Professional Documents
Culture Documents
EDC AZEODRYING,PURIFICATION&CHECK
1 C22 TANK 21009650 PREAP1
EDC AZEODRYING,PURIFICATION&CHECK
2 PI2222A
TANK 21028151 WPCOND
Page 1
Sheet1
DESCRIPTION
TA EDC 2021 Install dp pressure for indicating pressure drop per bed packing MOC-EDC/VCM-2019-796
TA EDC 2023 saat TA normalisasi, display blinking, ada temuan CARD yg rusak, please diganti
Shutdown CA-EDC February 2022 Check Trafo-2 HTDC, indicated oil leakage
Shutdown CA-EDC February 2022 Reposisi trigger HTC power failure dari UVR MCC NMDB ke MCC Eaton d
Shutdown CA-EDC February 2022 Leak at PCV0643 (gland packing or gasket), because rust is always come
Shutdown CA-EDC February 2022 PCV9423 indikasi bocor steam pada flange gasket. Penggantian jika diperluk
Shutdown CA-EDC February 2022: indikasi running-stop cooling tower CT408A&B belom aktif
Shutdown CA-EDC February 2022 Replace regulator LCV0702. Kondisi regulator heavy corroded. Critical contr
Shutdown CA-EDC February 2022 Pengechekan & Cleaning rotameter flor sealing R051 FI0513
Shutdown CA-EDC February 2022 PCV0522 leak in stem gland packing control valve. Sudah berulang kali b
Page 2
Sheet1
Page 3