4. The upper 3 meters G.I. pipes will then be Accidental slipping of crew member Proper wearing of harness.
connected to each four legs. from the ladder.
5. The ends of the four legs will be connected Accidental slipping of crew member Proper wearing of harness.
at the top using a pin to hold it in place. from the ladder.
6. Attached the pulley at the top of the boom
(6 meters high). Falling objects. Avoid standing near the machine.
7. Place the rope that will be attached to the
rods/casing during the conduct Rope disconnection. Proper fastening.
of SPT.
Page 1 of 2
8. Drilling operation by conducting wash During Drilling Operation, Noise coming Confining the drilling space.
boring procedure, Standard Penetration Test from the drilling rig cause unwanted
and coring procedure. noise to nearby office building.