 Nihil 9,000,000 9,000,000 9,000,000 9,000,000 36,000,000


1,000,000 Nihil 1,000,000 1,000,000 1,000,000 1,000,000 4,000,000

-
-
10,000,000 Nihil 10,000,000 10,000,000 10,000,000 10,000,000 40,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
2,000,000 Nihil 2,000,000 2,000,000 2,000,000 2,000,000 8,000,000
5,000,000 Nihil 5,000,000 5,000,000 5,000,000 5,000,000 20,000,000
5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 20,000,000

48,000,000 48,000,000 48,000,000 48,000,000 838,550,000 982,550,000

883,550,000 140,050,000
96000000
48,000,000 48,000,000
Matrik 15. Realisasi Penggunaan Bahan Bakar Cair Triwulan I Tahun 2022

LAPORAN PERSEDIAAN DAN PEMAKAIAN BAHAN BAKAR CAIR


TRIWULAN I TAHUN 2022
PT. ANGIN RIBUT
No. Izin Tangki BBC : ……..Tanggal Solar 50,000.00 Liter
: ……..Tanggal Solar 45,000.00 Liter
: ……..Tanggal Solar 80,000.00 Liter

Persediaan
Jumlah
Sisa Triwulan Ini
No Jenis Bahan Bakar Sisa Triwulan Lalu Penerimaan Jumlah Pemakaian Keterangan
(Liter) (Liter) (Liter) (Liter) (Liter)
1 2 3 4 5 6 7 8
1. Solar (Fuel Diesel) -
2. Bensin/ Gasoline -
3. Minyak Pelumas -
Jumlah - - - - -
Jumlah (liter) Biaya (IDR) / (USD

Bahan Solar Bensin Minyak Bakar lainnya Bahan

Bulan Bakar

lainnya

1 2 3 4 5 6 7 8 9 10 11 12

Januari 200,000 3,000 5,000 2,200,000,000 30,000,000 125,000,000

Februari 300,000 3,000 5,000 3,300,000,000 30,000,000 125,000,000

Maret 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

April 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Mei 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Juni 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Juli 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Agustus 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

September 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Oktober 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

November 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Dessember 350,000 3,000 5,000 3,850,000,000 30,000,000 125,000,000

Total 4,000,000 36,000 60,000.00 44,000,000,000 360,000,000 1,500,000,000


/ (USD

Bahan

Bakar

lainnya

13
Matrik 16. Realisasi Penggunaan Bahan Berbahaya dan Beracun Triwulan I Tahun 2022
LAPORAN PERSEDIAAN DAN PEMAKAIAN BAHAN BERBAHAYA DAN BERACUN
TRIWULAN I TAHUN 2022
PT. ANGIN RIBUT

Persediaan
Jenis Bahan Jumlah Sisa
No Berbahaya dan Sisa Triwulan Penerimaan Pemakaian Triwulan Ini Keterangan
Jumlah
Beracun Lalu
(Liter/Kg) (Liter/Kg) (Liter/Kg) (Liter/Kg) (Liter/Kg)
1 Batrai ( ACCU ) 200 300 500 300 200
2 Oli Mesin 1,500 1,500 3,000 1,500 1,500
Matrik 17. Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan Triwulan I Tahun 2022

Rencana Tahun
Realisasi Program dan Biaya (Rp) Triwulan I Tahun 2022
Satuan Buah/ 2022
Program Keselamatan Pertambangan Kegiatan Triwulan I Triwulan II Triwulan III Triwulan IV Total
/Kali/ Orang Prog Biaya
Prog Biaya Prog Biaya Prog Biaya Prog Biaya Prog Biaya
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. Pertambangan
1. Keselamatan Kerja pertambangan
a. Pengadaan APD dan Alat Keselamatan Kali - -
b. Manajemen Risiko Kegiatan - -
c. Pelaporan Kali - -
d. Pencegahan dan Pengelidikan Kecelakaan - -
2. Kesehatan kerja pertambangan
a. Pemeriksaan kesehatan awal Kali - -
b. Pemeriksaan kesehatan berkala Kali - -
c. Diagnosis dan pemeriksaan penyakit akibat kerja Kali - -
d. Pelaporan - -
e. Penyediaan obat-obatan dan P3K Kali - -
3. Lingkungan kerja pertambangan
a. Pengendalian debu Kali - -
b. Pengelolaan kebersihan Lingkungan Kerja Kali - -
4. Audit Internal SMKP Operasi Pertambangan - -
B Keselamatan Operasi Pertambangan - -
1. Pengelolaan (perawatan dan perbaikan) sarana, prasarana,
Kali - -
instalasi, dan peralatan pertambangan
4. Kompetensi tenaga teknik Kali - -
TOTAL - - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
MATRIK 18. REALISASI PENGGUNAAN USAHA JASA PERTAMBANGAN TRIWULAN I TAHUN 2021

