WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing.
Responsible for the quality of piping installation.
Responsible also for the productivity of the piping works.
Scheduling of the program of work should be closely monitored and followed
religiously.
Responsible also for the safety of the workers and equipments.
Responsible for the strict discipline of the workers.
Responsible for the strict implementation of the company Rules and Regulations.
Supervise and closely monitoring of the work quality progress.
Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.
WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing.
Responsible for the quality of piping installation.
2
Responsible also for the productivity of the piping works.
Scheduling of the program of work should be closely monitored and followed
religiously.
Responsible also for the safety of the workers and equipments.
Responsible for the strict discipline of the workers.
Responsible for the strict implementation of the company Rules and Regulations.
Supervise and closely monitoring of the work quality progress.
Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.
WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing.
Responsible for the quality of structural installation.
Responsible also for the productivity of the erection works.
Scheduling of the program of work should be closely monitored and followed
religiously.
Responsible also for the safety of the workers and equipments.
Responsible for the strict discipline of the workers.
Responsible for the strict implementation of the company Rules and Regulations.
Supervise the erection and installation of the gantry crane and overhead crane.
Supervise and closely monitoring of the work quality progress.
Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.
3
COMPANY : SEJONG CORPORATION
POSITION : SUPERVISOR IRON WORKER
YEAR EMPLOYED : AUGUST 4, 2011 TO OCTOBER 15, 2012
LOCATION : DAMMAM, K.S.A.
PROJECT : QURAYYAH COMBINED CYCLE POWER PLANT
WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
Prepared and expedite materials and tools consumables for the erection and
installation of the new spare parts external and internal of heat recovery steam
generator.
Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
Initiate pre-assembly, fabrication and installation as per drawing of casing needed.
Promotes the use of safety methods and safety requirements to improve safety
attitudes and maintain safety housekeeping standards.
WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
Take charge on erection, installation, alignment (pre-final and final) and centering
of steam drum.
4
Prepared and expedite materials and tools consumables for the erection and
installation of high pressure parts.
Take charge on pre-fabrication of boiler tube panel and its erection and installation.
Take charge on erection and installation of main steamline pipe, fit-up, and full welding.
Take charge on erection and installation of primary and secondary pipe; fit-up and
full welding.
Take charge on erection and installation of connecting pipe and down comer and
fit-up and full welding.
Take charge on erection and installation of back stay and its attachments.
Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
Administer on Hydro-testing and commissioning and takes records data’s and
other important parameters to ensure unit reliability and future action plans to
improve implementation of corrective action.
Responsible for the strict implementation of the company rules and regulations.
Promotes the use of safety methods and safety requirements to improved safety
attitudes and maintain safety housekeeping standards.
WORK DESCRIPTION:
Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
Prepared and expedite materials and tools consumables for the erection and tools
consumable for the erection and installation of the new line welded and threaded.
Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
Initiate the fabrication of spools needed.
Assist on Hydro – testing and commissioning and takes records data’s and other
important parameters to ensure unit reliability and future action plans to improved
implementation of corrective action.
5
Promotes the use of safety methods and safety requirements to improve safety
attitudes and maintain safety housekeeping standards.
COMPANY : BOILER MAKER INC.
POSITION : SUPERVISOR
YEAR EMPLOYED : OCT. 23, 2004 TO NOV. 23, 2004
LOCATION : MIRANT POWER PLANT PAGBILAO, QUEZON
PROJECT : AIR HEATER OVER HAULING
WORK DESCRIPTION:
WORK DESCRIPTION:
6
Does maintenance and repair works on boiler equipments and accessories:
parts/system, on emergency shut-down and unit overhauling as: boiler tube leaks
repair; repair/replacement of values; piping lines, insulation, castering re-tubing
works on, super heaters, reheaters, materials, economizers, etc.
Does pipelines installations, modification, repair, replacement, insulation and
other auxiliary piping works.
Emergency boiler tube leak repairs, re-tubing on super heaters, re-heaters,
economizers, material and other tube element.
Does/assist on welding work preparation as in tube and beveling, fittings.
Pre-heating, post heating, tress relieving and other heat treatment processes.
WORK DESCRIPTION:
WORK DESCRIPTION:
WORK DESCRIPTION:
WORK DESCRIPTION:
Does maintenance and repair work on Boiler equipments and accessories. Parts
system on emergency shut down and schedule unit overhaul.
Does pipelines installation, modification repair/replacement work, installation and
other auxiliary piping works.
Does major and auxiliary valves installation, repair and replacement work.
Does emergency boiler tube, leaks repair and re-tube as in primary and secondary
super heaters, re-heaters water walls economizers and other boiler tube elements.
Does assist in welding works as involves in AH (Air Heater) repair/overhauling
work. Other systems as in: draft works RSB’s steam coil air heaters, thermo
probe; low and high pressure heaters, etc.
Does other works as in house keeping and safety guidelines.
ATTITUDE OF EMPLOYEE
The employee must demonstrate a sincere interest and enthusiasm in his job. The
employee must know the positive outlook toward the company – its business operations, beliefs
and concern. The employee must be able to perform his job with a positive attitude even while
working under stress this include having quality of initiative responsibility and force sight.
WORK QUALITY
8
The employee must be able to prove to the satisfaction of the company advance skill,
initiative and competence in the duties responsibilities detailed and listen in his contract of
employment.
EDUCATIONAL BACKGROUND
PERSONAL DATA
CHARACTER REFERENCES
I HEREBY CERTIFY that the foregoing information are true and correct to the best of
my knowledge and belief I understand that any misrepresentation will be considered a just cause
for the REJECTION of this application.
DEOLITO B. QUIAMCO
Applicant
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25
26
27
28
29