You are on page 1of 29

DEOLITO B.

QUIAMCO
# 78 Lt. C. Aguinaldo St., Brgy. Kalayaan, Angono, Rizal
Mobile Nos. 09771723876 / +639196575763

Position Applied for : PIPING SUPERVISOR / BOILER SUPERVISOR/


STRUCTURAL SUPERVISOR

CAREER OBJECTIVES

 To seek employment that will enable me to gain personal growth and


development.
 To utilize and share my knowledge skills, and capabilities in the construction
field.

EMPLOYMENT RECORD

COMPANY : YUHAN TECH TRADING LLC


POSITION : PIPING SUPERVISOR
YEAR EMPLOYED : DECEMBER 29, 2018 TO SEPTEMBER 23, 2019
LOCATION : SULPHUR HANDLING FACILITIES PROJECT (SHFP)
AT MAA REFINERY, KNPC, KUWAIT

WORK DESCRIPTION:

 Preparing and monitoring of fabrication sequencing as per codes and standards


during fabrication work is performed in accordance with the approved
construction procedure, specification and correct materials of PROCESS
PIPING/PIPELINE.
 Attending daily meeting (Production and safety).
 Implement the permit to work system.
 Responsible for conducting daily tool box talk and providing safety awareness to
the crew members.
 Familiar in erection of hook up spools in utility station and pumps, equipments
and vessels.
 Daily progress report follows-up.
 Prepare the one week look ahead schedule that needs to be submitted to the
planning department for review and inputs to draw up the final execution plan for
the piping department.
 Proper arrangement of equipment and manpower based on the site without
delaying of production daily bases.
 Performing construction and scrapping activities.
 Supervise the team for timely and accurate work execution. Ensure that all the
work activities in safe condition and get completed as per the quality norms and
as per project specifications.
 Participating and preparing of task risk assessment for the given job to categorize
and measure the precaution for the task carry out job safety and without LTL.
 Responsible for establishing, promote and maintaining a safety and hazard free
working environment. Formulates and develops safety policies and procedures
with the help of the HSE Department.
 Maintaining proper housekeeping of the work location.

COMPANY : YUHAN TECH TRADING LLC


POSITION : PIPING SUPERVISOR
YEAR EMPLOYED : JANUARY 14, 2018 TO DECEMBER 29, 2018
LOCATION : CLEAN FUEL PROJECT (CFP), AT MAA REFINERY,
KNPC, KUWAIT

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing.
 Responsible for the quality of piping installation.
 Responsible also for the productivity of the piping works.
 Scheduling of the program of work should be closely monitored and followed
religiously.
 Responsible also for the safety of the workers and equipments.
 Responsible for the strict discipline of the workers.
 Responsible for the strict implementation of the company Rules and Regulations.
 Supervise and closely monitoring of the work quality progress.
 Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
 Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.

COMPANY : YUHAN TECH TRADING LLC


POSITION : PIPING SUPERVISOR
YEAR EMPLOYED : MARCH 14, 2016 TO JUNE 5, 2017
LOCATION : P.O. BOX 512 P.C. 322 FALAJ AL-QABAIL,
SULTANATE OF OMAN
PROJECT : SOHAR REFINERY AND IMPROVEMENT PROJECT (SRIP)

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing.
 Responsible for the quality of piping installation.
2
 Responsible also for the productivity of the piping works.
 Scheduling of the program of work should be closely monitored and followed
religiously.
 Responsible also for the safety of the workers and equipments.
 Responsible for the strict discipline of the workers.
 Responsible for the strict implementation of the company Rules and Regulations.
 Supervise and closely monitoring of the work quality progress.
 Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
 Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.

