GENERAL NOTES:

r
Vo

Vo

LAP SPLICE & ANCHORAGE LENGTH TABLE

Vo

1 DETAIL
SCALE NTS

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
1
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
ROOF LEVEL
TYPICAL GIRDER DETAILS

CLOSED TIES
CL COLUMN CL COLUMN CL COLUMN

@ 100mm O.C.
LC LI L2
0.75LC OR 0.3LI 0.3LI OR 0.75LC 0.3LI OR 0.3L2 0.3L2 OR 0.3L1 SPLICE ZONE FOR 0.3L2
GIRDER TOP BARS
STRUCTURAL NOTES:

Y2
1. SEE TABLE OF LAP SPLICE & ANCHORAGE
SPLICE LENGTH SPLICE LENGTH LENGTHS SHOWN ON SHEET.
SEE TABLE SEE TABLE 2. LAP SPLICE SHALL BE LOCATED ONLY WITHIN
CONTINUOUS CONTINUOUS CONTINUOUS THE LAP SPLICE ZONE.
TOP BARS TOP BARS WEB BARS
TOP BARS AT
E.Q. E.Q. E.Q. E.Q. 3. TOP & BOTTOM BARS MAY BE LAP SPLICED

CLOSED TIES
EXTRA EXTRA EXTRA
CANTILEVER'S
TOP BARS TOP BARS TOP BARS ONLY ON ONE LOCATION FOR EACH STRING

H2
@ 100mm O.C.
DISCONTINUOUS
AT SUPPORT AT SUPPORT AT SUPPORT
END OF BEAMS
4. CLOSED HOOPS WITH A 135 BEND SHALL BE
H
SPACED AT 100 O.C. MAXIMUM AT A DISTANCE

D
2D FROM THE FACE OF THE SUPPORT, FIRST
STIRRUP SHALL 5D FROM THE FACE OF THE
EXTRA 2D E.Q. E.Q. CONTINUOUS 2D E.Q. E.Q. CONTINUOUS SUPPORT.
BOTTOM BARS
AT SUPPORT NO SPLICE BOTTOM BARS
NO SPLICE BOTTOM BARS 5. SPACING OF STIRRUPS ON LAP SPLICE SHALL
10

0.125LI 0.125LI 0.125L2 0.125L2 BE SPACED @ 100MM O.C. MAXIMUM.


d

350mm
BOTTOM BARS EXTRA EXTRA
m

AT CANTILEVER'S BOTTOM BARS BOTTOM BARS 6. AT INTERIOR SUPPORT (CONTINUOUS END)


in

AT MIDSPAN
.

DISCONTINUOUS END AT MIDSPAN


PROVIDE LARGER SIZE AND NUMBER OF TOP
50MM MAX.

Y2
AND BOTTOM BARS FROM ADJACENT SPANS.

H
AT SUPPORT
7. NO SPLICE SHALL BE ALLOWED 2D FROM THE

CLOSED TIES
FACE OF THE SUPPORT. FLOOR LEVEL

50

@ 100mm O.C.
HOOP REINFORCEMENT HOOP REINFORCEMENT HOOP REINFORCEMENT
SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE
DISCONTINUOUS CONTINUOUS END CONTINUOUS END DISCONTINUOUS END
FREE END "I" OR "J" "I" OR "J"

50
(SEE REMARKS) (SEE REMARKS)

Y1
D

TYPICAL GRAVITY BEAM DETAILS


JOINT REINF.

CL EXTERIOR SUPPORT CL INTERIOR SUPPORT CL INTERIOR SUPPORT


L1 L2 L3

CLOSED TIES
LAP SPLICE
1.3LD

H1
@ 100mm O.C.
0.3L1 TOP BAR 0.3L2 OR 0.3L1 0.3L2 OR 0.3L1 TOP BAR 0.3L2 OR 0.3L3 0.3L3 OR 0.3L2
SPLICE ZONE (TYP) GREATER GREATER SPLICE ZONE (TYP) GREATER GREATER
Sh
D

LAP SPLICE
1.3LD
EXTRA CONTINUOUS
TOP BARS TOP BARS
COLUMN TIES AS

TOP BARS TOP BARS

@ 100mm O.C.
CLOSED
TIES
.

Y1
F.F.L.

50
GROUND
BEAM
Sh

0.125L1 0.125L1 0.125L2 0.125L2 0.125L3


D

EXTRA BOTTOM
JOINT REINF.

EXTRA BOTTOM SIDE BARS (TYP) SEE

ARCHITECTURAL
BARS BARS
SCHEDULE FOR SIZE

VERIFY
CONTINUOUS CONCRETE COLUMN CONCRETE COLUMN
BOTTOM BARS OR BEAM (TYP) OR BEAM (TYP) AND NUMBER
BOTTOM BAR BOTTOM BAR
SPLICE ZONE (TYP) SPLICE ZONE (TYP)
N.G.L.
D

FOR SIZE AND SPACING OF


DISCONTUOUS END CONTINUOUS END CONTINUOUS END
STIRRUPS SEE REINFORCED
"I" OR "J" "I" OR "J"
CONCRETE BEAM SCHEDULE
(SEE REMARKS) (SEE REMARKS)

I. STRIPPING OF FORMS

MINIMUM
VERIFY
J. REMOVAL OF SHORES AND SHORING
NOTE: SEE TIE SCHEDULE

1. FORMS SHALL RESULT IN FINAL STRUCTURE THAT CONFORMS TO 1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE
SHAPES, LINES AND DIMENSIONS OF THE MEMBERS AS REQUIRED BY ADEQUATE SHORING AND BRACING OF THE STRUCTURE FOR ALL
H (CLEAR HEIGHT OF COL.)

THE DESIGN DRAWINGS AND SPECIFICATIONS. LOADS THAT MAYBE IMPOSED UNDER CONSTRUCTION.

"T"
2. FORMS SHALL BE REMOVED IN SUCH A MANNER AS NOT TO IMPAIR 2. STRUCTURAL ELEMENT MUST ATTAINED SUFFICIENT STRENGTH
.

SAFETY AND SERVICEABILITY OF THE STRUCTURE. OR DEVELOPED DESIGN PROPERTIES REQUIRED TO SUPPORT ALL
WITHIN CENTER

L/4
LOADS, LIMIT DEFLECTIONS AND CRACKING BEFORE REMOVAL OF
STRUCTURAL ELEMENT SHORES.
PERIOD NOTES:
3. REMOVAL OF SHORES ARE NOT ALLOWED WITHIN THE GIVEN 1. Y = MAX OF FF.
A. H/6
CURING PERIOD WHEN ADDITIONAL LOADS ARE IMPOSED, UNLESS B. 450mm
1. BEAM/GIRDER 14 DAYS
JT. REINF.

ANAYSIS INDICATES ADEQUATE STRENGTH TO SUPPORT SUCH C. MAX COLUMN DIMENSION


2. SPLICES ARE PERMITTED ONLY WITHIN THE
ADDITIONAL LOADS. CENTER HALF OF COLUMN HEIGHT (H)
2. SUSPENDED SLAB 8 DAYS 4. INSTALLATION OF RESHORES IS NECESSARY FROM ANY PART OF 3. STAGGER BAR SPLICES BY 600mm OR MORE
4. PROVIDE TIES @100mm O.C. (MAX.) OVER THE
STRUCTURE UNDER CONSTRUCTION. FULL LAP SPLICE LENGTH
0.165L SPLICE 5. SPECIAL TIES @ THE BEAM COL. JOINT TO
3. COLUMN/SHEARWALL 2 DAYS CONFORM TO THE SAME CONFIGURATION OF TIES
0.22L AS INDICATED IN THE SCHEDULE OF COLUMNS
6. NO OF SPLICES BARS AT ONE LEVEL SHALL NOT
4. RETAINING WALL 18 HOURS EXCEED ONE-THIRD (1/3) OF THE TOTAL NO. OF
COLUMN VERTICAL BARS

5. FOUNDATION 24 HOURS

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
2
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
G. STRUCTURAL STEEL NOTES
CHB REINFORCING DETAILS CHB WALL OPENING DETAILS 1. STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISIONS
OF AISC SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS 1989 - 9TH
30 BAR DIA. 30 BAR DIA.

