Location of the PV Power Plant

Client Name

Location Address

Nearest Town/city

Latitude N

Longititude E

Site Conditions Value/Remarks


Time line of the project

DC Capacity (Max)

AC Capacity

CUF Requirement (in %)

Area availability at the site for MW Plant Sq. Mtr.

Soil testing report

True South and East/West located w/o any obstruction

No permanent obstruction at those direction

Dimension of the site


Shape of the site

Contour diagram of the site

Population density
Frequency of flooding and Thunderstorms

Name of the nearest city or town, and nearer to site


Availability of transportation to the site

Availability of Telecommunication at the site

Availability of Hotels or provision of Accommodation.


Estimation of man power according to the site requirement and time line

Place of the storage of BOS equipment nearby location/development of


stores.
Personnel and material available locally for civil work and electrical works

Electronics room identified (if identified pl. give room dimension)and


where it situated.
Site power condition/ requirement

Availability of water and electricity for construction

Nearby any substation/HT Wire running

Substation layout indoor/outdoor type

Type of load - 1 phase , 3 – phase

Nearby any industry centre/ commercial centre

Fencing requirement

Security condition at the site for storage of material and deployment of


manpower
Availability of motor able approach road to site for transportation of
material and manpower
Developing of common facilities for constant supervision and data
extraction.
All the tree and bushes are to be removed and levelled if any.

All the rock and uneven surface are to be levelled if any.

Type of land (wet/dry/banjar etc.)

Land clearance/NOC from the concerned authorities.

Cable length required from MMS to BIS room to power Transmission

Trenching required from BOS equipment to MM structure to power


transmission.
Switch yard (132 KV) location with respect to land (if already
specified)
Voltage level of Switchyard/transmission line for power evacuation
from Solar PV Plant ( 11/33/66/132 KV)
Distance (in Km) of transmission line from Solar PV Plant
Switchyard to Utility/DISCOM sub-station where the power is to be
evacuated.
Substation synchronization detail
Interface SLD of existing substation
Grid code applicable inclusive of requirement for voltage, frequency
& Power factor.
Operating or annual temperature of site
Evacuation voltage levels to be considered.
Operating time of Hydro & DG set existing plants
Specific requirement of module & inverter to be considered

Write up of operation of existing hydro & DG set