Professional Documents
Culture Documents
Training
D. Vasudevaraju
Agenda:
• Understanding difference between Routine versus Non-
routine lifts
• Hazards in Lifting activities
• AZDP Requirements
• Planning the lifting operations
• Roles & Responsibilities
• Method of slinging the load
• Examination testing & control
2
• Routine Lift
• Non-Routine Lift
A lift refers to lifting operations that are complex, carried out for the
first time or lifting close to the lifting capacity of the crane.
3
Examples of non routine lifts:
4
Accidents are mainly occurred due to:
5
Accidents are mainly occurred due to:
Boom touching
Equipment failure Falling Objects Collision
power lines
6
Factors that might make a mobile crane topple over
■ Overloading
■ Uneven or unstable ground
■ Failure to use the outriggers
■ High winds
■ Extending the jib of the crane too far
out
■ Structural failure of parts
7
Improper rigging can lead to
falling loads
8
AZDP Critical Requirements
A lifting plan must be prepared, checked and issued by competent authorised
persons prior to any lifting operation
No person shall be positioned under any suspended load or between any
suspended load and fixed objects
All equipment and accessories used for lifting operations must be uniquely
identified, marked with the safe working load, listed in a register, and subject to
formal regular inspections:
every 6 months minimum for accessories
every 12 months minimum for equipment
All lifting equipment and accessories must have a valid manufacturer’s
certificate or thorough examination records.
9
AZDP Other Requirements
A formal documented risk assessment must be undertaken and communicated
to the persons performing any lifting operations
Alstom must ensure that a designated leader is formally appointed to supervise
each work activity where there are lifting operations
All persons preparing and issuing lifting plans must be subject to recorded
competence checks to ensure necessary training experience and qualification
All persons involved in lifting operations must be subject to recorded
competence checks to ensure necessary training experience and qualification
prior to commencing work
A Permit to Work must be established prior to any non-routine lifting operation
10
AZDP Other Requirements
Prior to commencing any non-routine lifting operation, an on-site recorded pre-
lift meeting, including toolbox talks, must be conducted to review the phases of
the operation using risk assessment, lifting plan and drawings as a basis.
Prior to commencing any lifting operation, the designated leader responsible for
that operation must ensure that roles and responsibilities are clearly allocated
and communicated to each lifting team member, as defined by the lifting plan
The communication method, as defined in the lifting plan, must be applied when
the lifting operation involves more than one person. Only the designated person
responsible will provide instructions to the lifting equipment operator. However,
the operator shall obey a stop signal at all times, no matter who gives it
All defective, non-inspected or unidentified lifting accessories and equipment
must be either quarantined or destroyed
11
AZDP Other Requirements
All lifting accessories must be subject to a pre-use inspection by the user.
Powered lifting equipment must be subject to daily inspection.
All lifting equipment and accessories must be stored and maintained in a correct
manner
12
Planning the lifting operations
13
Planning the lifting operations
6. The Working Radius
7. Selection Of The Most Suitable Crane
8. Ground Compaction
9. Position Of Obstacles (If Any)
10. Packing/ Timbers To Land The Load On
11. Weather Conditions
12. Appropriate Level Of Permit To Work
13.All persons involved in lifting should be competent in their roles
14. TPI certificates & legal documents for Lifting equipment
14
Roles & Responsibilities
Site Engineer/Supervisor Role:
All Discipline Engineers/Technicians are responsible for: Those
personnel who directly supervise any lifting operation are
responsible for ensuring that all materials are handled in a safe
and correct manner and in accordance with this Procedure.
15
Roles & Responsibilities
Lifting Supervisor Role:
• Competent & trained
• Confirm the weight of the load before rigging commences.
• Ensure the load is properly rigged and supervise the rigging crew.
• Ensure rigging material or equipment is correctly assembled.
• Ensure the safety of lifting crew and any others who may be affected.
• Ensure everyone is in a safe area before lifting.
• Carry out regular checks on any rigging/lifting equipment.
• Ensure hazardous areas properly barricaded.
• Issue a Permit to Work for non-routine lifts.
• Conduct pre-lift briefings.
• Ensure hands signals and communication are properly managed
16
Roles & Responsibilities
Crane Operator Role:
• Competent and trained
• Respond to signals from lift supervisor
/banksman
• Respond to ALL stop signals.
• Know equipment and test controls
• Follow instruction (site/manufacturer).
• Ensure all lifting equipment is safe for use.
• Daily inspection through check list
• Be aware of other risks (electrical line).
• Be in control of the movement at all times.
17
Roles & Responsibilities
Crane Operator Must NOT:
18
Roles & Responsibilities
Riggers Role
• Attach & remove the lifting gears (slings, shackles, tag lines, etc.),
• Shall be able to select lifting gears suitable for the loads to be lifted,
19
Roles & Responsibilities
Signal Man:
• Supervises the lifting operations,
• Is responsible for the safety of the whole lifting operation,
• Shall have been trained in the job or shall be able to demonstrate his ability
& experience,
• Shall ensure the riggers operate safely and follow the basic rules for safe
lifting (use of tag lines, means of escape, safe location, etc.),
• Shall ensure that personnel not involved with the lifting operation is kept
well away,
• Shall keep visual or radio communication with the crane driver,
• Shall ensure that he is identified & fully understood by the crane driver and
by the riggers.
20
Method of slinging the load
21
Method of slinging the load
22
Method of slinging the load
23
Method of slinging the load
24
Method of slinging the load
25
Method of slinging the load
26
Method of slinging the load
27
Method of slinging the load
28
Method of slinging the load
29
Method of slinging the load
30
Method of slinging the load
31
Whenever any sling is used, the following practices shall
be observed!
1.Slings that are damaged or defective shall not be used.
2.Slings shall not be shortened with knots or bolts or other
makeshift devices.
3.Sling legs shall not be kinked.
4.Slings shall not be loaded in excess of their rated capacity.
5.Slings used in a Basket Hitch shall have the load balanced to
prevent slippage.
6.Slings shall be securely attached to the load.
32
7.Slings shall be padded or protected from the sharp edges of
their loads.
8.Suspended loads shall be kept free of obstructions.
9.All employees shall be kept clear of loads about to be lifted
and of suspended loads.
10.Hands or fingers shall not be placed between the sling and
it’s load while the sling is being tightened around the load
11. Shock loading is prohibited.
12. A sling shall not be pulled from under a load when the
load is resting on the sling.
33
Lifting Gear Inspection
Examples of wire ropes sling to be removed from service
34
Lifting Gear Inspection
35
Lifting Gear Inspection
Examples of shackles to be removed from service
36
37
Remember Life Saving Rules
• Don’t allow any one under suspended load
or between suspended load and fixed
objects.
38
Thank you
39