Penanggungjawab
Perizinan Kontrak Penerimaan (Rp) Pembelanjaan (Rp) Tenaga Kerja Operasional
Nama
No Perusahaan Kegiatan Investasi
IUJP (Rp) Asing Surat Pengesahan
Jasa Jasa Masa Nilai Realisasi
Non Inti No. Kontrak (Rp) (Rp) Negara Daerah Lokal Nasional Impot Lokal Nasional
Tgl Tgl Bidang Jabatan Jumlah Nama Nomor Tanggal
Izin Terbit Berakhir Usaha
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1. PT. Carsurin - - - - - - - - - - - - - - - - - - - - - -
MATRIK 19. RENCANA DAN REALISASI TANGGUNG JAWAB SOSIAL DAN LINGKUNGAN TRIWULAN I TAHUN 2022

Realisasi Kendala
Rincian Lokasi Waktu Rencana Ukuran Penyelesaian
No Program Utama PPM Tahunan Pembiayaan yang
Kegiatan PPM Kegiatan Pelaksanaan Pembiayaan Keberhasilan Masalah
Triwulan I dihadapi
1. Pendidikan
a. Beasiswa
b. Pendidikan, Pelatihan Keterampilan dan Keahlian Dasar Semester 2 10,000,000
c. Bantuan Tenaga Pendidik Warga sekitar 10,000,000
d. Bantuan Sarana dan/atau Prasarana Pendidikan Tambang Semester 2 20,000,000
e. Pelatihan dan Kemandirian Masyarakat Semester 2 5,000,000
2. Kesehatan
a. Kesehatan masyarakat sekitar tambang Semester 2
b. Tenaga kesehatan
c. Saranan dan/atau Prasarana Kesehatan Sunat Masal Koninis Semester 2 40,000,000
3. Kemandirian Ekonomi
a. Peningkatan kapasitas dan akses masyarakat setempat dalam usaha kesil menengah
b. Pengembangan usaha kecil dan menengah rakyat sekitar tambang
c. Pemberian kesempatan kepada masyarakat sekitar tambang untuk ikut berpartisipasi Warga sekitar Semester 1
dalam penegmbangan usaha kecil dan menengah sesuai dengan profesinya Catering Tambang dan 2 250,000,000 75,000,000

TOTAL 335,000,000 75,000,000


2.
No

1. IUJP

Jumlah
Perusahaan
Pertambangan (1),

Sub-Kontraktor (3)
Kontraktor (2), dan

0
Juru Derek

0
Juru Ledak dan Petugas Bahan Peledak

0
Juru Las

0
Juru Ukur

0
Juru Bor

0
Ahli Listrik

0
Juru Langsir

0
Penambangan

0
Pengolahan

0
Maintennance

0
Petugas P3K, Tim Tanggap Darurat dan Pemadam Kebakaran
PT. ANGIN RIBUT
TRIWULAN 1 TAHUN 2022

0
Petugas Ventilasi
DATA KOMPETENSI TENAGA KERJA

Petugas Industrial Hygiene


Jenis Kompetensi

Dokter, Juru Rawat dan Paramedis


0

Pengawas Operasional Pertama


0

Pengawas Operasional Madya


0

Pengawas Operasional Utama


0

Petugas Proteksi Radiasi


0

Perencanaan Tambang
0

Rigger dan Operator Pesawat Angkat dan Angkut


0

Loading/ Berthing Master


0

Petugas bahan Kimia


0

Geologi dan Eksplorasi


PENGELOLAAN KESEHATAN KERJA PERTAMBANGAN

NO PROGRAM KETERANGA
1 RENCANA PENGELOLAAN KESEHATAN KERJA

a. Pengelolaan Program Kesehatan Pekerja Tambang


b. Pengelolaan Hygienis dan Sanitasi
c. Pengelolaan Ergonomis
d. Pengelolaan Makanan, Minuman dan Gizi Pekerja Tambang
e. Pengelolaan Diagnosis dan Pemeriksaan Penyakit Akibat Kerja
2. PELAKSANAAN PROGRAN KESEHATAN KERJA

