Pushpak Infra Steel Pvt
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Ya
Mobile No: 8554999419, Email - jayeshdabi@colourste
Work Method
Sr No Tasks
1 Project Initiation
3 Site Preparation
Manpower Selection
4
and Verification
Safety Measures
5
and Training
Reporting and
7
Communication
10 Project Closure
11 Post-Project Review
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com
Work Method
Description
Meet with the client to understand project requirements, timelines, and budget.
Appoint a project manager / coordinator who will oversee the entire project.
Define project goals, objectives, and key performance indicators (KPIs)
Gather all necessary project documents, including blueprints, specifications, and permits.
Develop a detailed project plan, including timelines, milestones, and resource allocation.
Review and ensure that all documents comply with local regulations and client requirements.
Obtain client approval for the project documentation.
Clear the work area of any debris, vegetation, or obstacles that might impede construction.
Ensure adequate access for vehicles and equipment.
Set up temporary fencing or barriers to secure the work area.
Implement a comprehensive safety program for the project site, encompassing risk assessment, safety
training, PPE usage, fall protection, scaffolding, electrical safety, material handling, emergency response,
site organization, regular inspections, communication, safety meetings, documentation, compliance with
regulations, and a commitment to continuous improvement to ensure the well-being of all workers and
prevent accidents.
Start the roof and wall installation work as per the approved plans and schedule.
Monitor progress, quality, and safety on a regular basis.
Address any issues or challenges that arise during construction promptly.
we have implemented a robust communication and reporting system centered around regular status
meetings. These meetings occur weekly and involve all key stakeholders, including project
managers,project coordinators,site supervisor, and clients, to ensure transparency, alignment, and timely
issue resolution
Conduct quality control checks and inspections throughout the installation process to ensure compliance
with safety standards and project specifications.
Upon completion of the project, perform a final inspection.
Ensure that all safety measures are dismantled safely.
Hand over the completed project to the client and obtain their sign-off
Archive all project-related documents, including approvals, contracts, and inspection reports.
Close out the project and ensure all financial matters, including payments and invoices, are settled.
After project completion, conduct a review to assess project performance and identify areas for
improvement.
Gather feedback from the client and project team to learn from the experience.
Remark
Pushpak Infra Steel P
Corporate office: Office no 506, Suyog Center,Gultekadi,M
Mobile No: 8554999419, Email - jayeshdabi@c
Execution Plan
Sr No Tasks
2 Task Prioritization
3 Alternative Equipment
Equipment Rental
4
or Purchase
5 Manual Labor
6 Temporary Structures
7 Project Sequencing
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com
Execution Plan
Description
Conduct a thorough assessment of the site, including space constraints, nearby structures, and the
scope of work.
Identify potential risks and hazards associated with the lack of mobile equipment.
Determine which tasks are critical and must be addressed immediately, and which can be postponed
or rescheduled.
Explore alternative equipment options that are suitable for the site and the tasks at hand.
This might include:
Portable scaffolding or scaffolding towers.
Aerial work platforms (AWPs) that can be manually lifted into position.
Material hoists.
Hydraulic Vertical lift (Scissor lift)
Conveyors
Spider lifts or tracked lifts that can navigate tight spaces.
Telescopic forklifts (telehandlers) for material handling.
Boom lifts with outriggers for stability in confined spaces.
In situations where machinery cannot be used, rely on skilled manual labor to perform tasks such as
lifting, carrying, and positioning materials.
Ensure workers are trained in proper lifting techniques to prevent injuries.
Consider the use of temporary structures like scaffolding or shoring to provide safe access to work
areas.
Ensure that these structures are designed and installed by qualified professionals.
Plan the project sequencing carefully to minimize the need for heavy equipment.
Start with tasks that require manual labor and smaller equipment before progressing to larger tasks.
Remark
Pushpak Infra Ste
Corporate office: Office no 506, Suyog Center,Gulte
Mobile No: 8554999419, Email - jayesh
Hanging Platfo
Description
As per your request, I am sharing images of the hanging platform (Jhula) that we
plan to use for roofing and cladding installation.
Your expertise and insights are highly valuable in ensuring the safety and
efficiency of this endeavor you will find a set of images depicting the hanging
platform (Jhula) we intend to employ.
These images showcase various aspects, including the design, structure, and
safety features of the platform. We have carefully selected this equipment to
facilitate our roofing and cladding work and aim to ensure that it meets the
necessary safety standards.
Safety: Please assess the safety features of the hanging platform (Jhula)
depicted in the images. Are there any potential safety concerns or improvements
that you recommend?
Ease of Use: Consider the user-friendliness of the platform. Are there any
usability issues or suggestions for improving its functionality?
Compliance: Ensure that the hanging platform (Jhula) complies with all relevant
safety regulations and standards.
Overall Suitability: Based on the images provided, do you believe this hanging
platform is suitable for our roofing and cladding installation project
ushpak Infra Steel Pvt Ltd
fice no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
No: 8554999419, Email - jayeshdabi@coloursteel.com
Hanging Platform
Images
Pushpak In
Corporate office: Office no 506, Suyo
Mobile No: 8554999419,
Safe
Sr No Tasks
b) Fall Protection:
c) Ladder Safety:
d) Tool Safety:
e) Electrical Safety:
f) Material Handling:
g) Fire Safety:
a) Pre-Installation Inspection:
b) Safety Briefing:
c) Edge Protection:
d) Access Points:
e) Weather Conditions:
f) Material Handling:
h) Emergency Procedures:
3 Communication
5 Emergency Procedures
6 Environmental Considerations:
7 Training and Reporting:
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com
Safety Standard
Description
Guardrails, safety nets, or personal fall arrest systems are to be used when working at heights.
Ensure that all fall protection equipment is properly inspected and maintained.
Inspect tools before use to ensure they are in good working condition.
Use tools only for their intended purpose.
Install guardrails or other edge protection systems to prevent falls from the roof.
Secure tools and equipment to prevent them from falling off the roof.
Use tool lanyards or tethering when necessary.
Ensure all workers are familiar with emergency procedures, including first aid and evacuation.
All personnel should be familiar with emergency evacuation routes and procedures.
First aid kits and trained personnel must be available on-site.
If an accident occurs, call the first responder right away, dial 999 if there is a serious injury, or 111
if you are unsure.
In the event of fire sound the alarm and evacuate the site by the nearest exit, do not attempt to
confront the fire unless you have been trained to do so and it is safe to do so.
In the event of detecting a material that you suspect could be asbestos-containing, stop work
immediately and alert the site manager/supervisor for additional instructions.