VERIFY DEPRESSION
EDITION.
12mm GAP
ELASTIC SEALANT 300 300 STRUCTURAL STEEL MEMBERS _____________________ ASTM A-36, GR 36 OR A992

D=FOR BEAM
W/ POLYURETHENE BACKING ROD Fy = 248 MPa (36 ksi)
LC PURLIN _____________________________________ Fy = 248 MPa (36 ksi)
STEEL PLATES __________________________________ Fy = 248 MPa (36 ksi)

0
60
2. ALL BOLTS, NUTS AND WASHERS SHALL CONFORM TO A325 UNLESS OTHERWISE INDICATED. ANCHOR BOLTS

0
SHALL LIKEWISE BE OF EQUAL STRENGTH AS A325 BOLTS OF THE SAME.

60
3. ALL WELDS SHALL BE IN ACCORDANCE WITH AWS STRUCTURAL WELD CODE D1-1 LATEST REVISION FOR
SHIELDING METAL ARC WELDING PROCESS, ELECTRODES E-70 SHALL CONFORM TO AWS AS-1 OR LATEST
EDITION. SUBMERGED ARC WELDING PROCESS MAY BE USED AT THE OPTION OF FABRICATOR UPON THE
APPROVAL OF ENGINEER.
4. ALL WELDED CONNECTIONS MUST DEVELOP THE FULL STRENGTH OF THE MEMBERS.
5. FABRICATION AND WELDING SHALL BE GOVERNED BY APPLICABLE PROVISIONS OF THE LATEST AISC OR AWS D=FOR BEAM
STANDARDS.
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CHECK ACTUAL FIELD CONDITIONS PRIOR TO
RC COLUMN 30 BAR DIA.

60
CHB WALL PREPARATION OF FABRICATION (SHOP) DRAWINGS.

0
7. THE CONTRACTOR SHALL PREPARE FABRICATION (SHOP) DRAWINGS OF ALL STRUCTURAL STEEL
OR WALL MEMBERS BASED ON THE DESIGNS FOR APPROVAL OF THE ENGINEER PRIOR TO FABRICATION.
8. ALL DOUBLE-ANGLE STRUCTURAL MEMBERS SHAL BE PROVIDED WITH GUSSET PLATES AS SHOWN IN THE
END BLOCK DRAWINGS.
9. ALL EXPOSED STRUCTURAL STEEL MEMBERS SHALL RECEIVE AT LEAST ONE COAT OF RED LEAD PAINT.

CONSTRUCTION JOINT DETAIL

SUPPORTED WALL DETAILS


40

t/3
t/3

t
t/3
400

PROVIDE TOP BEAM


2-12MM TOP BARS

200
2-12MM BOT BARS W/ 10mmØ
STIRRUPS SPACES 1@50mm
AND REST @0.15m O.C.
VERIFY ARCHITECTURAL

PIPE SLEEVE DETAIL

D/3

D/3

D
D/3

H/3

D
H
SLAB ON GRADE CONSTRUCTION JOINT 2-12mmØ CLOSED
2-16mmØ DIAGONAL BARS STIRRUPS (TYPICAL)
400

400

PER CORNER L = 80Ø


STRUCT. SEALANT BITUMINOUS FILLER
12
L

"t"
L/4 L/4

100
PREMOULDED JOINT FILLER

L/2
NOTE:
SUPPORTED WALL DETAILS GRAVEL BASE SUBGRADE COMPACTED TO 95% OF MAXIMUM
PIPE SLEEVES ARE
ONLY ALLOWED ON
6 MIL. POLYETHYLENE MOISTURE @ OPTIMUM CONTENT (MAX. DEPTH SHADED AREA
VAPOR BARRIER OF COMPRESSED FILL = 200/LAYER)
F.D.T REQUIRED
NOTE:
SLAB ON GRADE EXPANSION JOINT 1. CENTER TO CENTER SPACING OF PIPE SLEEVES "S" SHALL IN NO CASE BE LESS THAN 3 TIMES THE SLEEVE
400

DIAMETER.
STRUCT. SEALANT BITUMINOUS FILLER 2. PIPE SLEEVES OF ALUMINUM SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE.
12 3. PIPE SLEEVES SHALL NOT BE LARGER IN OUTSIDE DIMENSION THAN 1/3 THE OVERALL DEPTH OF THE BEAM.
F.F.L.
4. PIPE SLEEVES SHALL BE LOCATED WITHIN THE MIDDLE THIRD OF THE BEAM DEPTH.

25
"t"

5. AVOID LOCATION OF MAXIMUM STRESSES.


6. CONTRACTOR SHALL SUBMIT PIPE SLEEVE LOCATION LAYOUT FOR APPROVAL OF THE STRUCTURAL ENGINEER OF
100
400

RECORD, PLACE SLEEVE AT LEAST 2H FROM THE FACE OF THE SUPPORT.


7. NO CONCRETE POURING SHALL BE MADE WITHOUT OUR APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD.

H. CURING NOTES
GRAVEL BASE SUBGRADE COMPACTED TO 95% OF MAXIMUM 1. CONCRETE (OTHER THAN HIGH EARLY STRENGTH) SHALL BEKEPT IN A MOIST CONDITION
6 MIL. POLYETHYLENE MOISTURE @ OPTIMUM CONTENT (MAX. DEPTH FOR AT LEAST FIRST SEVEN (7) DAYS AFTER PLACEMENT.
NOTE:
VAPOR BARRIER OF COMPRESSED FILL = 200/LAYER) 2. HIGH EARLY STRENGTH CONCRETE SHALL BE KEPT IN A MOIST CONDITION FOR AT LEAST
1. THIS REINFORCEMENT IS IN ADDITION TO F.D.T REQUIRED FIRST THREE (3) DAYS AFTER PLACEMENT.
ANY REINFORCEMENT INDICATED ON PLANS.
3. USED OF WET BURLAP, FOG SPRAYING AND CURING COMPOUNDS ARE APPROVED CURING
NOTE: METHODS.
1. ALL SURFACES OF CONSTRUCTION JOINTS SHALL BE ROUGHENED TO 6MM. AMPLITUDE
2. ALL CONSTRUCTION JOINTS SHALL BE CLEANED TO REMOVE DUST, CHIPS, OR OTHER FOREIGN MATTERS
PRIOR TO PLACING OF ADJACENT CONCRETE.
3. THE CONTRACTOR SHALL SUBMIT THE PROPOSED LOCATIONS OF CONSTRUCTION JOINTS FOR THE
APPROVAL OF STRUCTURAL ENGINEER BEFORE STARTING CONSTRUCTION.