a. Pelaksanaan Program Kesehatan Kerja Tambang


b. Pelaksanaan Hygienis dan Sanitasi
c. Pelaksanaan Ergonomis
d. Pelaksanaan Pengelolaan Makanan, Minuman, dan Gizi Pekerja Tambang
e. Pelaksanaan Diagnosis dan Pemeriksaan Penyakit Akibat Kerja
3. EVALUASI DAN TINDAK LANJUT KESEHATAN KERJA

a. Program Kesehatan Pekerja Tambang


b. Hygienis dan Sanitasi
c. Ergonomis
d. Pengelolaan Makanan, Minuman dan Gizi Pekerja Tambang
e. Pelaksanaan Diagnosis dan Pemeriksaan Penyakit Akibat Kerja
PENGELOLAAN LINGKUNGAN KERJA PERTAMBANGAN

NO PROGRAM KETERANGA
1. Pengendalian Lingkungan Kerja
a. Debu
b. Kebisingan
c. Getaran
d. Pencahayaan
e. Kualitas dan Kuantitas Udara Kerja
f. Radiasi
g. Bahan Kimia
h. Faktor Biologi
i. Kebersihan
2. Pemantauan Lingkungan Kerja
a. Debu
b. Kebisingan
c. Getaran
d. Pencahayaan
e. Kualitas dan Kuantitas Udara Kerja
f. Radiasi
g. Bahan Kimia
h. Faktor Biologi
i. Kebersihan
3. Evaluasi dan Tindaklanjut Program Lingkungan Kerja
a. Debu
b. Kebisingan
c. Getaran
d. Pencahayaan
e. Kualitas dan Kuantitas Udara Kerja
f. Radiasi
g. Bahan Kimia
h. Faktor Biologi
i. Kebersihan
MATRIK 20a. LAPORAN NERACA KEUANGAN

RECANA TAHUN REALISASI TAHUN 2022


URAIAN
2022 TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV
Neraca
Aktiva Lancar
Kas dan Bank 5,967,244,989 1,491,811,247 - - -
Piutang Usaha 13,096,609,383 3,274,152,346 - - -
Pajak dibayar dimuka 4,200,000,000 1,050,000,000 - - -
Piutang Karyawan 100,000,000 25,000,000 - - -
Piutang lain-lain dan biaya dibayar dimuka 3,000,000,000 750,000,000 - - -
Uang Jaminan (Deposito) 3,703,390,617 925,847,654 - - -
Persediaan - - -
Jumlah Aktiva Lancar 30,067,244,989 7,516,811,247 - - -
Aktiva Tidak Lancar - - -
Aktiva tetap 10,816,911,330 2,704,227,833 - - -
Aktiva Lainnya 1,000,000,000 250,000,000 - - -
Aktiva Eksplorasi dan Evaluasi - - -
Beban ditangguhkan - - -
Properti Pertambangan - - -
Amortisasi - - -
Depresiasi (7,567,259,886) (1,891,814,972) - - -
Jumlah Aktiva Tidak Lancar 4,249,651,444 1,062,412,861 - - -
Jumlah Aktiva 34,316,896,433 8,579,224,108 - - -
Hutang dan Modal 15,000,000,000 3,750,000,000 - - -
Kewajiban Jangka Pendek - - -
Hutang Bank - - -
Hutang Akrual - - -
Hutang Afiliasi - - -
Hutang Pajak - - -
Hutang lain-lain - - -
Jumlah Kewajiban Jangka Pendek 15,000,000,000 3,750,000,000 - - -
Kewajiban Jangka Panjang - - -
Hutang Bank - - -
Hutang Pajak 543,200,000 135,800,000 - - -
Provisi untuk Reklamasi dan Penutupan Tambang - - -
Hutang Leasing - - -
Hutang Afiliasi - - -
jumlah Kewajiban Jangka Panjang - - -
Hutang Pemegang Saham - - -
Hutang lain-lain 1,000,000,000 250,000,000 - - -
Jumlah Kewajiban 1,543,200,000 385,800,000 - - -
Modal Saham 25,500,000,000 6,375,000,000 - - -
Modal yang disetor - - -
Laba ditahan 16,816,800,000 4,204,200,000 - - -
lain-lain 3,500,000,000 875,000,000 - - -
Akumulasi Defisit (11,518,562,823) (2,879,640,706) - - -
Ekuitas (2,174,540,744) (543,635,186) - - -
Ekuitas Bersih 32,123,696,433 8,030,924,108 - - -
Jumlah Kewajiban dan Ekuitas 33,666,896,433 8,416,724,108 - - -
Rp25,500,000,000

