Security Plan and Job Hazard Analysis

EQUIPMENT: Drilling Rig/water pump & its


accessories. LOCATION: Altaraza Town Center,
WORK TITLE: Soil Investigation for Proposed San Jose del Monte, Bulacan
Commercial Building
Work Step Hazard Control (For isolations, see below)
DRILLING RIG & BOOM SET-UP
1. Lay the drilling rig perpendicular on two
woods (about 3”x3”x4’ in size) placed at the Slipping of drilling machine from the Positioned on a level ground. Fixed positioning.
front and rear side of the rig to make it woods.
level.
2. Assemble the four (4) legs of the boom by
fastening the lower G.I. pipes (3 meters Falling down / toppling of G.I. pipes Fixed connection.
length) at the skid of the rig using 4pcs.
3/8” bolt and nut.
3. Using a harness, one crew member will
climb up the aluminum ladder to connect
the lower legs of the boom with a square Slipping of aluminum ladder. Check proper placing of ladder.
metal to hold it in place.

4. The upper 3 meters G.I. pipes will then be Accidental slipping of crew member Proper wearing of harness.
connected to each four legs. from the ladder.
5. The ends of the four legs will be connected Accidental slipping of crew member Proper wearing of harness.
at the top using a pin to hold it in place. from the ladder.
6. Attached the pulley at the top of the boom
(6 meters high). Falling objects. Avoid standing near the machine.
7. Place the rope that will be attached to the
rods/casing during the conduct Rope disconnection. Proper fastening.
of SPT.

Page 1 of 2
8. Drilling operation by conducting wash During Drilling Operation, Noise coming Confining the drilling space.
boring procedure, Standard Penetration Test from the drilling rig cause unwanted
and coring procedure. noise to nearby office building.

COMMENTS / SPECIAL PRECAUTIONS:

Task Analysis Team:

Authorized By: Signature: DATE:

Page 2 of 2