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
3
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
CONSTRUCTION NOTES
A. GENERAL NOTES
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR
STANDARD HOOKS, ALL GRADES

d
NOTED MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
2. THE CONTRACTOR SHALL EXAMINE THE DRAWINGS AND SHALL NOTIFY THE ENGINEER/ARCHITECT OF ANY F. MASONRY WORKS
DISCREPANCIES HE MAY FINDBEFORE PROCEEDING WITH THE WORK, OR DURING CONSTRUCTION. 1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT NOT TO EXCEED 80 PCF. FOR STANDARD HOOKS
BAR SIZE FINISHED BEND
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING & BRACINGS OF LOAD BEARING TYPE, TYPE CONCRETE BLOCKS, A MINIMUM COMPRESSIVE STRENGTH OF 6.90 MPA SHALL BE
DEVELOPED. (GR. 60) DIAMETER, D 90° 180°
THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION.
4. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, 2. PROVIDE 1-∅16 VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS AND EACH SIDE OF OPENINGS. (MM) X (MM) Y (MM)
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS 3. LINTEL BEAMS SHALL BEAR AT LEAST 8 INCHES (200 MM) ON EACH SIDE OF MASONRY WALL OPENING.
APPROVAL BEFORE FABRICATION. 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS. 10mm∅ (#3) 60 180 100
5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN CHECK WITH MECHANICAL
AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES, ETC., TO BE EMBEDDED IN CONCRETE. WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT
12mm∅ (#4) 72 216 120
180 DEG STRUCTURAL
6. INSPECTION - ALL CONSTRUCTION AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION, EXAMINATION 8 IN. (200 MM) ∅12 @ 600 MM ∅10 @ 600 MM
AND TESTING BY THE ENGINEER. THE ENGINEER SHALL HAVE THE RIGHT REJECT DEFECTIVE MATERIALS AND 6 IN. (150 MM) ∅12 @ 600 MM ∅10 @ 600 MM
WORKMANSHIP OR REQUIRE ITS CORRECTION. 4 IN. (100 MM) ∅10 @ 600 MM ∅10 @ 600 MM 16mm∅ (#5) 96 288 160
7. ALL SLABS, BEAMS, GIRDERS AND OTHER STRUCTURAL ELEMENTS WHICH ARE NOT INDICATED, DETAILED,
5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 40 BAR DIAMETERS WHERE SPLICE DOWELS FROM FOOTING 20mm∅ (#6) 120 360 200

d
DESIGNATED OR INADVERTENTLY OMITTED BUT ARE NECESSARY TO BE COORDINATED WITH THE
ARCHITECTURAL AND OTHER ENGINEERING PLANS AS WELL AS TO COMPLETE THE STRUCTURAL WORK OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 40 BAR DIAMETERS, AND DOWELS TO MATCH.
IN ACCORDANCE WITH THE INTENT OF THE PLANS AND SPECIFICATIONS SHALL BE BROUGHT UP DURING 6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUT
22mm∅ (#7) 132 396 220
PRE-BIDS/MEETINGS/NEGOTIATIONS. IT IS UNDERSTOOD THAT THE CONTRACTOR HAS PROVIDED AND INCLUDED (REFER TO SPECIFICATIONS).
ALL THESE ITEMS IN THEIR BID.
25mm∅ (#8) 150 450 250
ITEMS COVER
B. FOUNDATION NOTES
1. SAFE BEARING CAPACITY IS _____ kPa. CONCRETE CAST AGAINST EARTH 75mm 28mm∅ (#9) 224 560 336
a. PILE CAPACITY 110 TONS.
b. BOTTOM OF FOOTINGS SHOULD BE SOLID GROUND. ACTUAL DEPTH TO BE APPROVED BY THE ENGINEER. EXPOSED TO EXTERIOR OR WEATHER 50mm 32mm∅ (#10) 256 640 384
c. SOIL BEARING CAPACITY SHALL BE INCREASED BY 33% WHEN COMBINATION WITH 90 DEG 90 DEG 135 DEG
SEISMIC OR WIND LOAD. FORMED SURFACE BELOW GRADE 50mm
36mm∅ (#11) 288 720 432
2. ALL COLUMN FOOTINGS SHALL REST ON 0.10m THICK WELL COMPACTED GRAVEL BASE COURSE.
3. BACKFILL SHALL BE PACED IN 0.20m LAYERS AND EACH LAYER SHALL BE COMPACTED TO SLAB ON GRADE 50mm
95%MAXIMUM DRY DENSITY.
4. WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF EMBEDMENT EXCAVAVATE TO FIRM LAYER OR TO
COLUMNS/SHEARWALLS AND BEAMS 40mm STANDARD HOOKS STIRRUPS AND TIE-HOOKS
MAXIMUM OF 0.10m AND REPLACE LOOSE/SOFT MATERIALS UNDERNEATH THE FOOTING WITHIN THE FOOTING
STRUCTURAL SLABS TOP AND BOTTOM (INTERIOR) 25mm
AREA PLUS 1/2 OF THE DEPTH OF EXCAVATED SOFT MATERIAL ON ALL SIDES WITH SELECTED SAND/GRAVEL
BACKFILL MATERIALS COMPACTED AS DESIRED BY THE ENGINEER.
5. THE STRUCTURAL ENGINEER-OF-RECORD, UPON NOTIFICATION, SHALL CONDUCT THOROUGH INSPECTION OF
R.C. WALLS 20mm CONCRETE HOLLOW BLOCKS REINFORCEMENT CHB STIFFENER DETAILS
FOUNDATION WORKS AFTER EXCAVATION BEFORE FOOTINGS ARE COMPLETED. NO REINFORCING STEEL OR
FORMWORKS SHALL BE PLACED PRIOR TO INSPECTION. CONCRETE POURING OF THE FOUNDATION SYSTEM 6. WELDING OF REINFORCING STEEL IS NOT PERMITTED UNLESS MATERIAL TEST RESULT PROVES THAT THE BAR IS NOTE:
SHALL NOT BE ALLOWED WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER- WELDABLE. PROVIDE VERTICAL STIFFENERS EVERY 3000mm O.C. MAXIMUM
ON-RECORD. 7. SHOP DRAWINGS: THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REINFORCING STEEL PREPARED IN PROVIDE HORIZONTAL STIFFENERS EVERY 3000mm O.C. MAXIMUM
ACCORDANCE WITH ACI 315. INDICATE BENDING DIAGRAM, ASSEMBLY DIAGRAM, SPLICING AND LAPS OF RODS
C. SLAB-ON-GRADE NOTES AND SHAPES DIMENSIONS AND DETAILS FOR REINFORCING BARS.
1. THE SOIL, SUBGRADE AND FILL LAYERS BELOW ALL
SLABS-ON-GRADE, PAVING AND PIT SLABS SHALL BE
8. ANCHOR BOLTS, DOWELS, AND OTHER EMBEDDED ITEMS ARE TO BE SECURELY TIED IN PLACE BEFORE
CONCRETE IS POURED. VERTICAL STIFFENER
MECHANICALLY COMPACTED IN 200MM THICK LAYERS TO A
MINIMUM OF 95 PERCENT MDD.
400 10mm GAP
2. ALL SLAB-ON-GRADE SHALL BE PROVIDED WITH A MINIMUM SCHEDULE OF DEVELOPMENT LENGTH
OF 100MM THICK COMPACTED CLEAN COARSE
BAR SIZE DEVELOPMENT LENGTH (Ld)
GRAVEL BED, EXCEPT AS OTHERWISE DETAILED IN THE
PLANS. (GR. 60) f'c = 21MPa f'c = 28MPa f'c = 34MPa f'c = 42MPa f'c = 48MPa f'c = 55MPa f'c = 68MPa
3. ALL SLAB-ON-GRADE ARE NOT DESIGNED AS PRESSURE SLAB (3000 psi) (4000 psi) (5000 psi) (6000 psi) (7000 psi) (8000 psi) (10000 psi)

t
UNLESS OTHERWISE INDICATED ON PLAN. 10mm∅ (#3) 450 400 350 325 300 275 250
4. SLAB-ON-GRADE SHALL BE 100MM THICK WITH 10MM DIA.
BARS SPACED AT 0.60M O.C.

