Project HFM Solar, Munder

Sl No. Subject
1 Mode of the Project
2 RFP

3
Plant Capacity and Energy Generation
4
5 Land Area

6 Site details

7 Interconnection Voltage

8 Interconnection Substation Location


HT Routing
9
(Plant end to interconnection substation)
10 Plant Metering
11 Plant Illumination
12 SCADA
13 Water Withdrawl
14 RO system
15 Module Cleaning System
16 CCTV Camera System
17 Internet Connectivity
18 Boundary wall

19 Road

20 Access Roads
21 Permits/Approval
22 Main control toom
23 Construction Power and water
24 Land levelling/Area grading
25 Land cleaning/debris removal
26 Drain type
27 O&M
HFM Solar, Munder _UP
Queries
Whether the plant is on EPC basis or PPA model. Please confirm.
Is there any RFP for the requirements, if yes please share.
Required plant capacity or annual energy requirements need to confirm and if it is plant size than mentioned the cap
or AC capacity.
Is there any DC overloading limit, if yes please confirm the overloading ratio.
As per shared image we are unable to calculate total available area, please confirm total land area
Site topographic survey or land terrain details and any hydrology study if available for the proposed site including th
parameters. If avaiable please share with us.

What is the interconnection voltage level and availability of bay & spare feeder of appropriate rating at the interconn
substation. If spare bay not available than who will be the resposible for the bay. Please confirm.
Interconnection substation location (with google coordinates) and total length of transmission line. Please confirm.

HT line from solar plant to Interconnection substation through HT cable or conductor and ROW in which scope.

Project metering will be behind the meter (BTM) or Open access, please confirm.
Boundary Illumination in which scope. And is there any special requirement. Please confirm.
SCADA is only for monitoring or should have control feature as well. And remote monitoring is required or not. Plea
Borewell is allowed or not in the provided land area. Please confirm.
Kindly let us know if there any requirement of RO system. Please share if there is any water test report from nearby a
Is there any specific requirement of module cleaning system like manual cleaning/robot/ tractor cleaning system. Pl
CCTV and surveillance system is required or not. Is there any specific requirement. Please confirm.
Internet connectivity is available near to land or we need to consider. Please confirm.
kindly let us know about the specification of boundary wall, i.e. Chain Link fencing or pre casted block fencing

Kindly suggest the specification of road, we suggest the following specification;-


a)Plant Peripheral Road :
Type of road: Compacted Soil road
Width: 3.5 M
Shoulder: 0.5M on both side

b) Road from Gate to Control room


Type of road: WBM road
Width: 3.5 M
Shoulder: 0.5M on both side

Scope of road connecting the highway/any govt road to the project site will come under which party?
Who will be taking care of the permits- Construction permit, connectivity permit, etc.
Whether customer is ok with prefabricated structure or RCC building?
Scope of availability of water & power during construction phase. Please confirm.
If there is any vegetation and the scope of work for land levelling. Please confirm.
Scope of removal of trees, debris, boulders etc. Please confirm.
If there is any specific drainage type requirement ? If yes please mention
Kindly confirm the scope of O & M and its duration
lar, Munder _UP
Queries
PPA model. Please confirm.
if yes please share.
rgy requirements need to confirm and if it is plant size than mentioned the capacity is in DC

s please confirm the overloading ratio.


calculate total available area, please confirm total land area
details and any hydrology study if available for the proposed site including the soil
ith us.

vel and availability of bay & spare feeder of appropriate rating at the interconnection
han who will be the resposible for the bay. Please confirm.
with google coordinates) and total length of transmission line. Please confirm.

ction substation through HT cable or conductor and ROW in which scope.

eter (BTM) or Open access, please confirm.


. And is there any special requirement. Please confirm.
d have control feature as well. And remote monitoring is required or not. Please confirm.
ded land area. Please confirm.
ment of RO system. Please share if there is any water test report from nearby area.
odule cleaning system like manual cleaning/robot/ tractor cleaning system. Please confirm.
red or not. Is there any specific requirement. Please confirm.
to land or we need to consider. Please confirm.
ion of boundary wall, i.e. Chain Link fencing or pre casted block fencing

d, we suggest the following specification;-

/any govt road to the project site will come under which party?
- Construction permit, connectivity permit, etc.
ated structure or RCC building?
during construction phase. Please confirm.
e of work for land levelling. Please confirm.
ders etc. Please confirm.
quirement ? If yes please mention
d its duration
Client Response