COMPANY : WOOLIM PLANT


POSITION : STRUCTURAL SUPERVISOR
YEAR EMPLOYED : JUNE 28, 2013 TO MARCH 3, 2015
LOCATION : SEOCHO-KU, SEOUL, KOREA
PROJECT : GHANA TAKORADI T2 EXPANSION PROJECT
ABOADZE POWER PLANT

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing.
 Responsible for the quality of structural installation.
 Responsible also for the productivity of the erection works.
 Scheduling of the program of work should be closely monitored and followed
religiously.
 Responsible also for the safety of the workers and equipments.
 Responsible for the strict discipline of the workers.
 Responsible for the strict implementation of the company Rules and Regulations.
 Supervise the erection and installation of the gantry crane and overhead crane.
 Supervise and closely monitoring of the work quality progress.
 Checked availability of materials, tools and equipment needed to avoid
unnecessary delayed of works.
 Promotes the use of safety methods and safety requirements, to improved safety
attitudes and maintain safety housekeeping standards.

3
COMPANY : SEJONG CORPORATION
POSITION : SUPERVISOR IRON WORKER
YEAR EMPLOYED : AUGUST 4, 2011 TO OCTOBER 15, 2012
LOCATION : DAMMAM, K.S.A.
PROJECT : QURAYYAH COMBINED CYCLE POWER PLANT

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
 Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
 Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
 Prepared and expedite materials and tools consumables for the erection and
installation of the new spare parts external and internal of heat recovery steam
generator.
 Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
 Initiate pre-assembly, fabrication and installation as per drawing of casing needed.
 Promotes the use of safety methods and safety requirements to improve safety
attitudes and maintain safety housekeeping standards.

COMPANY : KEANGNAM ENTERPRISES, LTD.


POSITION : BOILER SUPERVISOR
YEAR EMPLOYED : JULY 18, 2008 TO SEPTEMBER 1, 2010
LOCATION : AMBATOVY POWER PLANT, TOAMASINA /
TAMATAVE, MADAGASCAR
PROJECT : POWER PLANT & STEAM GENERATOR

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
 Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
 Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
 Take charge on erection, installation, alignment (pre-final and final) and centering
of steam drum.

4
 Prepared and expedite materials and tools consumables for the erection and
installation of high pressure parts.
 Take charge on pre-fabrication of boiler tube panel and its erection and installation.
 Take charge on erection and installation of main steamline pipe, fit-up, and full welding.
 Take charge on erection and installation of primary and secondary pipe; fit-up and
full welding.
 Take charge on erection and installation of connecting pipe and down comer and
fit-up and full welding.
 Take charge on erection and installation of back stay and its attachments.
 Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
 Administer on Hydro-testing and commissioning and takes records data’s and
other important parameters to ensure unit reliability and future action plans to
improve implementation of corrective action.
 Responsible for the strict implementation of the company rules and regulations.
 Promotes the use of safety methods and safety requirements to improved safety
attitudes and maintain safety housekeeping standards.

COMPANY : AL – SUWAIDI INDUSTRIAL SERVICES


POSITION : FOREMAN PIPING
YEAR EMPLOYED : MARCH 06, 2005 TO MAY 20, 2007
LOCATION : ABQAIQ PLANT K.S.A.
PROJECT : FIRE WATER SPRINKLERS FOR COOLING TOWERS

WORK DESCRIPTION:

 Prepared work schedule and plans to install new materials in accordance with to
suit action conditions.
 Checked and prepared all isometric drawing and line check to ensure the correct
dimensions and elevation.
 Prepared list of materials, tools, equipment, and manpower requirement to
accomplish a required task within allotted time
 Checked availability of materials, tools, and equipment needed to avoid
unnecessary delayed of schedule.
 Prepared and expedite materials and tools consumables for the erection and tools
consumable for the erection and installation of the new line welded and threaded.
 Assist the extent of work to be done and priority of each individual task to ensure
complete installation to avoid delay of other activities.
 Initiate the fabrication of spools needed.
 Assist on Hydro – testing and commissioning and takes records data’s and other
important parameters to ensure unit reliability and future action plans to improved
implementation of corrective action.
5
 Promotes the use of safety methods and safety requirements to improve safety
attitudes and maintain safety housekeeping standards.
COMPANY : BOILER MAKER INC.
POSITION : SUPERVISOR
YEAR EMPLOYED : OCT. 23, 2004 TO NOV. 23, 2004
LOCATION : MIRANT POWER PLANT PAGBILAO, QUEZON
PROJECT : AIR HEATER OVER HAULING

