Multiple Choice [ ] Theorie [ ] Rechnen [ ]

1. Lecture 1
- objectives of SCM
- classic logistic vs. global logistics
2. Lecture 2
- different items of material management
- determination of material requirements
3. Lecture 3
- make or buy, name 5 circumstances where it is better to buy
- automotive industrie, 90% added value
4. Lecture 4
- 6 steps process supliers strategy
- optimize procurement process for c-parts
5. Lecture 5
- 5 phases of production
- 3 connected steps of product design
6. Lecture 6
- 4 (+) for centralized & decentralized warehouse each
- 3 (+) & (-) for inventory
7. Lecture 7
- selection site factors
- 3-stage and 1-stage distribution structure
8. Lecture 8
- name 2 (+) & (-) for every mode of transport
9. Lecture 9
- two objectives of disposal logistics and conflicts
10. Lecture 10
- objectives of logistic controlling
- key figures procurement logistics, examples with formular

KlausurenDownloadSystem

FSI Wirtschaftsingenieurwesen (Raum U1.248) - Erwin-Rommel-Straße 60 - 91058 Erlangen


Gedächtnisprotokoll 25. Februar 2017
11. Lecture 11
- two types of mass costumization and two examples
- two types of postponement and its risks
12. Lecture 12
- tasl of PPS and one example each
- 2 exchange formats and their application domain
13. Lecture 13
- 7 stages of life cycle
- 4 methods and example of green production
14. CS1
- illustrate Bullwip and 4 impacts and countermeasures
- input output diagramm forrester & burbidge (CS1 Slide 14)
- questions about feedback logic
15. CS2
- risk factors and problems SME are forcing in foreign markets and main barriers and dangers
- location factors categorized
- fill out the blanco!! swot analyzis, just the normal/classic swot
16. CS3
- go green / problems and improvements 12 points
- define green scm
- environmental aspects connected with gscm
- benefits of implementing a gscm