Area availability at the site for MW Plant Sq. Mtr.
Soil testing report
True South and East/West located w/o any obstruction
No permanent obstruction at those direction
Dimension of the site
Shape of the site
Contour diagram of the site
Population density Frequency of flooding and Thunderstorms
Name of the nearest city or town, and nearer to site
Availability of transportation to the site
Availability of Telecommunication at the site
Availability of Hotels or provision of Accommodation.
Estimation of man power according to the site requirement and time line
Place of the storage of BOS equipment nearby location/development of
stores. Personnel and material available locally for civil work and electrical works
Electronics room identified (if identified pl. give room dimension)and
where it situated. Site power condition/ requirement
Availability of water and electricity for construction
Nearby any substation/HT Wire running
Substation layout indoor/outdoor type
Type of load - 1 phase , 3 – phase
Nearby any industry centre/ commercial centre
Fencing requirement
Security condition at the site for storage of material and deployment of
manpower Availability of motor able approach road to site for transportation of material and manpower Developing of common facilities for constant supervision and data extraction. All the tree and bushes are to be removed and levelled if any.
All the rock and uneven surface are to be levelled if any.
Type of land (wet/dry/banjar etc.)
Land clearance/NOC from the concerned authorities.
Cable length required from MMS to BIS room to power Transmission
Trenching required from BOS equipment to MM structure to power
transmission. Switch yard (132 KV) location with respect to land (if already specified) Voltage level of Switchyard/transmission line for power evacuation from Solar PV Plant ( 11/33/66/132 KV) Distance (in Km) of transmission line from Solar PV Plant Switchyard to Utility/DISCOM sub-station where the power is to be evacuated. Substation synchronization detail Interface SLD of existing substation Grid code applicable inclusive of requirement for voltage, frequency & Power factor. Operating or annual temperature of site Evacuation voltage levels to be considered. Operating time of Hydro & DG set existing plants Specific requirement of module & inverter to be considered