No Location EQNUM WONUM STATUS

EDC AZEODRYING,PURIFICATION&CHECK
1 C22 TANK 21009650 PREAP1

EDC AZEODRYING,PURIFICATION&CHECK
2 PI2222A
TANK 21028151 WPCOND

3 EDC PLANT UPS-E2 21023616 WPCOND

4 EDC PLANT BDC-E01 21033383 WMATL

5 EDC PLANT TR-02 22002232 WPCOND

6 EDC PLANT MCC-HTDC 22002260 WPCOND

7 EDC PLANT MCC-LTDC 22002814 PREAP1

8 EDC PLANT MCC-LTDC 22002893 WPCOND

9 EDC PLANT FV393 22002894 PREAP1

10 EDC PURIFICATION PCV0643 22000811 PREAP1

11 EDC UTILITY LS-EUTIED 21030775 PREAP1

12 EDC UTILITY CT408A 22001475 WPCOND

13 ETHYLENE VAPORIZERTCV0701 22000126 PREAP1

14 ETHYLENE VAPORIZERLCV0702 21033991 WPCOND

15 ETHYLENE VAPORIZER XV0701 22002840 WPCOND

16 HTDC REACTOR FI0513 21033989 WPCOND

17 HTDC REACTOR FIQ0521 21016989 WPCOND

18 HTDC REACTOR PCV0522 22002231 WMATL

Page 1
Sheet1

DESCRIPTION

TA EDC 2021 Install dp pressure for indicating pressure drop per bed packing MOC-EDC/VCM-2019-796

Install PG P22A, Dilapangan tidak ada indikasi pressure

TA EDC 2023 saat TA normalisasi, display blinking, ada temuan CARD yg rusak, please diganti

Please replace battery EDC back up UPS, sesuai rekomendasi

Shutdown CA-EDC February 2022 Check Trafo-2 HTDC, indicated oil leakage

Shutdown CA-EDC February 2022 Reposisi trigger HTC power failure dari UVR MCC NMDB ke MCC Eaton d

Equipment Replacement EDC 2022 MCC-LTDC (CC-EDC-22-07)

Install UVR di MCC LTDC (material ready)

Please Repair positioner & PG regulator leak FCV0395

Shutdown CA-EDC February 2022 Leak at PCV0643 (gland packing or gasket), because rust is always come

Shutdown CA-EDC February 2022 PCV9423 indikasi bocor steam pada flange gasket. Penggantian jika diperluk

Shutdown CA-EDC February 2022: indikasi running-stop cooling tower CT408A&B belom aktif

Please replace new one TCV0701, temuan TA2021 (rekomendasi IER/2021/68)

Shutdown CA-EDC February 2022 Replace regulator LCV0702. Kondisi regulator heavy corroded. Critical contr

Please repair Regulator XV0701 (Material ready office)

Shutdown CA-EDC February 2022 Pengechekan & Cleaning rotameter flor sealing R051 FI0513

FIQ0521, vortex flowmeter rusak/tidak ada pembacaan di DCS

Shutdown CA-EDC February 2022 PCV0522 leak in stem gland packing control valve. Sudah berulang kali b

Page 2
Sheet1

REPORTDATE STATUSDATE WOPM1 WORTS3

4/21/2021 15:59 10/8/2021 13:49 INS B-EDC

10/25/2021 9:46 11/4/2021 13:23 INS B-EDC

9/8/2021 20:02 2/8/2022 15:07 ELT B-EDC

12/20/2021 10:40 1/10/2022 9:11 ELT B-EDC

1/27/2022 12:52 2/8/2022 9:36 ELT B-EDC

1/27/2022 15:36 2/9/2022 9:46 ELT B-EDC

1/31/2022 14:29 1/31/2022 14:43 ELT B-EDC

2/2/2022 14:30 2/9/2022 9:49 ELT B-EDC

2/2/2022 14:37 2/3/2022 10:20 INS B-EDC

1/13/2022 17:16 1/14/2022 8:45 INS B-EDC

11/23/2021 14:16 12/14/2021 14:55 ELT B-EDC

1/19/2022 13:45 2/9/2022 9:46 ELT B-EDC

1/4/2022 10:39 1/4/2022 13:35 INS B-EDC

12/27/2021 12:19 1/4/2022 7:48 INS B-EDC

2/2/2022 9:27 2/9/2022 14:07 INS B-EDC

12/27/2021 11:27 2/9/2022 14:08 INS B-EDC

7/22/2021 11:03 11/25/2021 8:12 INS B-EDC

1/27/2022 12:50 2/11/2022 8:56 INS B-EDC