You are on page 1of 21

Pushpak Infra Steel Pvt Ltd

Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037


Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com

Organisation Structure
m
R
jH
P
6
D
p
2
d
.l4
k
5
g
a
sM
A
o
n
S
r-1
O
tv
cu
x
fE
ie
h
C
Pushpak Infra Steel Pvt
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Ya
Mobile No: 8554999419, Email - jayeshdabi@colourste

Work Method

Sr No Tasks

1 Project Initiation

Project Planning and


2
Documentation Approval

3 Site Preparation

Manpower Selection
4
and Verification

Safety Measures
5
and Training

Work Execution / On-Site


6
Implementation

Reporting and
7
Communication

Quality Control and


8
Inspection
9 Completion and Handover

10 Project Closure

11 Post-Project Review
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com

Work Method

Description

Meet with the client to understand project requirements, timelines, and budget.
Appoint a project manager / coordinator who will oversee the entire project.
Define project goals, objectives, and key performance indicators (KPIs)

Gather all necessary project documents, including blueprints, specifications, and permits.
Develop a detailed project plan, including timelines, milestones, and resource allocation.
Review and ensure that all documents comply with local regulations and client requirements.
Obtain client approval for the project documentation.
Clear the work area of any debris, vegetation, or obstacles that might impede construction.
Ensure adequate access for vehicles and equipment.
Set up temporary fencing or barriers to secure the work area.

Recruit skilled and experienced workers for the project.


Verify the qualifications and credentials of the selected team members
Request all workers to submit their Aadhar cards for verification.
Cross-check and verify the authenticity of Aadhar cards with the respective authorities.
Conduct thorough medical examinations for all project team members to ensure they are fit for the job.
Collaborate with local law enforcement agencies to conduct background checks on all workers for any
criminal records.

Implement a comprehensive safety program for the project site, encompassing risk assessment, safety
training, PPE usage, fall protection, scaffolding, electrical safety, material handling, emergency response,
site organization, regular inspections, communication, safety meetings, documentation, compliance with
regulations, and a commitment to continuous improvement to ensure the well-being of all workers and
prevent accidents.

Start the roof and wall installation work as per the approved plans and schedule.
Monitor progress, quality, and safety on a regular basis.
Address any issues or challenges that arise during construction promptly.

we have implemented a robust communication and reporting system centered around regular status
meetings. These meetings occur weekly and involve all key stakeholders, including project
managers,project coordinators,site supervisor, and clients, to ensure transparency, alignment, and timely
issue resolution

Conduct quality control checks and inspections throughout the installation process to ensure compliance
with safety standards and project specifications.
Upon completion of the project, perform a final inspection.
Ensure that all safety measures are dismantled safely.
Hand over the completed project to the client and obtain their sign-off

Archive all project-related documents, including approvals, contracts, and inspection reports.
Close out the project and ensure all financial matters, including payments and invoices, are settled.

After project completion, conduct a review to assess project performance and identify areas for
improvement.
Gather feedback from the client and project team to learn from the experience.
Remark
Pushpak Infra Steel P
Corporate office: Office no 506, Suyog Center,Gultekadi,M
Mobile No: 8554999419, Email - jayeshdabi@c

Execution Plan
Sr No Tasks

1 Assessment and Planning

2 Task Prioritization

3 Alternative Equipment

Equipment Rental
4
or Purchase

5 Manual Labor

6 Temporary Structures

7 Project Sequencing
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com

Execution Plan
Description

Conduct a thorough assessment of the site, including space constraints, nearby structures, and the
scope of work.
Identify potential risks and hazards associated with the lack of mobile equipment.

Determine which tasks are critical and must be addressed immediately, and which can be postponed
or rescheduled.

Explore alternative equipment options that are suitable for the site and the tasks at hand.
This might include:
Portable scaffolding or scaffolding towers.
Aerial work platforms (AWPs) that can be manually lifted into position.
Material hoists.
Hydraulic Vertical lift (Scissor lift)
Conveyors
Spider lifts or tracked lifts that can navigate tight spaces.
Telescopic forklifts (telehandlers) for material handling.
Boom lifts with outriggers for stability in confined spaces.

Arrange for the rental or purchase of the selected alternative equipment.


Ensure that operators are trained and certified to use the equipment safely.

In situations where machinery cannot be used, rely on skilled manual labor to perform tasks such as
lifting, carrying, and positioning materials.
Ensure workers are trained in proper lifting techniques to prevent injuries.

Consider the use of temporary structures like scaffolding or shoring to provide safe access to work
areas.
Ensure that these structures are designed and installed by qualified professionals.

