FIM 6 Hoisting
1. Check well way for clearly indicated finished floor line markings and center line markings (by contractor)
2. Check the distance between end supports, pit length, pit depth, rise and diagonals.
Slab opening
Plumb
Pit depth
Diagonals
Must be equal
FIM 6 Hoisting
+5
125.5 Detail A
6. Check load of ceiling for hoisting suspension
FIM 6 Hoisting
FIM 6 Hoisting
A Before hoisting jacking jackbolts (M24 x 120) have to be screwed in completely into the support angels of truss
at both landings.
B put shims onto concrete, where support angles will be after setting down the escalator
FIM 6 Hoisting
Method A:
The others
The last
Entry floor:
unit
The first
unit
FIM 6 Hoisting
Method B:
The first
unit
The
others