Rp16,816,800,000

Rp3,500,000,000

(Rp11,518,562,823)

(Rp2,174,540,744)

Rp32,123,696,433
MATRIK 20b. LAPORAN LABA RUGI

REALISASI TAHUN 2022 % JUMLAH REALISASI


RENCANA
No Uraian Satuan TAHUN 2022 TERHADAP
TAHUN 2022
TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV JUMLAH RENCANA TAHUN 2022

1 2 3 4 5 6 7
Produksi Ton 1,000,000 34,100 - - - 34,100 3%
Penjualan Ton 1,000,000 152,900 - - - 152,900 15%
Harga Jual US$ 20.00 53.83 - - - 53.83 269%
A Penjualan US$ 270,000,000,000 111,113,194,500 - - - 111,113,194,500 41%
B Royalti 10% 28,000,000,000 11,111,319,450 - - - 11,111,319,450 40%
C Harga Pokok Penjualan 172,273,497,247 #REF! - - - #REF! #REF!
D Laba kotor 83,160,000,000 20,790,000,000 - - - 20,790,000,000 25%
E Beban Operasi - - -
Beban Penjualan 25,200,000,000 6,300,000,000 - - - 6,300,000,000 25%
Beban umum 22,400,000,000 5,600,000,000 - - - 5,600,000,000 25%
Beban lain-lain 14,000,000,000 3,500,000,000 - - - 3,500,000,000 25%
Jumlah Beban Operasi 61,600,000,000 15,400,000,000 - - - 15,400,000,000 25%
F Laba Operasi 21,560,000,000 5,390,000,000 - - - 5,390,000,000 25%
G. Pendapatan/ (beban) lain- lain - - -
Beban Bunga - - - - - 0%
Laba Selisih Kurs - - - 0%
Pendapatan Bunga - - - 0%
Biaya Lain-lain - - - 0%
Beban Bunga - - - 0%
Rugi Selisih Kurs, Bersih - - - 0%
Pendapatan Bunga - - - 0%
Jumlah Pendapatan/ (beban lain-lain) - - - 0%
H Laba sebelum pajak 21,560,000,000 5,390,000,000 - - - 5,390,000,000 25%
I Biaya pajak penghasilan 4,743,200,000 1,185,800,000 - - - 1,185,800,000 25%
J Laba bersih 16,816,800,000 4,204,200,000 - - - 4,204,200,000 25%
Rp83,160,000,000
MATRIK 20c. HARGA POKOK PENJUALAN

REALISASI TAHUN 2022 TOTAL % TOTAL


RENCANA
NO URAIAN REALISASI REALISASI
TAHUN 2022
TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TAHUN 2022 TAHUN 2022

1 2 3 4 5 6 7
1. Biaya Produksi dan Pengangkutan 86,108,400,000 - - - - - 0%
2. Biaya Bahan Material 23,364,400,000 - - - - - 0%
3. Biaya Bahan Bakar 45,860,000,000 #REF! - - - #REF! #REF!
4. Pemeliharaan dan suku cadang 3,376,800,000 844,200,000 - - - 844,200,000 25%
5. Biaya lain-lain (biaya terkait produksi)/ Pemasaran 4,423,608,000 1,105,902,000 - - - 1,105,902,000 25%
6. Konsultan/ Eksplorasi dan belanja lainnya 8,500,000,000 2,125,000,000 - - - 2,125,000,000 25%
Subtotal Biaya Tambang 171,633,208,000 #REF! #REF! #REF!
7. Biaya Pengolahan dan Pemurnian - - - - - - 0%
8. Depresiasi 640,289,247 160,072,312 - - - 160,072,312 25%
9. Amortisasi - - - - - 0%
Sub Total 640,289,247 160,072,312 - - - 160,072,312 25%
Total Biaya Produksi 172,273,497,247 #REF! - - - #REF! #REF!
10. Persediaan Awal - - - - - 0%
11. Persediaan Akhir - - - - - 0%
Total HPP 172,273,497,247 #REF! #REF! #REF!
MATRIK 20d. LAPORAN ARUS KAS