D. CONCRETE NOTES
12mm∅ (#4)

16mm∅ (#5)
525

700
475

625
425

550
375

500
350

475
325

425
300

400
CONCRETE WALLS: DOWEL
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MINIMUM REQUIREMENTS OF THE NATIONAL STRUCTURAL 4-16mmØ with 10mmØ ties
20mm∅ (#6) 875 775 675 625 575 550 475 1@50mm, rest @0.15m o.c.
CODE OF THE PHILIPPINES (NSCP) 2010 OR THE AMERICAN CONCRETE INSTITUTE BUILDING CODE FOR REINFORCED
CONCRETE ACI 318 - EXCEPT AS MODIFIED HEREIN. 22mm∅ (#7) 975 850 750 675 625 600 525
1. CONSTRUCTION OR COLD JOINTS SHALL BE LOCATED WITHIN THE MIDDE THIRD OF SPANS OF SLABS, BEAMS,
AND GIRDERS FOR CASE UNAVOIDABLE, PROPOSED LOCATION MUST BE APPROVED FIRST BY THE STRUCTURAL 25mm∅ (#8) 1350 1175 1050 950 900 825 750
ENGINEER.
2. PIPES OR DUCTS EXCEEDING ONE THIRD THE SLAB OR WALL THICKNESS SHALL NOT BE PLACED IN STRUCTURAL 28mm∅ (#9) 1500 1300 1175 1075 1000 925 825
HORIZONTAL STIFFENER
CONCRETE UNLESS SPECIFICALLY DETAILED.
32mm∅ (#10) 1725 1500 1350 1225 1125 1050 950
3. REINFORCING BARS, ANCHOR BOLTS, AND OTHER INSERTS SHALL BE SECURED IN PLACE BEFORE POURING
CONCRETE. BAR PLACEMENT AND SUPPORTS SHALL BE IN ACCORDANCE WITH THE RECOMMENDED ACI PRACTICE. 36mm∅ (#11) 1950 1675 1500 1375 1275 1200 1075
4. ALL INSERTS, ANCHOR BOLTS, ETC. TO BE EMBEDDED IN THE CONCRETE SHALL BE HOT DIP GALVANIZED UNLESS
NOTED OTHERWISE.
5. IN GENERAL, THE LATEST EDITION OF THE MANUAL OF STANDARD PRACTICE FOR DETAILING CONCRETE SCHEDULE OF LAP SPLICE
STRUCTURES, ACI 315, SHALL BE ADHERED TO, UNLESS SHOWN OTHERWISE. LAP SPLICE (Lb)
6. USE OF ADMIXTURES IS PERMITTED TO PRODUCE PROPER SLUMP AND WORKABILITY BUT SUBJECT TO THE
BAR SIZE PROVIDE DOWEL TO MATCH
(GR. 60) f'c = 21MPa f'c = 28MPa f'c = 34MPa f'c = 42MPa f'c = 48MPa f'c = 55MPa f'c = 68MPa VERTICAL BAR SPACING
ENGINEER'S APPROVAL. ADDITION OF WATER TO CONCRETE AT JOB SITE IS NOT ALLOWED.
(3000 psi) (4000 psi) (5000 psi) (6000 psi) (7000 psi) (8000 psi) (10000 psi)
7. PREPARE AND SUBMIT CONCRETE MIX DESIG INCLUDING AGGREGATES GRADATION, WATER AND CEMENT
CONTENTS, AND CYLINDER STRENGTH TEST RESULT FOR REVIEW. 10mm∅ (#3) 600 525 475 425 400 375 325
2-16mmØ
SCHEDULE OF STRUCTURAL CONCRETE SCHEDULE OF CONCRETE 12mm∅ (#4) 700 625 575 500 475 425 400

AT 28 DAYS COMPRESSIVE STRENGTH AGGREGATES 16mm∅ (#5) 925 825 725 650 625 575 525 10mmØ STIRRUPS 1@50mm

400
REST @150mm O.C.
20mm∅ (#6) 1150 1025 900 825 750 725 625
LOCATION STRUCTURAL 28-DAY COMPRESSIVE MAX. SLUMP ITEMS MAXIMUM
ELEMENTS STRENGTH MPa (psi) mm (in.) AGGREGATE SIZE 22mm∅ (#7) 1275 1125 975 900 825 800 700
2-16mmØ
FOUNDATION FOOTING 20.7 (3000) 100 (4") FOOTINGS 19 mm (3/4") 25mm∅ (#8) 1775 1550 1375 1250 1175 1075 975

GROUND LEVEL SLAB ON GRADE 17.3 (2500) 100 (4") SLABS 13 mm (1/2") 28mm∅ (#9) 1950 1700 1550 1400 1300 1225 1075

ALL LEVELS SLAB WALLS 32mm∅ (#10) 2250 1950 1775 1600 1475 1375 1250
20.7 (3000) 100 (4") 19 mm (3/4")
36mm∅ (#11) 2550 2200 1950 1800 1675 1575 1400
ALL LEVELS BEAMS 20.7 (3000) 100 (4") BEAMS 19 mm (3/4")

ALL LEVELS COLUMNS 20.7 (3000) 100 (4") COLUMNS 19 mm (3/4") SCHEDULE OF DEVELOPMENT LENGTH OF STANDARD HOOKS
BAR SIZE DEVELOPMENT LENGTH OF STANDARD HOOKS (Ldh)
E. REINFORCING STEEL NOTES (GR. 60) f'c = 21MPa f'c = 28MPa f'c = 34MPa f'c = 42MPa f'c = 48MPa f'c = 55MPa f'c = 68MPa
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MINIMUM REQUIREMENTS OF THE NATIONAL STRUCTURAL (3000 psi) (4000 psi) (5000 psi) (6000 psi) (7000 psi) (8000 psi) (10000 psi)
CODE OF THE PHILIPPINES (NSCP) 2010 OR THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION FOR REINFORCING STEEL AND 10mm∅ (#3) 220 190 170 155 150 150 150
REINFORCING BARS EXCEPT AS MODIFIED HEREIN.
t
12mm∅ (#4) 265 230 205 190 175 165 150
SCHEDULE OF REINFORCING STEEL AND REINFORCING BARS
16mm∅ (#5) 350 305 275 250 230 215 195
DIAMETER OF BARS ASTM GRADE
20mm∅ (#6) 440 380 340 310 290 270 240
WELDED WIRE MESH ---- Fy = 228 MPa (33)
22mm∅ (#7) 485 420 375 340 315 295 265
12MM∅ AND SMALLER A615 / A615M (DEFORMED) Fy = 276 MPa (40)
25mm∅ (#8) 550 475 425 390 360 335 300

400
16MM∅ AND LARGER A615 / A615M (DEFORMED) Fy = 415 MPa (60) 28mm∅ (#9) 615 530 475 435 405 375 340

1. BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER MATERIALS LIKELY TO IMPAIR BOND. ALL REINFORCING BAR 32mm∅ (#10) 700 610 545 495 460 430 385

400
BEND SHALL BE MADE COLD.
36mm∅ (#11) 790 685 610 560 515 485 435
2. IN GENERAL, BAR SPLICES SHALL BE MADE AT POINTS OF MINIMUM STRESS. SPLICES SHALL BE SECURELY WIRED
TOGETHER STAGGER SPLICES AT LEAST 600mm. WHENEVER POSSIBLE IN BEAMS AND SLABS, SPLICE TOP BAR AT
MIDSPAN AND BOTTOM BARS NEAR SUPPORT. SPLICE OF REINFORCEMENT SHALL BE MADE ONLY AS REQUIRED BAR SIZE DEVELOPMENT LENGTH OF STANDARD HOOKS (Ldh)
OR PERMITTED ON DESIGN DRAWINGS OR AS ALLOWED BY THE ACI CODE OR AS AUTHORIZED BY THE (GR. 40) f'c = 21MPa f'c = 28MPa f'c = 34MPa f'c = 42MPa f'c = 48MPa f'c = 55MPa f'c = 68MPa
400
ENGINEERS. (3000 psi) (4000 psi) (5000 psi) (6000 psi) (7000 psi) (8000 psi) (10000 psi)
3. BARS NOTED AS CONTINUOUS SHALL HAVE A MINIMUM SPLICE LENGTH OF 40 BAR DIAMETER BUT NOT LESS
THAN 300mm UNLESS OTHERWISE NOTED. 10mm∅ (#3) 150 150 150 150 150 150 150
4. REINFORCEMENT SHALL BE SPLICED ONLY AS INDICATED IN THE DRAWINGS.
12mm∅ (#4) 175 155 150 150 150 150 150
5. MINIMUM CONCRETE COVER FOR REINFORCING BARS SHALL BE:

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
4
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
5@50 PITCH
800

BALANCE @100 PITCH


Ø10 SPIRAL TIES
120

1000

50
50

150
5@50 PITCH

50

300 x 300

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
5
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
SEC.VIEW DET.1 STIFF. PLATE 10mm thk.
500x240X10 STEEL PLATE
240
w/ 10-16mmØ A325 BOLT
W16x26

60
120

60
25
STIFF. PLATE 10mm thk.
500x240X10 STEEL PLATE

124
w/ 10-16mmØ A325 BOLT FULL WELD

1a

100
W16x26

25

500
100
124

124
100
END PLATE 10mm thk.

