As of 2021, Sabah’s generation reserve margin is below industry standard at

16.7% primarily due to absence of new additional generation

LEGEND Key Highlights


132kV Line
Generation Limitations
275kV Line
Kudat

Matunggong
46.5km Future • In the East Coast, there are limited
viable fuel options for its plants
Mengaris
55km

Kota Belud
• Addressing peak demand shortages
requires dispatching of ageing local
76km diesel/MFO plants
Ranau
Elopura
Sapi Nangoh Tshun Nyen Network Constraints
Lok Kawi Kota Kinabalu Sandakan
45km Bukit Nenas
31.5km
Kolopis 255km 35.5km
• High reliance on West-East Link
Seguntor
Papar Segaliud and limited transfer capacity of
Kimanis 51km
113km
transmission lines
68.5km
Beaufort Average Power
Keningau
Labuan 70km
35.5km
40km Transfer = 216MW Dam Road • Occasional brownouts due to
5.3km insufficient generation capacity
Warisan
Mengalong L.Datu • Delays in planning and construction
Tenom 90km of new plant-ups lead to the need
Kunak for decommissioned plants to be
Nabawan
reactivated
Lawas Kalumpang
50km
33km
Semporna
Reserve Margin
Apas Tawau

• West Coast: +44%

• East Coast: -55%