REALISASI TAHUN 2021 TOTAL % REALISASI


RENCANA
URAIAN REALISASI TAHUN
TAHUN 2021 TRIWULAN TRIWULAN TRIWULAN TAHUN 2021
TRIWULAN I 2021
II III IV
1 2 3 4 5 6 7

Arus Kas dari Aktivitas Operasi

Laba (Rugi) Bersih tahun Berjalan 16,816,800,000 4,204,200,000 - - - 4,204,200,000 25%


Penyesuaian dari Laba bersih untuk menentukan kas
- - - - - - 0%
yang diperoleh dari operasi"
- Penyusutan 640,289,247 160,072,312 - - - 160,072,312 25%

- Amortisasi - - - - 0%
- Pembebanan untuk program pensiun yang melebihi
- - - - 0%
pembayaran
- Lain-lain - - - - 0%
Pengurangan penambahan Modal Kerja non kas yang
- - - - 0%
berhubungan dengan operasi
- Pengurangan (penambahan) Piutang Usaha 13,096,609,383 3,274,152,346 - - - 3,274,152,346 25%

- Pengurangan (Penambahan) Piutang lain-lain 19,017,689,786 4,754,422,447 - - - 4,754,422,447 25%

- Pengurangan (Penambahan) Persediaan - - - - 0%

- Pengurangan (Penambahan) Biaya dibayar di muka 4,653,345,001 1,163,336,250 - - - 1,163,336,250 25%

- Penambahan (Pengurangan) Hutang Usaha - - - - 0%

- Penambahan (Pengurangan) Hutang Pajak 541,328,261 135,332,065 - - - 135,332,065 25%

- Penambahan (Pengurangan) Hutang lain-lain 2,500,000,000 - - - - 0%


- Penambahan (Pengurangan) Biaya yang masih harus
- - - - 0%
dibayar
- Piutang Karyawan 120,000,000 30,000,000 - - - 30,000,000 25%
- Penambahan (Pengurangan) Pendapatan diterima
- - - - 0%
dimuka
- Pengurangan (Penambahan) Kewajiban lancar lainnya - - - - 0%

Arus Kas Netto digunakan untuk aktivitas Operasi 19,238,712,910 4,809,678,228 - - - 4,809,678,228 25%

Arus Kas dari Aktivitas Investasi - - - - 0%

- Pengurangan (Penambahan) Aktiva Tetap 2,000,000,000 500,000,000 - - - 500,000,000 25%

- Pengurangan (Penambahan) Aktiva lain-lain - - - - 0%

Kas dipakai untuk kegiatan Investasi - - - - 0%

Arus Kas dalam Aktivitas Pendanaan - - - - 0%

- Pengurangan (Penambahan) Deposito 1,586,231,000 396,557,750 - - - 396,557,750 25%

- Penambahan (Pengurangan) Hutang Pemegang Saham 9,148,863,450 2,287,215,863 - - - 2,287,215,863 25%

- Penambahan (Pengurangan) Hutang Afiliasi - - - - 0%

- Penambahan (Pengurangan) Hutan lain-lainnya 800,000,000 200,000,000 - - - 200,000,000 25%

- Pembayaran Deviden - - - - 0%

- Koreksi ke Laba ditahan - - - - 0%

- Tambahan Modal Disetor - - - - 0%


Arus Kas Netto yang digunakan untuk Aktivitas
9,935,094,450 2,483,773,613 - - - 2,483,773,613 25%
Pendanaan
KENAIKAN ATAU PENURUNAN NETTO KAS DAN BANK 4,711,058,460 1,177,764,615 - - - 1,177,764,615 25%

KAS DAN BANK AWAL TAHUN 120,763,136 30,190,784 - - - 30,190,784 25%

KAS DAN BANK AKHIR TAHUN 4,831,821,596 1,207,955,399 - - - 1,207,955,399 25%


MATRIK 23e. LAPORAN RENCANA DAN REALISASI INVESTASI TAHUN 2022

REALISASI INVESTASI TIAP BULAN TAHUN 2022 KENDALA HAMBATAN


RENCANA DALAM DALAM
NO URAIAN INVESTASI KEGIATAN KEGIATAN
TAHUN 2022 JAN FEB MAR APR MEI JUN JUL AGUS SEP OKT NOV DES INVESTASI INVESTASI

Kegiatan Investasi 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Bangunan - - - -
2 Pradarana
3 Mesin
4 Peralatan
5 Kapal
6 Kendaraan dan Angkutan
7 Alat-alat dan Perabotan
8 Eksplorasi
9 Aktiva tidak berwujud 20,000,000,000 - - -
PENERIMAAN NEGARA