25
100
124
END PLATE 10mm thk.
W16x26 (SC1)W16x26

25
W16x26
W16x26 W16x26 W16x26
(SC1)W16x26
DET.1a DET.1b ISO.DET.1
DET.2a ISO.DET.2

STIFF. PLATE 10mm thk.


SEC.VIEW DET.3 100x250X10 STEEL PLATE
3a

w/ 3-16mmØ A325 BOLT


50 50

W18x71
W18x71 W18x71
W14x120
STEEL STRUCTURE DESIGN INSTRUCTIONS
THIS PROJECT IS A STEEL STRUCTURE INTERLAYER.
TWO DESIGN BASIS:

50

50
1. THE CURRENT NATIONAL STANDARDS AND CODES, MAINLY INCLUDE: 4. WELD QUALITY INSPECTION GRADE. THE MAIN MATERIAL SPLICING WELDS OF RIGID FRAME COLUMNS

75

75
<<CODE FOR DESIGN OF STEEL STRUCTURE>> (GB50017-2003) AND BEAMS ARE GRADE 2, BEAM-COLUMN AND END PLATE WELDS, FULL PENETRATION WELDS ARE

250

250
<<CODE FOR BUILDING STRUCTURE LOAD>> (GB50009-2012) GRADE 2, AND THE REST ARE GRADE 3

75

75
100x250X10 STEEL PLATE <<CODE FOR SEISMIC DESIGN OF BUILDINGS>> (GB50011-2010)

50

50
w/ 3-16mmØ A325 BOLT W14x120 100x250X10 STEEL PLATE <<TECHNICAL SPECIFICATION FOR COLD-FORMED THIN-WALLED STEEL STRUCTURES>> (GB50018-2002)
DERUSTING AND PAINTING OF STEEL STRUCTURE
<<CODE FOR DESIGN OF CONCRETE STRUCTURES>> (GB50010-2002)
W14x120 w/ 3-16mmØ A325 BOLT 1. BEFORE PRODUCTION, THE SURFACE OF STEEL SHOULD BE SANDBLASTER (OR SHOT BLASTED TO
2. DESIGN LOAD:

50
REMOVE RUST, AND THE RUST REMOVAL LEVEL IS REQUIRED TO MEET THE SA2 LEVEL STANDARD.
FLOOR CONSTANT LOAD 3.0KN/M^2
W18x71 FLOOR LIVE LOAD 4.0KN/M^2

100
2. THE STEEL STRUCTURE SHOULD BE SPRAYED WITH WORKSHOP MAINTENANCE PRIMER IMMEDIATELY
3. THE SEISMIC FORTIFICATION INTENSITYIS SEVEN DEGREES, THE DESIGN BASIC SEISMIC AFTER THE RUST REMOVAL TREATMENT, AND THEN TWO COATS OF RED RED PRIMER SHOULD BE
3b STIFF. PLATE 10mm thk. ACCELERATION VALUE IS 0.15g, THE DESIGN EARTHQUAKE IS GROUPED INTO THE THIRD GROUP, THE APPLIED. AFTER MAKING, APPLY TWO COATS OF ALKYD ENAMEL. THE TOTAL THCKNESS OF THE PAINT
BUILDING SITE CATEGORY IS II CATEGORY, AND THE SITE CHARACTERISTIC PERIOD IS 0.45S. THE FILM IS NOT LESS THAN 125 MICRONS. WHEM THE SURFACE OF THE STEEL MEMBER IS PAINTED WITH
DET.3a (PLAN) DET.3b DET.3c CONSTRUCTION CATEGORY OF THIS PROJECT IS TWO TYPES AND THE BUILDING IS SAFE. THE RANK IS
SECOND-LEVEL AND THE STRUCTURAL IMPORTANCE COEFFICENT IS r0=1.0. THE REASONABLE
FIRE RETARDANT PAINT, THE TOPCOAT IS CANCELLED, AND THE THICKNESS OF THE PRIMER SHALL
NOT BE LESS THAN 75 MICRONS. THE PRIMER AND FIRE RETARDANT COATING SHOULD BE TESTED
SERVICE LIFE OF THE MAIN STRUCTURE OF THE PROJECT IS 50 YEARS. FOR COMPATIBILITY.

THE ELEVATION OF THIS IS IN METERS, AND THE OTHER DIMENSIONS ARE IN MILLIMETERS. 3. DURING THE USE OF THE STEEL STRUCTURE, REGULAR PAINT MAINTENANCE SHOULD BE CARRIED
OUT.
MATERIALS:
4. THE FRICTION SURFACE OF HIGH-STRENGTH BOLTS IS SANDBLASTED AND RED RUSTED, AND THE
1. THE CHEMICAL COMPOSITION AND MECHANICAL PROPERTIES OF GRADE A36 STEEL USED FOR STEEL ANTI-SLIP COEFFICIENT OF THE FRICTION SURFACE SHOULD REACH 0.45 WITHIN THE RANGE OF HIGH

TYPICAL DETAIL OF CHB LAYING & 0.10m - 0.15m

BEAMS AND STEEL COLUMNS SHALL COMPLY WITH THE PROVISIONS OF THE CURRENT NATIONAL
STANDARD <<CARBON STRUCTURAL STEEL>> (GB/T700). THE MEASURED TENSILE STRENGTH AND
YIELD STRENGTH OF STEEL THE RATION OF THE VALUE SHOULD NOT BE LESS THAN 0.85. THE STEEL
SHOULD HAVE OBVIOUS YIELD STEP, AND THE ELONGATION SHOULD BE GREATER THAN 20%. THE
STRENGTH BOLTED CONNECTION, IT IS NOT ALLOWED TO PAINT OR HAVE OIL STAINS

COL./BEAM STIFFENER
STEEL SHOULD HAVE GOOD WELDABILITY AND QUALIFIED IMPACT TOUGHNESS. STEEL STRUCTURE FIRE PROTECTION DETAILED CONSTRUCTION
CHB WALL
1. THE FIRE RESISTANCE LEVEL OF THIS PROJECT IS CLASS 2 AND THE OWNER OF THE FIREPROOF
0.30m

CHB WALL
2. WELDING ROD: COATING FOR STEEL COMPONENTS IS RESPONSIBLE FOR IT.
2-12mmØ CONTINUOUS
TOP BARS IN MANUAL WELDING, Q345 STEEL IS WELDED WITH E50 TYPE ELECTRODE AND ITS PERFORMANCE
0.10m - 0.15m

3.0m-4.0m

SHOULD MEET THE REQUIREMENTS OF CURRENT NATIONAL STANDARD <<CARBON STEEL 2. STEEL STRUCTURE FIRE PROTECTION METHOD:
ELECTRODE>> (GB5117). FOR AUTOMATIC OR SEMI-AUTOMATIC WELDING, USE THE CORRESPONDING THE STEEL STRUCTURE ADOPTS ULTRA-THIN INTUMESCENT STEEL STRUCTURE FIREPROOF COATING.