Plan the project sequencing carefully to minimize the need for heavy equipment.
Start with tasks that require manual labor and smaller equipment before progressing to larger tasks.
Remark
Pushpak Infra Ste
Corporate office: Office no 506, Suyog Center,Gulte
Mobile No: 8554999419, Email - jayesh

Hanging Platfo
Description

Hanging Platform for roofing ang clading installation :

As per your request, I am sharing images of the hanging platform (Jhula) that we
plan to use for roofing and cladding installation.
Your expertise and insights are highly valuable in ensuring the safety and
efficiency of this endeavor you will find a set of images depicting the hanging
platform (Jhula) we intend to employ.
These images showcase various aspects, including the design, structure, and
safety features of the platform. We have carefully selected this equipment to
facilitate our roofing and cladding work and aim to ensure that it meets the
necessary safety standards.

We kindly request your evaluation of these images, specifically focusing on:

Safety: Please assess the safety features of the hanging platform (Jhula)
depicted in the images. Are there any potential safety concerns or improvements
that you recommend?

Structural Integrity: Evaluate the structural design of the platform. Do you


believe it is robust enough to support the intended work and load?

Ease of Use: Consider the user-friendliness of the platform. Are there any
usability issues or suggestions for improving its functionality?

Compliance: Ensure that the hanging platform (Jhula) complies with all relevant
safety regulations and standards.

Overall Suitability: Based on the images provided, do you believe this hanging
platform is suitable for our roofing and cladding installation project
ushpak Infra Steel Pvt Ltd
fice no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
No: 8554999419, Email - jayeshdabi@coloursteel.com

Hanging Platform
Images
Pushpak In
Corporate office: Office no 506, Suyo
Mobile No: 8554999419,

Safe

Sr No Tasks

1 General Safety Guidelines

a) Personal Protective Equipment


(PPE):

b) Fall Protection:

c) Ladder Safety:

d) Tool Safety:

e) Electrical Safety:

f) Material Handling:

g) Fire Safety:

Roof and Cladding Installation


2
Procedures:

a) Pre-Installation Inspection:
b) Safety Briefing:

c) Edge Protection:

d) Access Points:

e) Weather Conditions:

f) Material Handling:

g) Secure Tools and Equipment:

h) Emergency Procedures:

i) Regular Safety Inspections:

3 Communication

4 Housekeeping and Site Cleanliness

5 Emergency Procedures

6 Environmental Considerations:
7 Training and Reporting:
Pushpak Infra Steel Pvt Ltd
Corporate office: Office no 506, Suyog Center,Gultekadi,Market Yard, Pune - 411037
Mobile No: 8554999419, Email - jayeshdabi@coloursteel.com

Safety Standard

Description

Hard hats are mandatory on-site.


Safety glasses or goggles must be worn when working at heights or with tools.
High-visibility vests or clothing are required for all workers.
Steel-toed safety boots with non-slip soles are to be worn at all times.

Guardrails, safety nets, or personal fall arrest systems are to be used when working at heights.
Ensure that all fall protection equipment is properly inspected and maintained.

Use appropriate ladders for access to work areas.


Secure ladders and maintain three points of contact when climbing.

Inspect tools before use to ensure they are in good working condition.
Use tools only for their intended purpose.

Ensure that all electrical equipment is properly grounded.


Avoid working near overhead power lines.
Use proper lifting techniques.
Keep materials organized and clear of walkways.

Locate fire extinguishers and know how to use them.


Avoid smoking or open flames near flammable materials.

Verify that the work area is clear of hazards.


Confirm that all necessary materials and equipment are on-site.
Conduct a safety briefing with all workers before starting work.
Review specific safety hazards related to roof and cladding installation.

Install guardrails or other edge protection systems to prevent falls from the roof.

Ensure safe access to the work area using ladders or scaffolding.


Maintain clear pathways and exit routes.

Monitor weather conditions, and cease work if conditions become unsafe.

Safely transport and handle roofing and cladding materials.


Store materials in designated areas.

Secure tools and equipment to prevent them from falling off the roof.
Use tool lanyards or tethering when necessary.

Ensure all workers are familiar with emergency procedures, including first aid and evacuation.

Conduct regular safety inspections and address any issues immediately.

Maintain clear and effective communication channels among workers.


Use communication devices when necessary.

All recommended best practices for workplace cleanliness will be followed.


All spills will be cleaned up right away to eliminate any potential slip risks.
When not in use, all tools, chemicals, and materials will be securely stored to avoid unauthorized
access or unintentional contact. As much as it is practical to do so, the area shall be kept orderly
and free of obstructions during installation.

All personnel should be familiar with emergency evacuation routes and procedures.
First aid kits and trained personnel must be available on-site.
If an accident occurs, call the first responder right away, dial 999 if there is a serious injury, or 111
if you are unsure.
In the event of fire sound the alarm and evacuate the site by the nearest exit, do not attempt to
confront the fire unless you have been trained to do so and it is safe to do so.
In the event of detecting a material that you suspect could be asbestos-containing, stop work
immediately and alert the site manager/supervisor for additional instructions.

Dispose of waste materials in designated containers.


Follow all environmental regulations for the handling and disposal of hazardous materials.
Ensure that all workers have received adequate safety training.
Report all safety incidents and near misses immediately to the supervisor.