REALISASI TAHUN 2021


RENCANA TAHUN TOTAL REALISASI % TOTAL REALISASI
NO URAIAN
2021 TAHUN 2020 TAHUN 2020
TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV
PENERIMAAN NEGARA 1 2 3 2 2 4 5
a PAJAK
PPH Pasal 21 300,000,000 75,000,000 - - - 75,000,000 25%
PPH Pasal 22 4,200,000,000 1,050,000,000 - - - 1,050,000,000 25%
PPH Pasal 23/26 1,722,168,000 430,542,000 - - - 430,542,000 25%
PPH Pasal 25 550,000,000 137,500,000 - - - 137,500,000
PPH Pasal 29 543,200,000 135,800,000 - - - 135,800,000 25%
PPN Masukan 13,196,840,000 3,299,210,000 - - - 3,299,210,000 25%
PPN Keluaran - - - - - - 0%
Pajak-pajak Daerah - - - - - - 0%
Jumlah Pajak 20,512,208,000 5,128,052,000 - - - 5,128,052,000 25%
b Non Pajak -
Dead Rent 87,300,000 21,825,000 - - - 21,825,000 25%
SPW3D - - - -
Advance Payment - - - -
BBN - - - -
Jumlah Non Pajak 87,300,000 21,825,000 - - - 21,825,000 25%
JUMLAH PENERIMAAN NEGARA 20,599,508,000 5,149,877,000 - - - 5,149,877,000 25%
REALISASI TAHUN 2021
NO URAIAN RENCANA TAHUN TOTAL REALISASI % TOTAL REALISASI
2021 TAHUN 2021 TAHUN 2021
TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV

1 2 3 4 5 6 7
Operasional
A Penghasilan Karyawan 1,000,000,000 250,000,000 - - - 250,000,000 0.25
B Kesejahteraan Karyawan 100,000,000 25,000,000 - - - 25,000,000 0.25
C Komisi Penjualan - - - - - 0
D Pemeliharaan Kantor 200,000,000 50,000,000 - - - 50,000,000 0.25
E Depresiasi dan Amortsasi - - - - - 0
F Promosi dan Publikasi - - - - - 0
G Sewa Alat 36,966,000,000 9,241,500,000 - - - 9,241,500,000 0.25
H Pengiriman Barang, Perjalanan dan Komunikasi 45,000,000 11,250,000 - - - 11,250,000 0.25
I Konsultan - - - - - 0
J Keuangan - - - - - 0
K Umum dan Administrasi 550,000,000 137,500,000 - - - 137,500,000 0.25
L Pengembangan Masyarakat 450,000,000 112,500,000 - - - 112,500,000 0.25
M Biaya Lain-lain 600,000,000 150,000,000 - - - 150,000,000 0.25
Sub Total (1) 39,911,000,000 9,977,750,000 - - - 9,977,750,000 0.25
II Operasional-Site - 0
N Penghasilan Karyawan 10,000,000,000 2,500,000,000 - - - 2,500,000,000 0.25
O Pemeliharaan Kantor 400,000,000 100,000,000 - - - 100,000,000 0.25
P Pengiriman Barang, Perjalanan dan Komunikasi 50,000,000 12,500,000 - - - 12,500,000 0.25
Q Umum dan Administrasi 30,000,000 7,500,000 - - - 7,500,000 0.25
R Biaya Analisa Mineral Logam 1,200,000,000 300,000,000 - - - 300,000,000 0.25
S Biaya Lain-lain 500,000,000 125,000,000 - - - 125,000,000 0.25
Sub Total (2) 12,180,000,000 3,045,000,000 - - - 3,045,000,000 0.25
III Belanja Modal - - 0
T Bangunan 250,000,000 62,500,000 - - - 62,500,000 0.25
U Sarana dan Prasarana 187,500,000 46,875,000 - - - 46,875,000 0.25
V Mesin 750,000,000 187,500,000 - - - 187,500,000 0.25
W Peralatan 750,000,000 187,500,000 - - - 187,500,000 0.25
X Kendaraan dan Angkutan - - - - - 0
Y Peralatan Eksplorasi 875,000,000 218,750,000 - - - 218,750,000 0.25
Sub Total (3) 2,812,500,000 703,125,000 - - - 703,125,000 0.25
Jumlah = (1) + (2)+(3) 54,903,500,000 13,725,875,000 - - - 13,725,875,000 0.25