0.30m
WELDING WIRE AND FLUX SPECIFED IN THE CURRENT NATIONAL STANDARD <<STEEL WIRE FOR FUSION THE SELECTED FIREPROOF COATING FOR STEEL STRUCTURE SHOULD MEET THE REQUIREMENTS OF
12mmØ @ 200mm.
O.C. DOWELS WELDING>> (GB/T 14957). CECS24 AND SHOULD BE TESTED FOR COMPATIBILITY WITH ANTI-CORROSION PAINTING (COATING),
STIFFENER COLUMN 2-12mmØ CONTINUOUS
AND CAN BE USED ONLY AFTER THE TEST IS PASSED.
SIZE = 100mm X 300mm ,150mm X 300mm BOTTOM BARS 3. ORDINARY BOLTS SHOULD COMPLY WITH THE CURRENT NATIONAL STANDARDS <<HEXAGON HEAD FOR THE DETAILS THAT ARE NOT DETAILED IN THIS MANUAL, PLEASE FOLLOW THE RELEVANT
VERTICAL BARS = 4-12mmØ BOLTS-C GRADE>> (GB5780). COLUMN ANCHORS ARE MADE OF Q235 AND Q345 STEEL SHOULD COMPLY PROVISIONS OF THE CURRENT NATIONAL CONSTRUCTION AND ACCEPTANCE SPECIFICATIONS AND
TIES = 6mmØ @ 200mm O.C. STIFFENER BEAM
STIFFENER BEAM WITH THE CURRENT NATIONAL STANDARDS. REGULATIONS.
USE 6mmØ STIRRUPS
SPACED @ 200mm O.C.
4. THE HIGH-STRENGTH BOLTS THAT ARE NOT SPECIFIED SHALL BE GRADE 10.9 TORSIONAL SHEAR TYPE
HIGH-STRENGTH BOLTS. THE HIGH-STRENGTH BOLTS SHALL COMPLY WITH THE CURRENT NATIONAL TECHNICAL REQUIREMENTS FOR REAR ANCHORAGE:
STANDARDS <<TORSIONAL SHEAR TYPE HIGH-STRENGTH BOLT CONNECTION PAIR FOR STEEL STRUCTURES>>
1. THE PLANTING BARS AND CHEMICAL ANCHOR BOLTS SHALL MEET THE REQUIREMENTS OF CODE FOR
GB/T3632-3633 REGULATIONS.
DESIGN OF REINFORCEMENT OF CONCRETE STRUCTURES >> (GB50367-2006). THE ANCHORAGE
LENGTH SHALL NOT BE LESS THAN 10d., AND SHALL BE BASED ON THE NATIONALLY RECOGNIZED TEST
STRUCTURAL AND MANUFACTURING AND INSTALLATION REPORT AND CONDUCT ON-SITE PULL-OUT BEARING CAPACITY TEST.
STIFFENER
COLUMN PROVIDE GAP EQUIVALENT 16 GA. 1-1/2" W/STRAP ANCHOR 1. THE PRODUCTION AND INSTALLATION OF STEEL STRUCTURES SHOULD BE STRICTLY IN ACCORDANCE WITH
TO ANTICIPATED FRAME DRIFT 2" VERTICAL LEGS THE CURRENT NATIONAL STANDARDS <<TECHNICAL SPECIFICATIONS FOR WELDING OF BUILDING STEEL 2. THE ADHESIVES ARE ALL GRADE A ADHESIVES AND THE ADHESIVES MUST BE TESTED FOR SAFETY
STRUCTURES>> (JGJ81-2002) AND <<CODE FOR ACCEPTANCE OF CONSTRUCTION QUALITY OF STEEL PERFORMANCE. THE ADHESIVES USED FOR PLANTING ANCHORS MUST BE SPECIALLY FORMULATED
STRUCTURE ENGINEERING>> (GBJ5-2-5-2001). MODIFIED EPOXY RESIN ADHESIVES OR MODIFIED VINYL ESTER ADHESIVES. ITS PERFORMANCE
SHALL MEET THE REQUIREMENTS OF ARTICLE 4.5.6 OF THE CODE FOR DESIGN OF REINFOCEMENTS
OF CONCRETE STRUCTURES.
2. BEFORE THE CONSTRUCTION AND CUTTING, THE STEEL FRAME IS REQUIRED TO RELEASE A LARGE
3.00m

CHB WALL
SAMPLE ACCORDING TO 1;1 AND CHECK THE SIZE TO AVOID ERRORS. THE SITE SIZE SHOULD BE FULLY
CHECKED BEFORE CONSTRUCTION; BEAM SPANS EXCEEDING 8M SHOULD BE ARCHED ACCORDING TO 3. ON-SITE PULLOUT BEARING CAPACITY TEST SHALL BE CARRIED OUT FOR PLANTED REINFORCEMENT
THE REQUIREMENTS OF THE SPECIFICATION (ARCHING HEIGHT L/600) AND CHEMICAL ANCHOR BOLTS. SEE THE REQUIREMENTS OF GB50367-2006 FOR THE TESTING
QUANTITY AND METHOD. EACH TYPE OF PLANTED REINFORCEMENT AND CHEMICAL ANCHOR BOLT
16 GA. 1-1/2" W/STRAP ANCHOR 3. THE UNSPECIFIED WELDS ARE FULL-WELDED SLOT WELDS AND FULL-PENETRATION WELDS. IF THE
2" VERTICAL LEGS LIGHT GAGE METAL BACKER SHALL BE SUBJECTED TO A SET OF PULLOUT BEARING CAPACITY TEST, 3 PER GROUP.
AS REQUIRED WELD THICKNESS IS NOT SPECIFIED, WHEN <6MM, hf=t; WHEN t>6, hf=t-1mm, t IS THE THINNER
BACKER ROD & SEALANT
WELDMENT.

STEEL COLUMN CONNECTED TO CONC.


ELEVATION
MASONRY WALL

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
6
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GENERAL NOTES AND ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL REQUIREMENTS MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
7
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
270°

A B C D E F G H I J
90°

180°
38.20 8.57
5.00 6.00 6.00 4.80 5.40 1.75 1.44 1.44 1.44 1.44 1.08

NO R
TH
PC2 PC2 PC2 PC2 PC2 PC2 PC2 PC2

1 C1
TB
C1
TB
C1
TB
C1
TB TB
C1
TB
C1
TB
C1

TB
TB TB TB

5.80
TB TB TB
TB

PC1 PC1 PC1 PC1 PC1 PC1


PC2 TB PC2
TB TB TB TB TB
2 C1 TB

TB

5.80
TB TB TB TB TB
TB TB

PC1 PC1 PC1 PC1 PC1


PC2 TB TB PC2 PC2
TB TB TB TB TB
3 C1

TB TB TB
5.80

TB TB TB TB TB

PC1 PC1 PC1 PC1 PC1 PC1


PC2 TB TB TB TB PC2
TB TB
34.80

TB
4 C1 C1

TB
5.80

TB TB TB TB TB TB
TB

2300
PC1 PC1 PC1 PC1 PC1
PC2 TB TB TB TB PC2 PC2 TB PC2
TB TB TB
5 C1

1100
TB TB TB TB TB
5.80

TB TB TB
TB

PC1 PC1 PC1 PC1 PC1 PC1 PC1


PC2 TB TB TB TB TB PC2
TB TB TB
6 C1

TB TB TB TB TB TB
TB TB
5.80

TB

PC1 PC1 PC1 PC1 PC1 PC1 PC1


PC2 PC2 TB PC2 TB PC2
TB TB TB TB TB TB
TB
7 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

5.00 6.00 6.00 5.00 6.00 4.53 1.66 1.44 1.44 1.44 4.14 4.14
46.78

FOUNDATION PLAN
SCALE 1:150M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES FOUNDATION PLAN ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
8
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
A B C D E F G H I J
38.20 8.57
5.00 6.00 6.00 5.00 6.00 4.80 5.40 1.75 1.44 1.44 1.44 1.44 1.08