WORK DESCRIPTION:

 Responsible for supervision and coordinating activities of subordinates engaging


in major maintenance and repair of all thermal plant boiler equipment and
accessories during emergency shut-down and scheduled overhaul.
 Prepare list of material, tools, and equipment and manpower requirement to
accomplish a required task within allotted time frame.
 Check availability of materials, tools, and equipment and needed to avoid
unnecessary delay of schedule and initiates requisition of out-of stock materials.
 Prepares work schedule and plans repair procedures to suit actual field conditions.
 Give instructions on trouble analysis repair procedures, materials to be used and
priority of the job.
 Assesses the extent of work to be done and priority of each individual task to
ensure complete repair of equipments and to avoid delay of other activities.
 Assist on the start-up of unit takes and records datas and other important
parameters to ensure unit reliability and future action plans to improve
implementation of correlative action.
 Assist the final inspections and observe the test-rum or start-up of repaired and
newly installed equipments.

COMPANY : HATSUDEN SHOP INC.


POSITION : BOILER FOREMAN/WELDING FOREMAN
YEAR EMPLOYED : AUGUST 2002 TO MARCH 2004
LOCATION : MIRANT POWER PLANT/COVANTA
POWER PLANT, QUEZON
PROJECT : ANNUAL OVERHAULING

WORK DESCRIPTION:

 Prepared manpower requirements and tools to be used in the maintenance and


repair on the emergency shut-down and unit over haul.
 Gives instruction on trouble analysis repair procedures, materials to be used and
priority of the job.
 Prepares work schedule and plans repair procedures to suit actual field conditions.

6
 Does maintenance and repair works on boiler equipments and accessories:
parts/system, on emergency shut-down and unit overhauling as: boiler tube leaks
repair; repair/replacement of values; piping lines, insulation, castering re-tubing
works on, super heaters, reheaters, materials, economizers, etc.
 Does pipelines installations, modification, repair, replacement, insulation and
other auxiliary piping works.
 Emergency boiler tube leak repairs, re-tubing on super heaters, re-heaters,
economizers, material and other tube element.
 Does/assist on welding work preparation as in tube and beveling, fittings.
 Pre-heating, post heating, tress relieving and other heat treatment processes.

COMPANY : M. AL MOJIL GROUP


POSITION : BOILER UTILIZED FOREMAN
YEAR EMPLOYED : FEBRUARY 20, 2001 TO OCTOBER 15, 2002
LOCATION : RIYADH REFINERY K.S.A.
PROJECT : STEAM BOILER RE-TUBING AND OVERHAULING

WORK DESCRIPTION:

 Does maintenance and repair work on boiler equipments and accessories.


 Parts systems on temporary shutdown and schedule unit overhauling.
 Bank wall tube, bank tube, rear tube, baffle tube, super heater tube, elements and
super heater tube.
 All these pipes sequences cut out stub removal.
 Tube sheet cleaning and re-install again the new pipes.
 Removal soot blower and burner tips also replacement all valves removal and
hydro testing and commissioning.
 Does other works as in housekeeping and safety.

COMPANY : M. AL MOJIL GROUP


POSITION : BOILER MAKER
YEAR EMPLOYED : APRIL 26, 1996 TO JUNE 15, 1998
LOCATION : RASTANURA UPGRADE REFINERY
AND ZULOP UPGRADE OIL RIG
PROJECT : BOILER 11 AND 12 AND GOSP 1/2/3 FIRE WATER
LINE PROJECT

WORK DESCRIPTION:

 Installation of mud drum and steam drum internal.


