Project Name Neom Construction Project JSA NO:- Sample 01
Project Location Al Khuribah
Activity: -Loding and unloading of material
Step Hazard Control Measures
• Incompetent Driver/operator •Only authorised operator to operate boom truck with valid • Suspended load TUV certificate and driver license. • Lifting equipment shall only be operated and maintained • Unauthorized personnel by qualified personnel such as those designated and Loading and • Moving vehicles authorized. unloading of material • Defective tools and equipment • Ensure that lifting equipment and lifting accessories are using boom truck third party certified. • Mechanical/hydraulic failure • Boom truck equipment and riggers must have proof of • Adverse weather condition competency third party certifications (TUV). • Over speeding • Competent rigger should be available on site during • Overloading of materials and passenger. lifting. • Collision of vehicles, • A flagman should always be available during use and transit of the lifting equipment. • People hit by vehicle. • Barricades or caution lines, and notices, are erected to • Incompetent drive and operator. prevent all employees from entering the fall zone. • Falling of loads and damaged property. • No employees, are permitted in the fall zone. • Personnel injury. • Swing radius of the crane must be identified and • Miscommunication of rigger,flagman and operator. barricaded. • All lifting accessories must be regularly inspected and third party certified. • All lifting operations should s top when wind gusts/speed is above 30km/hr. • The boom truck must not be operated in excess of its rated capacity. • Wear appropriate PPE’S. • Drive s lowly and follow the traffic rules also use