1.95
5.80

1.92
1.93
2

1.93
5.80

1.93
1.93
3

1.93
5.80

1.93
1.93
34.80

4
1.93
5.80

1.93
1.93

5
1.93
5.80

1.93
1.93

6
5.80

7
2.00

5.00 6.00 6.00 5.00 6.00 4.53 1.66 1.44 1.44 1.44 4.14 4.14
46.78

GROUND FLOOR FRAMING PLAN


SCALE 1:150M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES GROUND FLOOR ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRAMING PLAN
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
9
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
A B C D E F G H I J
38.20 8.57
5.00 6.00 6.00 5.00 6.00 4.80 5.40 1.75 1.44 1.44 1.44 1.44 1.08

1.95
5.80

1.92
1.93
2

1.93
5.80

1.93
1.93
3

1.93
5.80

1.93
1.93
34.80
4

1.93
5.80

1.93
1.93

5
1.93
5.80

1.93
1.93

6
5.80

7
2.00

5.00 6.00 6.00 5.00 6.00 4.53 1.66 1.44 1.44 1.44 4.14 4.14
46.78

SECOND FLOOR FRAMING PLAN


SCALE 1:150M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES SECOND FLOOR ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRAMING PLAN
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
10
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
A B C D E F G H I J
38.20 8.57
5.00 6.00 6.00 5.00 6.00 4.80 5.40 1.75 1.44 1.44 1.44 1.44 1.08

1.95
5.80

1.92
1.93
2

1.93
5.80

1.93
1.93
3
1.93
5.80

1.93
1.93
34.80

4
1.93
5.80

1.93
1.93

5
1.93
5.80

1.93
1.93

6
5.80

7
2.00

5.00 6.00 6.00 5.00 6.00 4.53 1.66 1.44 1.44 1.44 4.14 4.14
46.78

THIRD FLOOR FRAMING PLAN


SCALE 1:150M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES THIRD FLOOR FRAMING ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PLAN
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
11
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
SECTION

A A

A B C D E F G H I J
38.20 8.57
5.00 6.00 6.00 5.00 6.00 4.80 5.40 1.75 1.44 1.44 1.44 1.44 1.08

1.95
5.80

1.92
1.93
2

1.93
5.80

1.93
1.93
3

1.93
5.80

1.93
1.93
34.80

4
1.93
5.80

1.93
1.93

5
1.93
5.80

1.93
1.93

6
5.80

7
2.00

5.00 6.00 6.00 5.00 6.00 4.53 1.66 1.44 1.44 1.44 4.14 4.14
46.78

ROOF DECK FRAMING PLAN


SCALE 1:150M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES FRAMING PLAN ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
12
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
GL+10200mm
(COS)

COLUMN LIST
3,400

NAME SECTION MATERIAL


GL+6800mm(COS)

W14X120 A992
10,200

3,400

BEAM LIST
GL+3400mm(COS)

NAME SECTION MATERIAL


W14X61 A992
3,400

W18X71 A992
GL±0mm (COS)
GL±0mm

BRACE LIST
3,400

3,400

NAME SECTION MATERIAL


GL-3400mm

WT7X15 A992

S E C T I O N " A - A "
SCALE 1:200M

RoofW18X71(892)-739 ( W18X71 ) RoofW18X71(892)-747 ( W18X71 )

24

25
16
15

51
368

100

16
6
10
353

143
194
100

51

25
40 60 60 60 60 60 60 60 60 40
560
1130
200
194
410 194 194
194 380 200
200 200
25 143 25 40 60 60 60 60 60 40 40 60 60 40
40 60 60 40

22
6

100

60 40

60 40
60 40

60 40
6

100

25
60 40

60 40

60 60

60 60
60 60

60 60
6

470
380

380
470
380

380
649

16 353

60 60

60 60

60

60
470
320

320

60

60
649

40 60

40 60
40 60

40 60
368

40 60

40 60
12 12
100
6

21
21
16 10 10
13 13

21
100
6

10 13

END PLATE 200 x 670 ( A36 ) END PLATE 200 x 670 ( A36 ) BC01 (SHEAR CONNECT) BC01 (SHEAR CONNECT)
BC01 (GIRDER SPLICE)
BOLT ( TOP ) 4 - 5/8 ( A325M ) BOLT ( TOP ) 4 - 5/8 ( A325M ) WEB 36-5/8(A325M) / 380x380x12t(A992, 2EA) WEB 18-3/4(A325M) / 200x380x12t(A992, 2EA)
WEB 30-5/8(A325M) / 410x320x16t(A992, 2EA)
BOLT ( BOT. ) 4 - 5/8 ( A325M ) BOLT ( BOT. ) 4 - 5/8 ( A325M ) FLG(EXT.) - FLG(EXT.) -
FLG(EXT.) 72-5/8(A325M) / 1130x194x22t(A992, 2EA)
STIF. ( TOP ) - STIF. ( TOP ) - FLG(INT.) - FLG(INT.) -
FLG(INT.) 1130x51x25t(A992, 4EA)
STIF. ( BOT. ) - STIF. ( BOT. ) -

STEEL MOMENT BOLT CONNECTION GIRDER SPLICE DETAIL SHEAR CONNECTION DETAIL
SCALE 1:20M SCALE 1:20M SCALE 1:20M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES SECTION "A-A" ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STEEL MOMENT BOLT
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL CONNECTION MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
13
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
GIRDER SPLICE DETAIL
SHEAR CONNECTION
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO
DETAIL ENGINEER III
DATE: DATE: DATE: DATE:
C
L CONC. COLUMN ABOVE (SEE SCHEDULE)

SPAN

L/3
FLOOR BEAM
L/3
2 GROUND FLOOR LEVEL

100
12mmØ TEMPERATURE BARS SPACED
AT 400mm O.C. 1050
12mmØ CONT. BOT BARS SPACED AT 150mm O.C. 300 450 300

700
FTB (SEE DETAIL)

300
FLOOR BEAM
FLOOR BEAM

400
13-16Ø TB
SPAN

2100
450
6-16Ø TB
1

(PILE PENETRATION)
2100

600
12mmØ CUT TOP BARS
SPACED AT 150mm O.C.

900
450

150
6-25Ø BB
12-25Ø BB

300
FLOOR BEAM

SPAN 50MM THK. LEAN CONCRETE


L/3 L/3
150

12mmØ CUT/ BENT TOP BARS


SPACED AT 150mm O.C.
CONC. DRIVEN PILE BELOW

12mmØ TEMPERATURE BARS SPACED


AT 400mm O.C.
PILE CAP 2 PLAN (PC2)
12mmØ CONT. BOT BARS SPACED AT
150mm O.C.
SECTION 1 (PC2)
ONE-WAY SLAB (S1)
SCALE N T S

CL CONC. COLUMN ABOVE


CL CONC. COLUMN ABOVE
(SEE SCHEDULE) (SEE SCHEDULE)

2
GROUND FLOOR LEVEL GROUND FLOOR LEVEL

100

100
2100
300 450 600 450 300

700

700
FTB FTB (SEE DETAIL)
300

(SEE DETAIL)
450

400

400
1 18-20Ø TB EACH WAY 18-20Ø TB EACH WAY

2300
2300
2100

600

(PILE PENETRATION)
(PILE PENETRATION)
1100

1100
450
300

150

150
18-25Ø BB EACH WAY
18-25Ø BB EACH WAY

50MM THK. 50MM THK. LEAN


LEAN CONCRETE CONCRETE

CONC. DRIVEN PILE CONC. DRIVEN


BELOW PILE BELOW

PILE CAP 2 PLAN (PC1)


SECTION 1 (PC1) SECTION 2 (PC1)
PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES PILE CAP 1 PLAN (PC1) ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF PILE CAP 1
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL (5 PILES) MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
14
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
PILE CAP 2 PLAN (PC2)
DETAIL OF PILE CAP 2
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO
(PC2) ENGINEER III
DATE: DATE: DATE: DATE:
NOTE :
THICKNESS OF GUSSET CONNECTION PLATE
SHALL NOT BE LESS THAN COLUMN WEB
THICKNESS OF CONNECTED ELEMENT
(WHICHEVER IS GREATER)
TYP.
TYP. WIDTH OF SECTION 190.4
L50X50X3.0MM 9
TUBULAR
SEAT ANGLE TYP

14.5
STEEL BEAM

NOTE
t=8MM

480
SEE
Ø10 DOWELS
A A
WELDED TO SEAT 4-16MMØ BOLTS
75 50 L100X100X12.5MM 12MM BASE PLATE
ANGLE SPACED @
TUBULAR
800MM O.C.