 Dry box, corrugated plate basket, drainpipes, deflection baffle plate, feed water
pipe, continuously blow down pipe, instrument pipe, water column internal pipe
and installation of burner tips, soot blower bearing plate bank tube, and expanding
preliminary, pre-final and hydro testing and commissioning.
 Cutting and grinding of pipe spool.
7
 Fit-up and alignment / installation of pipe spools.
 Fabricate and installation of pipe support.
 Line checking and assist for Hydro Testing.
 Housekeeping at working area.
COMPANY : WITCO
POSITION : PIPE FITTER / BOILER MAKER
YEAR EMPLOYED : APRIL 14, 1994 TO SEPTEMBER 05, 1994
LOCATION : COMBINED CYCLE BATAAN CALACA, BATANGAS
PROJECT : RESTORATION / ANNUAL OVERHAULING

WORK DESCRIPTION:

 Does pipelines installation, modification, repair, replacement, insulation and other


auxiliary piping works. Cutting of six (6) units exhaust stack and re-install.
 Emergency boiler tube leak repairs, re-tubing on super heaters, heaters
economizers’ water wall and other tube elements.
 Assisting of hydro testing and inspection to all new welding joints.

COMPANY : CENTRO TECH INCORPORATED


POSITION : BOILER MAKER / STRUCTURAL WELDING
YEAR EMPLOYED : APRIL 5, 1988 TO JANUARY 18, 1994
LOCATION : N.P.C. SUCAT / BATANGAS / BATAAN
PROJECT : BOILER OVERHAULING AND RE-TUBING

WORK DESCRIPTION:

 Does maintenance and repair work on Boiler equipments and accessories. Parts
system on emergency shut down and schedule unit overhaul.
 Does pipelines installation, modification repair/replacement work, installation and
other auxiliary piping works.
 Does major and auxiliary valves installation, repair and replacement work.
 Does emergency boiler tube, leaks repair and re-tube as in primary and secondary
super heaters, re-heaters water walls economizers and other boiler tube elements.
 Does assist in welding works as involves in AH (Air Heater) repair/overhauling
work. Other systems as in: draft works RSB’s steam coil air heaters, thermo
probe; low and high pressure heaters, etc.
 Does other works as in house keeping and safety guidelines.

ATTITUDE OF EMPLOYEE

The employee must demonstrate a sincere interest and enthusiasm in his job. The
employee must know the positive outlook toward the company – its business operations, beliefs
and concern. The employee must be able to perform his job with a positive attitude even while
working under stress this include having quality of initiative responsibility and force sight.

WORK QUALITY
8
The employee must be able to prove to the satisfaction of the company advance skill,
initiative and competence in the duties responsibilities detailed and listen in his contract of
employment.
EDUCATIONAL BACKGROUND

Primary School : Manlot-od Elementary School


Year Graduated : 1975 – 1982

Secondary School : Badiang National High School


Year Graduated : 1982 – 1986

PERSONAL DATA

Date of Birth : January 23, 1968


Place of Birth : Masbate
Sex : Male
Age : 53 years old
Civil Status : Married
Nationality : Filipino
Height : 5’5”
Weight : 130 lbs.
Color of Eyes : Brown
Color of Hair : Black
Father’s Name : Deogenes C. Quiamco (Deceased)
Mother’s Name : Conchita B. Quiamco
Contact No. : +63-915-941-8890
SSS No. : 03-9488996-6
Passport No. : EC2676318
Language Spoken : Tagalog / English

CHARACTER REFERENCES

MR. JOY NASARINO Project Manager Cell No. +966558884926


MR. YOM Boiler Engineer Cell No. +261320767116

I HEREBY CERTIFY that the foregoing information are true and correct to the best of
my knowledge and belief I understand that any misrepresentation will be considered a just cause
for the REJECTION of this application.

DEOLITO B. QUIAMCO
Applicant

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25
26
27
28
29

You might also like