456.9
3 SIDES

400
STEEL BEAM
(TYP.)
STEEL WIDE
FLANGE COLUMN TOP CHORD OF TRUSS

480
TYP.
STEEL WIDE BEAM

14.5
FULL WELD TO FLANGE
TYP. FLANGE COLUMN
STEEL BEAM (RG) W18X50 (RG1)
PLAN SECTION A-A

TYP. SEAT ANGLE


TUBULAR STEEL BEAM TO CONNECTION DETAIL SCI TO RGI CONNECTION TRUSS TO RG CONNECTION STEEL SECTIONS DETAILS
WIDE FLANGE STEEL COLUMN SCALE NTS SCALE NTS SCALE NTS SCALE NTS

CONNECTION DETAILS (MOMENT CONNECTION)


SCALE NTS

NOTE 1: GUSSET PLATE THICKNESS SHALL BE GREATER THAN


THE THICKNESS OF THE WEB (COMBINED THICKNESS OF THE
DOUBLE ANGLE IF APPLICABLE). SHEAR TAB
STEEL COLUMN
STEEL COLUMN (SC1) CONNECTOR (NOTE 4)
(W-SECTION) EACH SIDE/LEG (TYP.) NOTE 2: PRE-WELDED STIFFENER PLATES SHALL MATCH
W 21X83 COLUMN'S WEB THICKNESS AND SHALL BE MINIMUM OF 12MM THK. STEEL COLUMN
STEEL COLUMN (W-SECTION) EACH SIDE/LEG
EACH SIDE/LEG (TYP.)
NOTE 3: THE DEPTH OF THE GUSSET PLATE SHALL BE
(NOTE 3)

(W-SECTION) (TYP.)
GREATER THAN THE DEPTH OF THE SECTION.
DP

d
(NOTE 3)
(NOTE 3)
NOTE 4: SHEAR TAB CONNECTOR SHALL BE WELDED TWO

d
SIDES ON THE SECTION (FRONT & BACK). DOUBLE

DP
DOUBLE ANGLE (LLBB)

DP
GUSSET PLATE (NOTE 1) DOUBLE ANGLE ANGLE
(LLBB) (LLBB)
GUSSET PLATE (NOTE 1) DOUBLE ANGLE (LLBB)
COLUMN WEB & FLANGE GUSSET PLATE EACH GUSSET
GUSSET PLATE (NOTE 1) (NOTE 1)
STIFFENER PLATES (NOTE 2) COLUMN WEB & FLANGE SIDE PLATE
146MM STIFFENER PLATES (NOTE 2) COLUMN WEB & FLANGE
(CLEARANCE) COLUMN WEB & FLANGE SECTION
146MM STIFFENER PLATES (NOTE 2)
STIFFENER PLATES (NOTE 2)
ELEVATION (CLEARANCE) ELEVATION ELEVATION
STEEL COLUMN STEEL
STEEL COLUMN (W-SECTION) ELEVATION COLUMN
(W-SECTION)
(W-SECTION) SHEAR TAB
GUSSET GUSSET CONNECTOR
STEEL COLUMN
PLATE PLATE (W-SECTION) GUSSET PLATE
2779

2779

DOUBLE ANGLE
DOUBLE GUSSET
DOUBLE
ANGLE PLATE
ANGLE
TOP VIEW TOP VIEW DOUBLE
EACH SIDE TWO SIDES
ANGLE
TOP VIEW
MOMENT CONNECTION DETAILS SCI TO RGI CONNECTION DETAILS TOP VIEW
SCALE 1:15 M SCALE 1:15 M
MOMENT CONNECTION DETAILS NON-MOMENT CONNECTION DETAILS
SCALE 1:15 M SCALE 1:15 M

TRUSS (DOUBLE ANGLE) TO COLUMN (W SECTION)


SCALE 1:15 M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES TUBULAR STEEL BEAM T WIDE FLANGE STEEL ENGINEER II
COLUMN CONNECTION DETAIL
CONSTRUCTION OF MULTI-PURPOSE TYP. SEAT ANGLE CONNECTION DETAIL DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL
SCI TO RGI CONNECTION
TRUSS TO RG CONNECTION
STEEL SECTION DETAIL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
15
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
S 16
MOMENT CONNECTION DETAILS
SCI TO RGI CONNECTION DETAIL REVIEWED:
FORT SAN PEDRO, ILOILO CITY MOMENT CONNECTION DETAIL
BARANGAY SAN PEDRO MOLO, ILOILO CITY, NON-MOMENT CONNECTION DETAIL
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III
COLUMN
6404

ANCHOR BOLT

LOCK NUT (3)


EMBANKMENT FINISHED GRADE NUT (2)
100MM THK RAMP SLAB WITH
10MMØ TEMP BARS @ 0.40M CONCRETE SLAB
O.C. BOTH WAYS
2-10MMØ LONGITUDINAL BARS
200MM THK ITEM 200
AGGREGATE SUBBASE COURSE

100

300
SPOT DETAIL "D" 200
SPOT DETAIL "A"

COLUMN

4 5 6 7 8
JOIST
23.97
6.00 6.00 6.00 6000

A
A
AB-20D AB-20D AB-20D AB-20D RAMP UP TO STEEL COLUMN
SECOND FLR.
DN 400X945X25 MM THK.
BASE PLATE W/

4.69
6-Ø25 ANCHOR BOLTS
W/STD. NUTS & WASHER

UP
600 25MM THK.
NON-SHRINK GROUT
B

AB-20D AB-20D AB-20D AB-20D AB-20D CONC. PEDESTAL


50
PLAN
SPOT DETAIL "B"
SEE DETAIL "C" CONCRETE RAMP WITH GROOVES
PEBDECK 55/76 SCREW
SEE DETAIL "B" 6.40
2ND FLOOR FIN. GRD. 2ND FLOOR FIN. GRD.
SEE DETAIL "A"

SEE DETAIL "D"

3.50
BEAM

JOIST JOIST

SECTION "A" SPOT DETAIL "C"

DETAIL OF RAMP AT PARKING AREA


SCALE 1:10M

PREPARED:
IMPLEMENTING AGENCY PROJECT TITLE / LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO.: SHEET NO.:
ANTONIO P. CALISTON JR., ASEP
REPUBLIC OF THE PHILIPPINES DETAIL OF RAMP AT ENGINEER II
CONSTRUCTION OF MULTI-PURPOSE DRAWN:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PARKING AREA
REGION VI, WESTERN VISAYAS
FACILITY(MEDICAL ARTS BUILDING
PARKING), ILOILO CITY HOSPITAL MARIANE ABIGAIL D. DEFIÑO
SEE COVER SHEET SEE COVER SHEET
16
MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E NERIE D. BUENO CESO III GERONIMO P. TREÑAS
FORT SAN PEDRO, ILOILO CITY
BARANGAY SAN PEDRO MOLO, ILOILO CITY,
REVIEWED:
CHIEF-PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR ILOILO CITY MAYOR
S 16
BLECHEL G. AQUITO DATE: DATE: DATE: DATE:
ENGINEER III